This document is Addendum 3 for a Request for Qualifications (RFQ-8-25-07) issued by Brevard County Purchasing Services in Florida for Professional Engineering Continuing Consultant Services focused on Stormwater Master Planning & Analysis and Pollution and Flood Reduction Design Projects. The addendum, dated January 16, 2025, provides clarifications and responses to multiple questions from potential bidders, updates key dates, and modifies submission requirements. The proposal opening date has been changed to Friday, February 7, 2025 at 10:00 am, with a final deadline for questions set for Tuesday, January 21, 2025 at 5:00 pm.
The addendum addresses several critical contract terms and bidding conditions, including insurance requirements, indemnification provisions, and project experience submissions. Key clarifications include allowing two-page resumes, permitting projects currently in design, maintaining a 5-year limit on project experience, and confirming that bidders may submit six projects per service line. The County consistently responded to most substantive contractual modification requests with "Contract terms may be negotiated after the lowest responsible bidder has been determined," indicating flexibility in final contract negotiations while maintaining core requirements.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Services 2725 Judge Fran Jamieson Way
Building C, Room 303 Viera, Florida 32940
Professional Engineering Continuing Consultant Services for Stormwater Master Planning & Analysis and Pollution and Flood Reduction Design Projects
RFQ-8-25-07
January 16, 2025
Addendum 3
TO ALL PROSPECTIVE CONTRACTORS
This is Addendum 3 and shall be considered as part of the original advertisement package for the above-mentioned Request for Qualifications. Consultants are requested to acknowledge receipt of this Addendum with their submission.
CLARIFICATION TO QUESTIONS ASKED RECEIVED:
1. Question: There are three indemnifications (General Condition #17 on p. 4 of the RFQ, p. 23 of the RFQ, and Section 24 of the draft contract). Will the County consider changing these indemnifications to match the Florida statutes and to align with professional liability insurance policies?
Response: No.
2. Question: Warranties are appropriate for construction work. Warranties for design work are not insurable under professional liability insurance policies. Will the County strike “and/or services” from General Condition #22 Warranty on p. 5 of the RFQ so the County can avail itself of the Consultant’s professional liability insurance coverage in the event of a claim?
Response: No.
3. Question: Indemnification and Insurance Requirements, p. 23 of RFQ and Section 24 of the draft contract. Will the County change the additional insured requirement to also accept a waiver of subrogation in lieu of additional insured status on the professional liability policy? Professional liability insurance policies do not allow additional insured parties to be named.
Response: Contract terms may be negotiated after the lowest responsible bidder has been determined.
4. Question: Indemnification and Insurance Requirements, p. 23 of RFQ and Section 24 of the draft contract. Will the County change the additional insured requirement to also accept a waiver of subrogation in lieu of additional insured status on the professional liability policy? Professional liability insurance policies do not allow additional insured parties to be named.
o Section 4 – Consultant Responsibilities. Modify “The Consultant warrants the adequacy of the final design…” to “The Consultant shall be responsible for the adequacy of the final design…” o Section 4, (12). Modify “shall not be deemed to diminish the Consultant's warranty set forth in this Contract” to “shall not be deemed to diminish the Consultant's obligations set forth in this Contract.”
Engineering Continuing Consultant Services
RFQ-8-25-07
January 16, 2025 Addendum 3 – Page Two o Section 17 – Quality Control. Modify “The Consultant warrants a high level of quality control and accuracy” to “The Consultant is responsible for the standard level of quality control and accuracy.” “A high level” elevates the standard of care, which is also uninsurable.
5. Question: Regarding the Contract:
a. Is the County willing to modify the indemnification provision to exclude the requirement in the case of negligence by the County?
b. Is the second sentence of Section 4 of the contract able to be removed or modified?
c. Is the County willing to modify Section 16 of the County contract to state that the contractor shall not be responsible for any revisions, corrections, amendments, and derivative works by a third party?
d. Is the County willing to include the following language: PURSUANT TO FLORIDA STATUTE
§558.0035, AN INDIVIDUAL EMPLOYEE OR AGENT MAY NOT BE HELD INDIVIDUALLY
LIABLE FOR NEGLIGENCE.
6. Question: Regarding Tab 5: Related Experience:
a. Would the County allow projects up to 10 years old instead of 5?
b. Is it acceptable to include projects currently in design?
c. Addendum 1, question 12 states that 6 projects per service may be included. Addendum 2, question 10 states that no more than 6 projects may be included. Is the total number of projects allowed 6, or 6 per service for a total of 12?
Response:
a. No.
b. Yes.
c. Six projects per service.
7. Question: Can you please verify that the number of projects allowed to be provided in Tab 5 are twelve
(12) total, six (6) for each service line?
Response: Six projects per service is correct.
8. Question: Can you please verify if two-page resumes are allowed?
Response: Two page resumes are allowed. Double sided will be one sheet front and back. Single sided will be two pages each typed in the front only.
9. Question: Can the opening date be extended to February 14th?
Response: We will consider February 7th.
Engineering Continuing Consultant Services
RFQ-8-25-07
January 16, 2025 Addendum 3 – Page Three
ADDITIONAL INFORMATION:
The deadline for Final Questions has changed to Tuesday, January 21, 2025 at 5:00 pm. No further questions considered after this date and time.
Please note that the proposal opening date and time has changed to Friday, February 7, 2025 @ 10:00 am.
All other terms and conditions remain unchanged.
Sincerely, Mary Bowers Purchasing Manager
END OF ADDENDUM NO. 3
| Professional Engineering Continuing Consultant Services for Stormwater Master Planning & Analysis and Pollution and Flood Reduction Design Projects |
| RFQ-8-25-07 |
| January 16, 2025 |
| Addendum 3 |
| TO ALL PROSPECTIVE CONTRACTORS |