Addendum 3 26156.pdf

PDF 121 KB Posted

Attached to
472/26156. MDL; Chippewa C.F. Sanitary Sewer Upgrades
Solicitation number
RFQ 171 270000000012 5
Issued by
Cass County, Kincheloe CDP, Michigan

About this file

This is Construction Bid Addendum No. 3 issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design & Construction Division for the Chippewa Correctional Facility Sanitary Sewer Upgrade project (File Number 472/26156.MDL). The addendum, issued on October 30, 2026, provides clarification regarding pumps required for the sewer bypass system and was distributed to all bidders prior to the bid opening scheduled for November 4, 2026. The professional firm managing the project is Matrix Consulting Engineers, with Mike Lusk serving as Project Director. Bidders are required to acknowledge receipt of this addendum in their bid submission; failure to do so may result in bid rejection.

The addendum clarifies that the bypass system pumps must accommodate an average flow of 0.35 MGD, a peak day flow of 0.90 MGD, and a peak hourly flow of 1.5 MGD. The contractor will be responsible for determining the routing of the bypass piping as part of a required bypass plan submittal during construction, with the plans referencing the upstream manhole and downstream lift station for routing guidance. This addendum becomes part of the contract documents and was approved by Project Director Mike Lusk and Matrix Consulting Engineers Professional Troy Thelen on October 30, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 (Rev 6/25)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND

BUDGET

State Facilities Administration Design & Construction Division

CONSTRUCTION BID ADDENDUM NO. 3

This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.

TO:

ALL BIDDERS

DATE ISSUED

10/30/2026

PROJECT NAME

Chippewa Correctional Facility – Sanitary Sewer Upgrade

FILE NUMBER

472/26156.MDL

PROFESSIONAL

Matrix Consulting Engineers

PROJECT DIRECTOR

Mike Lusk

BID OPENING DATE:

11/4/2026

ADDENDUM ITEMS:

1. Clarification: Pumps will be required for the sewer by pass system. 0.35 MGD average flow, 0.90 MGD peak day flow, and 1.5 MGD peak hourly flow. The routing of the bypass piping will be determined by the contractor, as part of the by-pass plan that is required for submittal during construction. The plans indicate the upstream manhole and downstream lift station for reference.

ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.

PROFESSIONAL: Troy Thelen, Matrix DATE: 10/30/2026

APPROVED BY:

PROJECT DIRECTOR: Mike Lusk

DATE: 10/30/2026

File details come from the government source that posted it. Updated .