This Construction Bid Addendum No. 2 is issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design & Construction Division for the Chippewa Correctional Facility Sanitary Sewer Upgrade project (File Number 472/26156.MDL). The project, managed by professional consultant Matrix Consulting Engineers under Project Director Mike Lusk, involves the upgrade of sanitary sewer infrastructure at the correctional facility. The bid opening date is November 4, 2026, and the substantial completion deadline is Friday, January 7, 2028. Bidders must acknowledge receipt of this addendum in their bid submission; failure to do so may result in bid rejection.
The addendum provides eleven clarifications and one re-issuance of construction documents (sheets C-002 and C-003) that modify and interpret the original bidding documents. Key specifications include: all control devices in the Bar Screen room must be Class 1, Division 1 listed; the pit opening for screening equipment shall be 8 feet by 4 feet; the bar screen angle is 10 degrees from vertical; the channel depth is 13.34 feet from slab to bottom; the lift station discharge is a 6-inch force main; a discharge chute rather than conveyor is required; and anticipated work within the secured area is limited to a temporary bypass-pumping connection at an existing manhole. The contractor bears responsibility for bypass-pumping design, sequencing, temporary pipe-crossing protection, and overall project means and methods, subject to contract document requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
10/28/2026
PROJECT NAME
Chippewa Correctional Facility – Sanitary Sewer Upgrade
FILE NUMBER
472/26156.MDL
PROFESSIONAL
Matrix Consulting Engineers
PROJECT DIRECTOR
Mike Lusk
BID OPENING DATE:
11/4/2026
ADDENDUM ITEMS:
1. Re-issued sheets C-002 and C-003 (attached).
2. Clarification: It is up to the General Contractor on how the scope of work is broken down between subcontractors. It is up to the General Contractor to ensure the entire scope of work is included in the bid package for a completed project.
3. Clarification: All control devices (including sensors, thermostats, switches, actuators, junction boxes and associated fittings) located in the Bar Screen room are to be Class 1, Division 1 listed.
4. Clarification: Pit opening for screening equipment to be 8’ x 4’ as shown on A101.
5. Clarification: Based on current understanding, the only anticipated work within the secured area is the temporary bypass-pumping connection. The plans identify the existing manhole within the secured area as the proposed upstream connection point for the bypass system.
6. Clarification: The plans and specifications identify the contractor’s bypass-pumping and shutdown responsibilities. In general, the anticipated approach is to connect the temporary bypass system to the upstream manhole referenced in Item 2, route the temporary piping across the perimeter road using an appropriate temporary pipe-crossing ramp or protection system, and continue the piping to the existing lift station. This arrangement would allow the existing manual screen to be fully bypassed during the work. Final means, methods, sequencing, and temporary bypass-system design remain the contractor’s responsibility, subject to the requirements of the Contract Documents.
7. Clarification: The construction documents were updated to identify the lift station discharge as a 6-inch force main.
8. Clarification: Bar Screen is to be 10 degrees from vertical.
9. Clarification: Downstream peak flow elevation is shown on Duperon detail on sheet C-003. The average flow is approximately 3” in depth.
10. Clarification: A conveyor is not required; discharge chute to be utilized as shown on construction documents.
11. Clarification: The channel depth is shown on C-003 of the construction docuements, at 13.34’ from slab to bottom of channel.
12. Clarification: Substantial Completion is Friday January 7th, 2028.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Troy Thelen, Matrix DATE: 10/28/2026
APPROVED BY:
PROJECT DIRECTOR: Mike Lusk
DATE: 10/28/2026
BENCHMARK
CAUTION!!
CAUTION!!
CAUTION!!
M-80
E1
E2
PAVING LEGEND
LEGEND
NF
N
Site
Location Map
PROJECT RESTORATION
GPR INVESTIGATION NOTE
SANITARY BY-PASS
SAN. MANHOLE SCHEDULE
1E1
E2 2
N F
E N
G I N
E E
R S
C i v i l
E n g i n e e r s
L a n d
S u r v e y o r s
L a n d
P l a n n e r s
W o o d w a r d A v e n u e
P o n t i a c M
I
T e l (2
F a x (2
N F
E P
R O
J E
C T
N O
N
N
F E
P R
O J E
C T
N O
N
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
IMPROVEMENT
PLANS, DETAILS
AND SESC
C-002
NF
N
EW
S
SCALE 1" = 20'TRENCH DETAIL D
SEWER UNDER ROADBED
OR WITHIN INFLUENCE OF ROADBED SILT FENCE DETAIL
SECTION A-A
FRONT VIEW
PLAN VIEW
SECTION B-B
STANDARD SANITARY MANHOLE DETAIL GUARD POST DETAIL
NOTES
SOIL EROSION NOTE
SOIL CONDITIONS
SOIL EROSION CONTROL
CONCRETE PAVEMENT SECTION
CONSTRUCTION SEQUENCE TIMING CHART
SILT SACK FILTER DETAIL
BAG DETAIL
INSTALLATION DETAIL
ASPHALT PAVEMENT SECTION
PERIMETER ROAD CLOSURE NOTE
EXISTING SHED REMOVAL NOTE
SHORING AND DEWATERING NOTE
N F
E N
G I N
E E
R S
C i v i l
E n g i n e e r s
L a n d
S u r v e y o r s
L a n d
P l a n n e r s
W o o d w a r d A v e n u e
P o n t i a c M
I
T e l (2
F a x (2
N F
E P
R O
J E
C T
N O
N
N
F E
P R
O J E
C T
N O
N
M a t r ix
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
R O
B
ER
T C
. H A
LL
, R
A , N
C A
R B
, D
IR
EC
TO
R
FA
C
IL
IT
IE
S
A N
D B
U
SI
N
ES
S
SE
R V
IC
ES
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
CONCRETE PIT /
SCREENING
EQUIPMENT
DETAILS
C-003
File details come from the government source that posted it. Updated .