Addendum #2 Final.pdf
PDF 694 KB Posted
- Attached to
- MIDD-024-010 Paving and Utility Repair
- Solicitation number
- MIDD-024-010
- Issued by
- Providence County, Misquamicut CDP, Rhode Island
About this file
This document is Addendum No. 2 for the Town of Middletown, Rhode Island's Bid Number MIDD-024-010 for Paving and Utility Repair, issued on July 18, 2024. The addendum modifies and supplements the original bid package, providing detailed clarifications and revisions to the project scope. The project encompasses road and utility improvements for six road segments: Boulevard, Rosedale Terrace, Ellen Road, Mianonomi Avenue, Sherwood Road/Gibson Road, and Columbia Road. Key modifications include a revision to the estimated quantity of 10" HDPE Storm Drain Pipe from SK-17 to 365 linear feet, and responses to bidder questions regarding pavement depths, installation techniques, and road-specific quantities.
The addendum includes a comprehensive breakdown of bid items for each road segment, detailing quantities for various construction activities such as site preparation, sediment barriers, sawcutting, asphalt removal, full depth replacement, Cape Cod berm installation, driveway aprons, grading, seeding, and utility work. The document provides granular information on storm drain pipe installations, catch basin replacements, sewer manhole adjustments, and other infrastructure improvements. Notable technical specifications include requirements for bituminous concrete berm installation, pavement layering for driveways and sidewalks, and specific compaction and installation standards following RIDOT (Rhode Island Department of Transportation) specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum #1 w attachments.pdf | ||
| MIDD-024-010 Paving _ Utility Repair Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MIDD-024-010 PAVING AND UTILITY REPAIR
TOWN OF MIDDLETOWN, RHODE ISLAND
INVITATION TO BID
FOR
BID NUMBER MIDD-024-010
PAVING & UTILITY REPAIR
ADDENDUM No. 2 July 18, 2024
TO ALL CONTRACTORS ESTIMATING:
Bidders are hereby informed that the specifications and instructions for the above-mentioned contract are modified, corrected, and/or supplemented as follows and Addendum No. 2 becomes part of the Invitation to Bid package.
BIDDING AND CONTRACT REQUIREMENTS:
1. Delete Section VII Bid Form, Bid Item No. 30 to Bid Item No. 39 in its entirety and insert revised Section VII Bid Form, Bid Item No. 30 to Bid Item No. 39, attached to this
Addendum No. 2.
Bid Item No. 31 - 10” HDPE Storm Drain Pipe SK-17 estimated quantity has been revised to 365 linear feet.
CLARIFICATIONS:
1. The Response to Questions received are below and made part of the Invitation to Bid package.
2. The Attendance Sheet from the mandatory Pre-Bid Meeting held on July 12, 2024 is attached.
RESPONSE TO QUESTIONS RECEIVED AS OF JULY 15, 2024:
1. Question: Does the Invitation to Bid package have a breakdown of quantities for each individual road?
Response: No. The quantities provided on the Bid Form in Section 5 are for all the roads combined within the project scope. Sketches SK-1 to SK-6 show the approximate length of each road section. SK-18 shows the four (4) roads that are proposed to be reclaimed and the section view lists the approximate width of each road segment. A separate document has been attached which has a breakdown of the proposed bid items for each road and the approximate quantities for each road segment.
2. Question: Can you confirm that the Cape Cod berm must be installed with both the binder and surface courses of asphalt pavement?
Response: Yes. Bituminous concrete berm is required with the installation of the binder course. Since the paving operations are a two (2) step process, with a 6-month minimum waiting period, all drainage needs to be controlled for the entire waiting period to prevent runoff and erosion to adjacent properties.
3. Question: Can you confirm that the pavement depths for the driveways shall match the roadways, 2 ½” binder course and 1 ½” surface course?
Response: Bid Item No. 7 Asphalt Driveway Apron (Handwork) includes pavement based on a 2.5-inch binder course and a 1.5-inch surface course. All driveway binder course installation shall be installed monolithically with the roadway installation. No cold joint is allowed.
4. Question: Can you confirm that the asphalt pavement for the sidewalks must be installed in two lifts, i.e. 1 ½” binder course and 1 ½” surface course.
Response: The bituminous concrete sidewalk shall be installed in conformance with
RIDOT Specification Section 905 which states the asphalt can be installed in one or two lifts. The sidewalk can be installed in one 3-inch compacted layer but must be uniformly compacted to the required depth and density. Compaction shall be with a vibratory roller acceptable to the Owner. The Town prefers the sidewalk be installed in two equal lifts.
APPENDIX
ATTENDANCE SHEET
ATTACHMENTS
30 6” Sump Line SK-17 linear feet $ .
10” HDPE Storm Drain Pipe SK-17 linear feet $ .
Drop Inlet, RIDOT Stnd 4.5.0 with ridot frame and grate 6.3.0 8 each $ .
4” HDPE Storm Drain Pipe, 0’-10’
13 linear feet $ .
8” HDPE Storm Drain Pipe, 0’-10’
57 linear feet $ .
15” HDPE Storm Drain Pipe, 0’-10’
70 linear feet $ .
24” HDPE Storm Pipe, , 0’-10’
14 linear feet $ .
4' Diameter Drain Manhole RIDOT Standard 4.2.0 1 each $ .
Heavy Duty Round Frame and Cover, RIDOT Standard
6.2.1 1 each $ .
Remove and Dispose Existing Frame and Cover, Install New 24” Diameter Heavy Duty Frame and Cover, RIDOT Standard 6.2.1 1 each $ .
Town of Middletown, RI Invitation to Bid
MIDD-024-010 Paving & Utility Repair
Town of Middletown, RI
Addendum No. 2
Breakdown of the Proposed Bid Items for Each Road
Item
Description
# of
Units
Boulevard
Rosedale
Terrace
Ellen Road
Mianonomi
Avenue
Sherwood
Road/Gibson
Road
Columbia
SK-1 SK-2 SK-3 SK-4 SK-5 SK-6
Site Preparation and
Final Cleanup
1 lump sum
N/A
Sediment Barrier
5,500 linear feet
1,960
2,512
Sawcutting (5" depth)
2,500
Remove Asphalt to
Gravel Base
5,600 square yards
2,968
2,067
Full Depth
Replacement
4,500
2,385
1,661
Cape Cod Berm
6,000
1,900
1,200
2,700
Asphalt Driveway
Apron (Handwork)
Complete In Place
1,600
Sherwood
Fine Grade Shoulders 3,500
Loam and HYDRO
Seed
3,500
12" Stop Bar
Pavement Markings
Traffic Control
Devices
1 lump
Dust Control 18,000
6,303
1,154
1,695
4,201
3,394
1,253
Layout 1 lump
12" HDPE Storm
Drain Pipe, 0’-10’ including gas and water crossing
Sherwood
4' Catch Basin
RIDOT Standard
4.4.0
6 each
Catch Basin Frame and Grate RIDOT
Standard 6.3.2
6 each
Remove, Dispose and Replace Backfill
1,260 cubic
2" Temporary Patch 2,210
Adjust Catch Basin
Frame and Grate to
Binder Grade
28 each
19A
Adjust Catch Basin
Frame and Grate to
Finish Grade
28 each
Adjust Sewer
Manhole Frame and
Cover to Binder
Grade
20 each
Sherwood
20A
Adjust Sewer
Manhole Frame and
Cover to Finish
Grade
20 each
Adjust Water Gate
Boxes and Gas Gate
Boxes to Binder
Grade
35 each
21A
Adjust Water Gate
Boxes and Gas Gate
Boxes to Finish
Grade
35 each
Trench Repairs (0'-4'
Deep)
Trench Repairs (4'-8'
Deep)
Hand Deliver Door
Hanger
Notices/Coordinate
Parking Alternate
Locations each
Sherwood
Boulevard 4'
Bituminous Concrete
Sidewalk, RI STD
43.2.0
Line striping (4"
White Fog & 4"
Yellow Centerline)
9,500
5,703
3,797
6” Sanitary Sewer
Lateral SK-17
8” Sanitary Sewer
Main SK-17
Sewer Manhole 4’
Diameter, SK-8, SK-
9, SK-10
vertical
6” Sump Line SK-17 300
Sherwood
10” HDPE Storm
Drain Pipe SK-17
Drop Inlet, RIDOT
STD 4.5.0 with
RIDOT Frame and
Grate RI STD 6.3.0
8 each
4” HDPE Storm
Drain Pipe, 0’-10’
8” HDPE Storm
Drain Pipe, 0’-10’
15” HDPE Storm
Drain Pipe, 0’-10’
Sherwood
24” HDPE Storm
Pipe, , 0’-10’
4' Diameter Drain
Manhole RIDOT
Standard 4.2.0
1 each
Heavy Duty Round
Frame and Cover, RIDOT Standard
6.2.1
Remove and Dispose
Existing Frame and
Cover, Install New
24” Diameter Heavy
Duty Frame and
Cover, RIDOT
Standard 6.2.1
Sherwood
Remove and Dispose 6 each
Existing Sewer
Frame and Cover, Install New 30”
Diameter Heavy
Duty Sewer Frame and Cover
Adjust Telephone 4 each
Manhole Frame and Cover to Binder
2 0 0 2 0 0
Grade
Adjust Telephone 4 each
Manhole Frame and Cover to Finish
2 0 0 2 0 0
Grade
Adjust Drain 1 each
Cover to Binder
0 0 0 1 0 0
Adjust Drain 1 each
Cover to Finish
Sherwood
Cold Recycled Base
Course
5,425
SY
1,470
2,885
1,070
5' Diameter Catch
Basin RIDOT
Standard 4.4.0
Existing Sewer
Frame and Cover, Install New 28”
Diameter Heavy
Duty Sewer Frame and Cover
4 each
Existing Sewer
Frame and Cover, Install New 24”
Diameter Heavy
Duty Sewer Frame and Cover
Full Depth Sawcut of
Portland Cement
Concrete
Sidewalk/Driveway
| Addendum No. 2 Middletown Paving and Utility Repair Project |
| 01 Pre-Bid Sign In Sheet |
| 02 Revised Page Section VII Items 30 to 39 |
| 03 Section VII Bid Form Breakdown 2024-07-18 |
File details come from the government source that posted it. Updated .