Addendum_2.pdf
PDF 318 KB Posted
- Attached to
- Demolition of Former Motel in Micco
- Solicitation number
- B-2-26-38
- Issued by
- Brevard County, Miramar Beach CDP, Florida
About this file
This Addendum 2 document pertains to the Demolition of Former Motel in Micco project located in Brevard County, Florida. The addendum modifies the original contract documents for the demolition and complete removal of the former motel, two-story duplex building, and accessory structures situated at 8820 US Highway 1, Micco, Florida. The scope of work requires the contractor to furnish all labor, materials, tools, equipment, and transportation necessary to demolish and remove all structures, including foundations, footings, walls, roofs, septic tanks, drain fields, and grease traps. The combined base area of the former motel and duplex is 4,759 square feet with a maximum structure height of approximately 30 feet. The existing pavement on the east side of the motel must remain in place and be protected throughout the project. The contractor is responsible for verifying all existing site conditions and reporting any discrepancies between contract documents and field conditions to the County.
The specific modifications outlined in Addendum 2 are not detailed within this summary, as the document content requires review to identify particular changes to contract terms, pricing, timelines, or technical specifications. The contractor must comply with all applicable federal, state, and local laws, ordinances, regulations, permitting requirements, and OSHA standards throughout project execution.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Services 2725 Judge Fran Jamieson Way
Building C, Room 303 Viera, Florida 32940
Demolition of Former Motel in Micco Bid# B-2-26-38 May 15, 2026
ADDENDUM 2
TO ALL PROSPECTIVE BIDDERS
This is an Addendum to and shall be considered as part of the original bid package for the above-mentioned bid. Please acknowledge receipt of Addendum 2 in space provided on Price Sheet. Bidders are requested to acknowledge receipt of this addendum with their bid.
CLARIFICATION TO QUESTIONS RECEIVED:
Question 1: Please confirm that a Brevard County Excavation/Demolition Contractor's License is required to perform the excavation of the septic tank, drain fields, and sub-grade areas for this project.
Answer 1: The County is accepting bids from licensed General Contractors, Building Contractors, and Demolition Contractors as indicated on page 11 of the Invitation to Bid.
Furthermore, the Contractor shall meet the Florida Department of Health (DOH) permitting requirements for the abandonment of the Onsite Sewage Treatment and Disposal System.
To clarify, the County has added the below text in red to page 17 of the Invitation to Bid:
The Contractor shall demolish, remove, and properly dispose of all septic system components, tanks, drain fields, and contaminated soil. Removal must be at least five feet below the finish grade of the site. Replace all removed soils with clean, compactable fill and grade to blend and match surrounding grades. The Contractor shall be responsible for obtaining a permit from the Florida Department of Health (DOH) – Brevard County (Environmental Health Services) for abandonment of the Onsite Sewage Treatment and Disposal System.
o Per the DOH – permit requirements for Abandonments, a pump-out receipt from a certified septic contractor (or a contractor acceptable to the DOH) indicating the amount of wastewater pumped must be submitted to the DOH. The Contractor shall be responsible for meeting this requirement.
Question 2: Please confirm the specific requirements for erosion and sediment control for this project. Specifically, does the County require full SWPPP (Stormwater Pollution Prevention Plan) Compliance, including:
1. Installation and maintenance of silt fencing?
2. Construction of a stabilized construction entrance/exit?
3. Ongoing record keeping and inspections (weekly or after rain events) as per Florida
DEP standards?
Clarification is needed to ensure all necessary environmental controls and administrative costs for compliance are accurately reflected in the bid proposal.
Answer 2: Per the AHJ (Brevard County) to obtain a demolition permit for this project, full SWPPP is not required.
Question 3: Please clarify the requirements for the existing well(s) located on the property. Will the existing well(s) remain in place for future use, or is the contractor required to perform a formal abandonment? If abandonment is required, please confirm that the contractor is responsible for obtaining the necessary St. Johns River Water Management District (SJRWMD) or Brevard County permits and providing the required abandonment logs upon completion.
Answer 3: Please refer to page 18 of the Invitation to Bid:
The Contractor shall locate the public well supply, located at the northwest corner, and cap the well line using a PVC cap. See Attachment B for additional information.
Question 4: Will the awarded contractor be allowed to work weekends?
a. (bid docs state Monday - Friday 6am-6pm & anything beyond that needs to be approved in writing 24 hours in advance)
Answer 4: For work outside the standard work hours (such as weekends), please refer to item
11. Working Hours on page 16 of the Invitation to Bid for directions (see underlined text):
The standard working hours for this project are 6:00 am – 6:00 pm Monday through Friday.
No work will be permitted on County-observed holidays. Work outside the standard working hours (such as weekends) must be approved, in writing, at least 24 hours in advance by the County’s Public Works Department/Facilities authorized representative.
Question 5: Where is the closest available water located for us to fill our water trucks up with?
a. (bid docs state there is no water on site, but we are wondering what is closest for us to use)
Answer 5: There is a fire hydrant located within about one mile from the site. The Contractor may apply for a fire hydrant meter from the Brevard County Utility Services Department:
Barefoot Bay Water & Sewer 931 Barefoot Blvd, Suite 2 Barefoot Bay, FL 32976 Phone: 772-664-5916 Email: BFB.Billing@brevardfl.gov The County will pay the costs associated with the fire hydrant meter and water usage for the wet demolition.
Question 6: Will the county spray/smoke the porch area on the rear dwelling where the swarm of bees are located?
Answer 6: Prior to demolition, the County shall be responsible for the proper removal/relocation of the bees.
mailto:BFB.Billing@brevardfl.gov
Question 7: At the pre bid meeting it was observed that there was a large beehive on the smaller 2 story building. Will the county be taking care of that or does the contractor need to budget for it?
Answer 7: Please see the response to Question 6.
Question 8: Will the County provide a location for us to fill our water truck?
Answer 8: Please see the response to Question 5.
Question 9: Is water required only for the demolition of the structures or is it required during loading out of the construction debris as well?
Answer 9: Wet demolition for this project involves the continuous application of water to a structure before, during, and after demolition to suppress dust and prevent airborne contaminants. This is often referred to as the “wet-wet-wet” method.
Question 10: Does the asphalt parking lot on the east side need to be removed?
Answer 10: No. Per the Invitation to Bid, page 18, the existing pavement on the east side of the motel shall remain in place and be protected during the project.
Question 11: Does the camper need removed?
Answer 11: Yes. Per the Invitation to Bid, page 18, the Contractor shall remove and properly dispose of all trash, debris, furniture, vehicles, and all other materials. This removal includes the camper. The County checked the status of the camper with the Brevard County Sheriff’s Office (BSCO), and the camper is cleared to be removed.
Please Note: The Contractor is to properly remove and dispose of any propane gas tanks, etc.
Please Note: The duration to achieve Substantial Completion from the Notice to Proceed is revised from 150 calendar days to thirty (30) calendar days. The duration to achieve Final Completion from Substantial Completion remains unchanged.
THE BID OPENING DATE HAS BEEN EXTENDED UNTIL FRIDAY, MAY 22, 2026 NO LATER
THAN 10:00 A.M.
All other terms and conditions remain unchanged.
Sincerely, Mary Bowers Purchasing Manager
END OF ADDDENDUM 2
File details come from the government source that posted it. Updated .