Addendum 2.pdf
PDF 122 KB Posted
- Attached to
- Piccowaxen Middle School Boiler Replacement
- Solicitation number
- BPM054368
- Issued by
- Charles County, Maryland
About this file
This is Addendum 2 to the Piccowaxen Middle School Boiler Replacement project issued by Charles County Public Schools in Maryland. The addendum provides clarifications and modifications to the original bid documents for the replacement of two existing oil-fired hot water boilers and associated mechanical equipment at the school facility. The project scope includes replacement of flues, air dirt separator, chemical shot feeder, expansion tank, hot water piping up to the existing main building circulator pumps, and fuel oil piping downstream of the boilers in the mechanical equipment room. The boilers will be equipped with fuel oil transfer tanks, strainers, and standard valves to enhance burner efficiency and will be integrated with the existing building control system.
The specific modifications contained within Addendum 2 address questions and requests for clarification submitted by prospective bidders during the bidding process. These amendments are issued to ensure all qualified contractors have access to consistent and accurate information regarding project requirements, specifications, and expectations. All addenda issued to the original solicitation become part of the contract documents and must be acknowledged by bidders in their proposals. Contractors are required to review and incorporate all addenda requirements into their bids to ensure compliance with the updated project specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum I-Questions, Responses & Clarifications.pdf | ||
| Bid Advertisement Picco Boiler 12-1-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .