Addendum 2.pdf
PDF 2 MB Posted
- Solicitation number
- RFB 785 2600000632 5
- Issued by
- Kentucky
About this file
This is Addendum No. 2 to Invitation to Bid (RFB-01-27) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the Wastewater Treatment Plant Replacement project at Bell County Forestry Camp, Kentucky Department of Corrections in Pineville, Kentucky. The addendum addresses clarifications and modifications to the original bid documents in response to contractor questions regarding the Sequencing Batch Reactor (SBR) system design, electrical specifications, equipment manufacturer approvals, and hazardous location classifications. Key modifications include confirmation that electrically actuated valves shall operate as open/close rather than modulated; approval of MK Plastics as an acceptable manufacturer for exhaust fans in addition to the specified Greenheck brand; approval of Pratt as an acceptable manufacturer for plug valves; and changes to the SBR control panel enclosure specification to require NEMA 4X rating with 304 or 316 stainless steel construction for outdoor installation. The addendum also includes revised and replacement drawing sheets (M-03-102, E-00-601, E-00-603, and E-03-101) that provide updated electrical riser diagrams, equipment schedules, panel schedules, and newly added SBR interconnection diagrams and post-equalization control panel wiring schematics.
The project clarifications confirm that no American Iron and Steel (AIS) or Build America Buy America (BABA) requirements apply to this contract. Hazardous location classifications have been updated to designate the influent pump station as Class 1 Division 1, and the SBR structure including the aerated sludge holding tank and post-equalization tank as Class 1 Division 2 hazardous locations, requiring compliance with NFPA 820 guidelines and NEC Articles 500 and 501 for all electrical equipment and wiring within these areas. Additional electrical modifications include updated service feeder specifications to match 400-ampere equipment sizing and coordinated control panel feeder specifications. The addendum was issued on June 19, 2026, and became binding upon issuance, requiring all prospective bidders to conform to these changes in their bid submissions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-01-27
FOR: Wastewater Treatment Plant Replacement Bell County Forestry Camp Kentucky Department of Corrections Pineville, Kentucky
DATE: June 22, 2026
RFB-785-2600000632
ADDENDUM NO. Two (2)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-01-27 For: Wastewater Treatment Plant Replacement Bell County Forestry Camp Kentucky Department of Corrections Pineville, Kentucky
Janis Wilhoite, Statewide Procurement Analyst II Division of Engineering and Contract Administration
GRW Project No. 5113-05 ADDENDMUM NO. 1
ADDENDUM NO. 2
WWTP Replacement
Bell County Forestry Camp
Kentucky Department of Corrections
GRW Project No. 5113-05
June 19, 2026
TO ALL PROSPECTIVE SUBMITTERS:
Be advised that the following clarifications and modifications are to be included in the above-referenced Project:
Contractor Questions
Questions Answers
1. Is this project AIS or BABA? No, there are no American Iron and Steel or Build
America Buy America Requirements
2. Drawing M-03-102: Should the electrically actuated valves be open/close instead of modulated?
Yes, see drawing revisions below.
3. Spec Section 465353 Paragraph 2.5.A: Should the electrically actuated valves be open/close instead of modulated?
Yes, see specification revisions below.
4. Drawing M-03-102: Please confirm that the electrically actuated air valves (Keynote 21) are located after the air header is split for each basin.
Confirmed, see drawing revisions below.
5. Drawing M-03-102: Please confirm that the two valves Keynote 21 points to are manual isolation butterfly valves and not electrically actuated air valves.
Confirmed, see drawing revisions below.
6. I see there are 2 exhaust fans listed, and both are listed as Greenheck. I understand you have spec'd MK Plastics fans on previous jobs in the past, especially in WWTP applications due to their strong ability to stand up to the corrosive environments. I wanted to reach out and see if it was possible to get MK Plastics approved as an equal alternate for this job. I would be happy to answer any questions you may have regarding this request.
Yes, MK Plastics will be added to the list of approved manufacturers in Specification
233423 Section 2.1.
7. Specification section 465363 part 2.7.B specifies a NEMA type 12 painted enclosure. However, plan sheet E-03-101 shows an SBR control panel that appears to be mounted outdoors. Please confirm if the
SBR control panel is to be mounted indoors
Panel shall be mounted outdoors and be
NEMA type 4x 304 or 316 stainless steel. See specification revisions below.
Questions Answers or outdoors and if it should be rated NEMA type 12 painted mild steel or NEMA type
4X 304 or 316 stainless steel.
8. Plan sheet E-03-101 keynote #1 states that an SBR interconnection diagram is located on sheet E-00-705. Plan sheet E-00-705 shows an interconnection diagram for the effluent pump station. An SBR system interconnection diagram or SBR P&IDs are not found in the plan sheets.
An SBR interconnection diagram has been added to the drawings. See drawing revisions below.
9. Per the project plan sheets the influent pump station is rated a C1D2 hazardous location. Please confirm the SBR basins, aerated sludge holding tank, and post-EQ tank are not rated hazardous locations as well.
The influent pump station should Class 1
Division 1 hazardous location. The entire SBR structure including the aerated sludge holding tank and the post-EQ tank should be rated as
Class 1 Division 2 hazardous locations. See drawing revisions below.
10. There isn't a wiring schematic for the post-equalization control panel. Can one be provided?
Yes, see drawing revisions below.
11. There isn't an interconnection diagram between the SBR control panel and the post equalization control panel as stated in keynote #14 on page E-03-101 can this be provided also?
Yes, see drawing revisions below.
12. Would you consider naming Pratt as an equal on the plug valves for this project?
Yes, see specification revisions below.
MODIFICATION TO THE DOCUMENTS
SPECIFICATIONS:
1. Specification 233423 “Power Ventilators” – Section 2.1.A: “Acceptable Manufacturers” shall be modified to include MK Plastics as an acceptable manufacturer.
2. Specification 331216 “Valves” – Section 2.2.N: “Acceptable Manufacturers” shall be modified to include Pratt as an acceptable manufacturer.
3. Specification 465353 “Sequencing Batch Reactor System”
Section 2.5.A: Change the Valve Table to the following.
Valves
Function Quantity Size Type Operator
Effluent 2 6” Butterfly Electric
Air 2 4” Butterfly Electric (Open Close)
Section 2.7.B: Change the second sentence to read
Control panel enclosure(s) shall be rated NEMA 4X and shall be constructed of 12-gauge
304 or 316 Stainless steel.
DRAWINGS:
1. Replace sheet M-03-102 in its entirety. Corrected keynote 21 and added keynote 29 regarding 4” butterfly valves.
2. Replace sheet E-03-101 in its entirety. Added a general note about hazardous rating. Added an interconnection diagram for the SBR control panel. Clarified various keynotes.
3. Replaced sheet E-00-601 in its entirety. Updated service feeder to match 400A equipment size. Clarified keynotes. SBR control panel feeder updated.
4. Replaced sheet E-00-603 in its entirety. Updated MDP to add actuator power (typ of 4). SBR control panel feeder updated.
5. Sheet E-07-101, 102, and 103 general note A shall have the rating changed from C1D2 to C1D1.
GRW Engineers, Inc.
Frank Egland, PE
ATTACHMENTS:
• Sheet M-03-102
• Sheet E-00-601
• Sheet E-00-603
• Sheet E-03-101
OPENINGS IN BOTTOM OF
WALL @ INV. ELEV. 1410.50
3'-3" W X 1'-6" H
OPENINGS IN BOTTOM OF
WALL @ INV. ELEV. 1410.50
3'-3" W X 1'-6" H
(BELOW)
1212 1212
HIGH POINT OF 6"
SLOTTED PIPE
℄ EL. 1428.50
LOW POINT OF 6"
SLOTTED PIPE
℄ EL. 1428.32
PR
IN
TE
D
: 6 /1
5/
:5
4P M
FI
LE
N
AM
E:
G
:\5
3- D
EC
A
D O
C M
E
ID
IQ
\0
5- Ph as e
A R ep or t B C
FC
W
W
TP
R ep la ce m en t\W or ki ng
D ra w in gs \A ut oC
AD
\5
3-
-M
-0 3-
2.
dw g
PL
O
TT
ED
B Y:
J R am ire z
GRW ENGINEERS, INC.
801 CORPORATE DRIVE
LEXINGTON, KY.
(859) 223-3999 / FAX (859) 223-8917
engineeringarchitecturegeospatial www.grwinc.com
SCALE: 3/8"=1'-0" 0 4' 6'2'
SEQUENCING BATCH REACTOR - UPPER PLAN
PLAN
NORTH
SHEET KEYNOTES:
1. SBR BASIN 1
2. SBR BASIN 2
3. POST-SBR EQ BASIN
4. AERATED SLUDGE HOLDING TANK (ASHT)
5. SBR DIFFUSER GRID (1 PER SBR BASIN)
6. SBR DECANTER MECHANISM (1 PER SBR
BASIN)
7. SBR WASTE SLUDGE PUMP (1 PER SBR
BASIN)
8. ASHT AERATOR/MIXER (TYP. OF 2)
9. ASHT WASTE SLUDGE PUMP (TYP. OF 2)
10. SBR BLOWER (TYP. OF 2) IN SOUND
REDUCTION ENCLOSURE, ON 4'-0" X 8'-0" X
12" CONCRETE BASE. TOP OF BASE, ELEV.
1429.00
11. ALUMINUM COVER, 4'-0"W X 5'-3"L, WITH
HINGES AND OPENING LATCH (TYP. OF 4),
MOUNTED FLUSH WITH TOP OF BASIN WALL
12. ALUMINUM COVER, 8'-0"L X 6'-0"W (TYP. OF 4),
MOUNTED FLUSH WITH TOP OF BASIN WALL
13. WASTE SLUDGE VALVE VAULT
14. POST-SBR DECANT VALVE VAULT
15. POST-EQ BASIN VALVE VAULT
16. ALUMINUM ACCESS LADDER
17. 1-1/2" ALUMINUM HANDRAIL, WITH 4" X 1/4"
ALUMINUM PLATE TOE BOARD
18. 4" DIP SBR BLOWER DISCHARGE PIPE,
CENTERLINE ELEV. 1429.67
19. 4" DIP SBR BLOWER DISCHARGE PIPE,
CENTERLINE ELEV. 1430.50
20. 6" DIA. STEEL PIPE BOLLARD, FILLED WITH
CONCRETE
21. 4" DIA. DI BUTTERFLY VALVE WITH ELEC.
MODULATING OPERATOR (1 PER BLOWER)
22. HANDRAIL MOUNTED DISSOLVED OXYGEN
PROBE AND ANALYZER
23. WATER LEVEL TRANSDUCER IN STILLING
WELL AND FLOAT SWITCH (TYP. OF 3)
24. 2" PVC WASTE FROM TERTIARY FILTERS, INV.
ELEV. 1427.00
25. 2" GATE VALVE
26. 6" DIA SLOTTED DI PIPE, SLOPED TO ASHT
27. 6" DI GATE VALVE W/ HANDWHEEL
OPERATOR
28. 6" 90° DI ELBOW
29. 4" DIA. DI BUTTERFLY VALVES WITH MANUAL
OPERATION
M-03-301
AutoCAD SHX Text
RTA DATE
AutoCAD SHX Text
DECA LOG #
AutoCAD SHX Text
A&E FILE NO.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DRAWING DATE
AutoCAD SHX Text
DRAWING INFORMATION
AutoCAD SHX Text 5113-05
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION OF REVISIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISION HISTORY OF THIS DRAWING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION OF REVISIONS
AutoCAD SHX Text
FRANKFORT, KENTUCKY
AutoCAD SHX Text
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
AutoCAD SHX Text
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
AutoCAD SHX Text
FINANCE AND ADMINISTRATION CABINET
AutoCAD SHX Text
COMMONWEALTH OF KENTUCKY
AutoCAD SHX Text
PON:
AutoCAD SHX Text
RTA
AutoCAD SHX Text
BELL COUNTY FORESTRY CAMP
AutoCAD SHX Text
PINEVILLE, KENTUCKY
AutoCAD SHX Text
WWTP REPLACEMENT
AutoCAD SHX Text 5-22-2026
AutoCAD SHX Text 5/22/2026
AutoCAD SHX Text 5/22/2026
AutoCAD SHX Text 2-785-2300001529
AutoCAD SHX Text
PFJ
AutoCAD SHX Text
MSW
AutoCAD SHX Text M-03-102
AutoCAD SHX Text
SEQUENCING BATCH REACTOR -UPPER PLAN
SPD
NEW SERVICE RISER
POLE BY CONTRACTOR.
MDP 208/120VAC, 3P, 4W, 60HZ, 400A, 22KAIC
400A 3P
30A 3P
400A 3P
NEW 400A, 3-POLE
AUTOMATIC TRANSFER
SWITCH. SERVICE
ENTRANCE RATED W/
LABELS AND MAIN
CIRCUIT BREAKER
(ELECTRONIC TRIP).
G
GROUNDING ELECTRODE
CONDUCTOR TO NEW
GROUNDING ROD TRIAD.N E
L
SPD
EXISTING OVERHEAD PRIMARY LINE
NEW 208V/3-PHASE/4-WIRE
TRANSFORMER BY UTILITY
(SIZED BY UTILITY).
125A 3P
50A 3P
20A 3P
ENGINE
CONTROLS
G
COOLANT
HEATERS
BATTERY
CHARGER
ENGINE EMERGENCY
SHUTOFF SWITCH
EXISTING 80kW
STAND-BY GENSET
208Y/120VAC, 3Ø,4W
SOUND-ATTENUATED
ENCLOSURE
#6 GROUNDING
ELECTRODE CONDUCTOR
MDP-16
MDP-14
GENERAL NOTES:
A. THE ELECTRICAL CONTRACTOR SHALL ADHERE TO ALL
NFPA 820 GUIDELINES FOR WASTEWATER TREATMENT
FACILITIES. SEE DETAIL #1 FOR MORE INFORMATION.
WHERE EQUIPMENT IS SHOWN TO BE IN CONFLICT WITH
CLEARANCE GUIDELINES, THE CONTRACTOR SHALL
RELOCATE EQUIPMENT TO MEET THE REQUIREMENTS.
B. ALL OUTGOING CIRCUITS SHALL BE INSTALLED AND
ROUTED UNDERGROUND AS DENOTED BY THE DASHED
INTERCONNECTION LINES.
C. EQUIPMENT IS NOT TO SCALE. SEE ELECTRICAL SITE PLAN
FOR EQUIPMENT LOCATIONS.
D. CONTROL PANELS HAVE BEEN DENOTED AS "CP". REFER
TO CONTROL CIRCUITS STARTING AT E-00-701 FOR MORE
INFORMATION ON CONTROLS AND REQUIREMENTS.
E. ALL EQUIPMENT ENCLOSURES SHALL BE RATED NEMA 4X
AND USE SS 304 OR 316 HARDWARE.
(2) PARALLEL SETS OF
(4)#3/0 IN 4"C. PROVIDE AN
ADDITIONAL (2) 4"C FROM
NEW SERVICE RISER POLE
AS SPARES.
CP CP
SBR
AERATION
BLOWERS
7.5HP
POST EQ
PUMPS
7.5HP
200A 3P
60A 3P
FEEDER SCHEDULE
1. (4)#350KCMIL & (1)#3G IN 4"C.
2. (2) PARALLEL SETS OF (3)#3/0 & (1)#6G IN 2-1/2'C.
3. (4)#12 & (1)#12G IN 1"C.
4. (4)#1 & (1)#6G IN 2"C.
5. (4)#8 & (1)#10G IN 1"C.
6. (4)#1/0 & (1)#6G IN 2"C.
7. (3)#3 & (1)#6G IN 1-1/2"C.
8. (3)#6 & (1)#10G IN 1-1/2"C.
9. (2)#12 & (1)#12G IN 3/4"C.
4 5
START/STOP
SIGNALS TO ATS
NOT TO SCALE1 SERVICE ENTRANCE EQUIPMENT RACK DETAIL
DETAIL NOTES:
1. ALL NUTS, BOLTS, WASHERS, ETC. SHALL BE
STAINLESS STEEL.
2. CONTRACTOR SHALL PROVIDE ANGLED CROSS
BRACING TO PREVENT LATERAL MOVEMENT AS
REQUIRED (NOT SHOWN).
3. ALL EQUIPMENT SHALL BE BOLTED TO STRUT
FRAME, UTILIZING STAINLESS STEEL ADAPTER
PLATES AS REQUIRED.
4. ALL REQUIRED CONDUITS ARE NOT
ILLUSTRATED ON THESE SCHEMATICS FOR
CLARITY, HOWEVER, SHALL BE PROVIDED AS
REQUIRED.
5. QUANTITY OF 3" SQUARE TUBE POSTS SHALL BE
AS REQUIRED TO SUPPORT THE EQUIPMENT
PROVIDED.
6. CONTRACTOR SHALL FURNISH AND INSTALL
NEW EXPANSION COUPLING IN VERTICAL
CONDUIT LEAVING BELOW GRADE.
7. THIS DETAIL IS INTENDED TO AID THE
CONTRACTOR IN THE REQUIREMENTS OF THIS
SYSTEM. THE ACTUAL LAYOUT AND ASSEMBLY
OF THE SERVICE ENTRANCE SHALL BE FIELD
COORDINATED.
STRUT TYPE CHANNEL
U-BOLTED TO POST
3000 PSI CONCRETE
CROWNED FOR DRAINAGE
36"
12" MIN.
3" GRS CONDUIT FILLED
WITH CONCRETE
AUTOMATIC
TRANSFER SWITCH
208/120V, 3PH, 4W - MDP
FEEDER FROM
PADMOUNT
TRANSFORMER
GROUNDING
ELECTRODE
(TYPICAL)
OUTGOING FEEDERS
TO 208V OR 120V
EQUIPMENT AS
REQUIRED
COAT WITH
BITUMASTIC
WHERE IN
CONTACT WITH
CONCRETE
FEEDER FROM
GENERATOR
NEW SPD IN NEMA
4X ENCLOSURE
(CONTRACTOR MAY
CHOOSE TO USE
INTEGRAL SPD
WITHIN MPD)
50A 3P
SBR WASTE
SLUDGE
PUMPS
3HP
100A 2P
PANEL A
NEW 15KVA
208/120V-1PH x
240/120V-1PH
PADMOUNTED
TRANSFORMER BY
CONTRACTOR
PANEL A PROVIDED BY
SUPPLIER IN PRE-FAB
TERTIARY FILTER BUILDING.
240/120V, SINGLE PHASE & 60A
MCB. CONTRACTOR SHALL
MAKE ALL FINAL
TERMINATIONS.
#6 GEC TO NEW
GROUNDING TRIAD
EXTENDED FROM
TRANSFORMER
GROUND BUS.
150A 3P
EFFLUENT
PUMPS
15HP
CP
200A 3P
CP
SLUDGE
AERATORS
7.5HP
60A 3P
CP
SLUDGE PUMPS
(HOLDING TANK)
2HP
30A 3P
300A/3P
150A/3P
SEE PANELBOARD
SCHEDULE FOR ALL
LOADS - INCLUDING
120VAC LOADS
PANEL B
150A 2P
208/120V, SINGLE
PHASE, 150A MCB
DISCONNECT AND REMOVE THE OLD WWTP
FEEDER BACK TO THIS OUTPUT BREAKER
AFTER NEW WWTP IS OPERATIONAL
DISCONNECT AND REMOVE FEEDERS TO OLD
WWTP FOR THE BATTERY CHARGER AND
HEATERS AFTER NEW WWTP IS OPERATIONAL.
RECONNECT THESE CIRCUITS TO THE NEW
LOCAL MDP.
DISCONNECT AND
REMOVE WIRING TO
OLD WWTP ATS AFTER
NEW WWTP IS
OPERATIONAL.
RECONNECT TO THE
NEW LOCAL ATS.
NEW PRIMARY POLE(S)
BY UTILITY - NUMBER
AND STAKING LOCATION
AS DETERMINED BY
UTILITY.
PROVIDE NEW NEMA 4X,
NON-FUSED DISCONNECT AS
INDICATED (TYPICAL)
EXISTING GENERATOR HAS
BEEN REWIRED TO 240/120V
3PH (DELTA) TO SERVE THE
EXISTING WWTP. THE
ELECTRICAL CONTRACTOR
SHALL RECONNECT THE
ALTERNATOR FOR 208/120 -
3PH OPERATION FOR THE
NEW WWTP
P R
IN
TE
D : 6
/1 9/
:0 4P
M
FI
LE
N
A M
E : G
:\5
3- D
E C
A D
O C
M E
ID
IQ
\0 5-
P ha se A
R ep or t B
C
FC
W W
TP
R ep la ce m en t\W or ki ng D ra w in gs
\A ut oC A
D \5
3-
-E
-0 0-
1.
dw g
P
LO
TT
E
D B
Y : s de at on
GRW ENGINEERS, INC.
801 CORPORATE DRIVE
LEXINGTON, KY.
(859) 223-3999 / FAX (859) 223-8917
engineering architecture geospatial www.grwinc.com
E-00-601
WWTP RISER DIAGRAM & DETAILS
SDD
WLM
AutoCAD SHX Text
RTA DATE
AutoCAD SHX Text
DECA LOG #
AutoCAD SHX Text
A&E FILE NO.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DRAWING DATE
AutoCAD SHX Text
DRAWING INFORMATION
AutoCAD SHX Text 5113-05
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION OF REVISIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISION HISTORY OF THIS DRAWING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION OF REVISIONS
AutoCAD SHX Text
FRANKFORT, KENTUCKY
AutoCAD SHX Text
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
AutoCAD SHX Text
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
AutoCAD SHX Text
FINANCE AND ADMINISTRATION CABINET
AutoCAD SHX Text
COMMONWEALTH OF KENTUCKY
AutoCAD SHX Text
PON:
AutoCAD SHX Text
RTA
AutoCAD SHX Text
BELL COUNTY FORESTRY CAMP
AutoCAD SHX Text
PINEVILLE, KENTUCKY
AutoCAD SHX Text
WWTP REPLACEMENT
AutoCAD SHX Text 5-22-2026
AutoCAD SHX Text 5/22/2026
AutoCAD SHX Text 5/22/2026
2-785-2300001529
P R
IN
TE
D : 6
/1 9/
:0 3P
M
FI
LE
N
A M
E : G
:\5
3- D
E C
A D
O C
M E
ID
IQ
\0 5-
P ha se A
R ep or t B
C
FC
W W
TP
R ep la ce m en t\W or ki ng D ra w in gs
\A ut oC A
D \5
3-
-E
-0 0-
3.
dw g
P
LO
TT
E
D B
Y : s de at on
GRW ENGINEERS, INC.
801 CORPORATE DRIVE
LEXINGTON, KY.
(859) 223-3999 / FAX (859) 223-8917
engineering architecture geospatial www.grwinc.com
E-00-603
ELECTRICAL SCHEDULES
SDD
WLM
LUMINAIRE SCHEDULE
TYPE DESCRIPTION COLOR TEMP LAMP TYPE LUMENS WATTS VOLTAGE MOUNTING TYPE MOUNTING HEIGHT MANUFACTURER MODEL NUMBER
LF1 4' MULTIPURPOSE STRIP 4000K LED 8900 56 120 SURFACE 12' COLUMBIA LIGHTING MPS4-40-XL-C-W-U
LF1E 4' MULTIPURPOSE STRIP W/ EM BACKUP 4000K LED 8900 56 120 SURFACE 12' COLUMBIA LIGHTING MPS4-40-XL-C-W-U-ED-ELL14
LF2 2' MULTIPURPOSE STRIP 4000K LED 5500 35 120 SURFACE 9' COLUMBIA LIGHTING MPS2-40-XL-C-W-U
LF3 3" ROUND DOWNLIGHT 4000 K LED 600 7.8 120 SURFACE/CEILING 8' PRESCOLITE LTR-3RD-40KH-SL06L-EMR-SH-8-WT-PML
EX1 EMERGENCY EXIT 4000K LED N/A 12 120 SURFACE/CEILING 8' ELITE LIGHTING ELX-LED-651-R-EM-SDT
EM1 EMERGENCY REMOTE LED 4000K LED N/A 12 120 SURFACE 8' KENALL LIGHTING METER-MW-2-6.5L-12VAC/DC
SL1 POLE MOUNTED LED SITE LIGHTING 4000K LED 10200 155 120 POLE 20' LEOTEK GCJ3-30J-MV-40K-5-GY-095
POLE ALUMINUM HINGED POLE (ROUND) N/A N/A N/A N/A N/A N/A N/A VALMONT R-200050505SH
PANEL SCHEDULE PANEL B VOLTAGE 208Y/120V, 3-PHASE, 4-WIRE
LOCATION LAB MECH ROOM 103 MAINS AMPACITY 125A
ENCLOSURE NEMA 12 MAIN CB SIZE 125A
SURFACE, FLUSH, OR MCC SURFACE TOTAL SPACES 30
AIC RATING 10,000 NEUTRAL BUS YES
ADDITIONAL BUS FOR ISOLATED GND? NO
DESCRIPTION VA #P BKR FEEDER NO -A- VA -B- VA -C- VA NO. FEEDER BKR #P VA DESCRIPTION
RECEPS 101 ABOVE COUNTER 540 1 20A 3#12 IN 3/4"C 1 1080 2 3#12 IN 3/4"C 20A 1 540 RECEPS 101 ABOVE COUNTER
RECEPS 101 720 1 20A 3#12 IN 3/4"C 3 1620 4 3#12 IN 3/4"C 20A 1 900 RECEPS 102
RECEPS 103, 104, EXTERIOR 720 1 20A 3#12 IN 3/4"C 5 2720 6 3#10 & 1#10G IN 1"C 30A 3 2000 WATER HEATER
AHU-1 3952 2 40A 2#6, 1#10 IN 3/4"C 7 5952 8 - - - 2000 -
- 3952 - - - 9 5952 10 - - - 2000 -
BUCK BOOST - GRINDER PUMP 960 2 20A 3#12 IN 3/4"C 11 1200 12 3#12 IN 3/4"C 15A 1 240 EF-2
- 960 - - 13 960 14 20A 1 SPARE
EF-1 240 1 15A 3#12 IN 3/4"C 15 240 16 20A 1 SPARE
EH-1 750 1 20A 3#12 IN 3/4"C 17 1500 18 3#12 IN 3/4"C 20A 1 750 EH-2
SPARE 1 20A 19 0 20 20A 1 SPARE
SPARE 1 20A 21 1250 22 3#12 IN 3/4"C 20A 2 1250 CU-1
LIGHTS 566 1 20A 3#12 IN 3/4"C 23 1816 24 - - - 1250 -
SPARE 1 15A 25 0 26 20A 1 SPARE
SPARE 1 15A 27 0 28 20A 1 SPARE
SPARE 1 15A 29 0 30 20A 1 SPARE
TOTAL VOLT-AMPERES PER PHASE 7992 9062 7236
TOTAL AMPERES PER PHASE 66.6 75.5 60.3
PANEL SCHEDULE PANEL A VOLTAGE 240V, 1-PHASE, 3-WIRE
LOCATION PREFAB BUILDING MAINS AMPACITY 60A
ENCLOSURE NEMA 1 MAIN CB SIZE 60A
SURFACE, FLUSH, OR MCC SURFACE TOTAL SPACES 12
AIC RATING 10,000 NEUTRAL BUS YES
ADDITIONAL BUS FOR ISOLATED GND? NO
DESCRIPTION VA #P BKR FEEDER NO -A- VA -B- VA NO. FEEDER BKR #P VA DESCRIPTION
PRE-WIRED LOAD #1 500 1P 20A (3)#12 IN 3/4"C 1 2000 2 (3)#12 IN 3/4"C 20A 1P 1500 PRE-WIRED LOAD #2
PRE-WIRED LOAD #3 500 1P 20A (3)#12 IN 3/4"C 3 1800 4 (4)#12 IN 3/4"C 20A 2P 1300 FILTER #1
FILTER #2 1300 2P 20A (4)#12 IN 3/4"C 5 2600 6 - - 1300 -
- 1300 - - - 7 1300 8 20A 1P SPARE
SPARE 1P 20A 9 0 10 20A 2P SPARE
SPARE 1P 20A 11 0 12 - - -
TOTAL VOLT-AMPERES PER PHASE 4600 3100
TOTAL AMPERES PER PHASE 38.3 25.8
NOTE: FURNISHED WITH BUILDING
PANEL SCHEDULE MDP VOLTAGE 208Y/120V, 3-PHASE, 4-WIRE
LOCATION EXTERIOR (SEE SITE PLAN) MAINS AMPACITY 400A
ENCLOSURE NEMA 4X MAIN CB SIZE 400A
SURFACE, FLUSH, OR MCC FREE STANDING - SURFACE TOTAL SPACES 54
AIC RATING 22,000 NEUTRAL BUS YES
ADDITIONAL BUS FOR ISOLATED GND? NO
DESCRIPTION VA #P BKR FEEDER NO -A- VA -B- VA -C- VA NO. FEEDER BKR #P VA DESCRIPTION
SBR CONTROL PANEL 4750 3P 125A SEE ONE-LINE 1 9965 2 SEE ONE-LINE 150A 3P 5215 EFFLUENT PUMP CONTROL PANEL
- 4750 - - - 3 9965 4 - - - 5215 -
- 4750 - - - 5 9965 6 - - - 5215 -
POST EQ PUMP CONTROL PANEL 2200 3P 50A SEE ONE-LINE 7 3300 8 SEE ONE-LINE 20A 3P 1100 SLUDGE PUMP CONTROL PANEL
- 2200 - - - 9 3300 10 - - - 1100 -
- 2200 - - - 11 3300 12 - - - 1100 -
SLUDGE AERATOR CONTROL PANEL 2200 3P 50A SEE ONE-LINE 13 3700 14 (3)#12 IN 3/4"C 20A 1P 1500 GENERATOR HEATER
- 2200 - - - 15 2440 16 (3)#12 IN 3/4"C 20A 1P 240 GENERATOR CHARGER
- 2200 - - - 17 6800 18 SEE ONE-LINE 100A 2P 4600 T. FILTER BUILDING TRANSFORMER
UV SYSTEM RECEPS 1 720 1P 20A (3)#12 IN 3/4"C 19 3820 20 - - - 3100 -
UV SYSTEM RECEPS 2 720 1P 20A (3)#12 IN 3/4"C 21 1440 22 (3)#12 IN 3/4"C 20A 1P 720 RE-AERATION CONTROL PANEL
SAMPLER RECEPTACLE 720 1P 20A (3)#12 IN 3/4"C 23 1120 24 (3)#12 IN 3/4"C 20A 1P 400 REFIGERATED SAMPLER RECEP.
FLOW METER 200 1P 20A (3)#12 IN 3/4"C 25 8192 26 (3)#1/0 & (1)#6G IN 2"C 150A 3P 7992 PANEL B (LAB BUILDING) FEEDER
VIDEO/CHART RECORDER 200 1P 20A (3)#12 IN 3/4"C 27 9262 28 - - - 9062 -
EFFLUENT ACTUATOR VALVE #1 525 3P 20A (3)#10 IN 3/4"C 29 7761 30 - - - 7236 -
- 525 - - - 31 1050 32 (3)#12 IN 3/4"C 20A 3P 525 AIR VALVE ACTUALTOR #1
- 525 - - - 33 1050 34 - - - 525 -
EFFLUENT ACTUATOR VALVE #2 525 3P 20A (3)#10 IN 3/4"C 35 1050 36 - - - 525 -
- 525 - - - 37 1050 38 (3)#12 IN 3/4"C 20A 3P 525 AIR VALVE ACTUALTOR #2
- 525 - - - 39 1050 40 - - - 525 -
SPACE 41 525 42 - - - 525 -
SPACE 43 0 44 SPACE
SPACE 45 0 46 SPACE
SPACE 47 0 48 SPACE
SPACE 49 0 50 SPACE
SPARE 1P 20A - 51 52 - 20A 1P SPARE
SPARE 1P 20A - 53 0 54 - 20A 1P SPARE
TOTAL VOLT-AMPERES PER PHASE 31077 28507 30521
TOTAL AMPERES PER PHASE 259 237.6 254.3
AutoCAD SHX Text
RTA DATE
AutoCAD SHX Text
DECA LOG #
AutoCAD SHX Text
A&E FILE NO.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DRAWING DATE
AutoCAD SHX Text
DRAWING INFORMATION
AutoCAD SHX Text 5113-05
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION OF REVISIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISION HISTORY OF THIS DRAWING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION OF REVISIONS
AutoCAD SHX Text
FRANKFORT, KENTUCKY
AutoCAD SHX Text
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
AutoCAD SHX Text
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
AutoCAD SHX Text
FINANCE AND ADMINISTRATION CABINET
AutoCAD SHX Text
COMMONWEALTH OF KENTUCKY
AutoCAD SHX Text
PON:
AutoCAD SHX Text
RTA
AutoCAD SHX Text
BELL COUNTY FORESTRY CAMP
AutoCAD SHX Text
PINEVILLE, KENTUCKY
AutoCAD SHX Text
WWTP REPLACEMENT
AutoCAD SHX Text 5-22-2026
AutoCAD SHX Text 5/22/2026
AutoCAD SHX Text 5/22/2026
SHEET KEYNOTES:
1. NEW SBR MAIN CONTROL PANEL, FURNISHED UNDER
DIVISION 46 AND INSTALLED BY THE ELECTRICAL
CONTRACTOR. SEE THE SBR INTERCONNECTION
DIAGRAM ON THIS SHEET FOR MORE INFORMATION.
2. PROVIDE ELECTRICAL EQUIPMENT RACK SIMILAR TO
DETAIL 14 ON SHEET E-00-503 (TYPICAL FOR ALL
EQUIPMENT NOT MOUNTED ON PROCESS EQUIPMENT
ENCLOSURES).
3. PROVIDE POWER AND CONTROL FEEDERS FROM THE
CONTROL PANEL TO THE SBR BLOWERS. CONTROL
FEEDERS NOT SHOWN FOR CIRCUIT CLARITY BUT
SHALL BE INSTALLED IN A SEPARATE CONDUIT.
4. INCOMING POWER FEEDER FROM THE MDP TO THE
SBR CONTROL PANEL. SEE SITE PLAN FOR
CONTINUATION. SEE ONE-LINE DIAGRAM FOR FEEDER
INFORMATION.
5. PROVIDE A CABLE/LEVEL HOLDER SIMILAR TO DETAIL
19 ON E-00-504, TO SECURE PROCESS EQUIPMENT
CABLING AS REQUIRED (TYPICAL FOR ALL PROCESS
EQUIPMENT CABLING LOCATED WITHIN SBR
STRUCTURE).
6. NEW SUBMERSIBLE WASTE SLUDGE PUMP (TYPICAL
OF TWO) FURNISHED AND INSTALLED UNDER DIVISION
46. PROVIDE ALL POWER/CONTROL CABLING AS
REQUIRED.
7. PROVIDE WASTE SLUDGE PUMP POWER AND CONTROL
FEEDERS VIA THE SBR CONTROL PANEL (TYPICAL OF
2). CONTROL FEEDER NOT SHOWN FOR CIRCUIT
CLARITY BUT SHALL BE INSTALLED IN A SEPARATE
CONDUIT.
8. PROVIDE A NEW NEMA-4X, MOTOR RATED,
RACK-MOUNTED DISCONNECT. SEE ONE-LINE DIAGRAM
OR INTERCONNECTION DIAGRAM FOR MORE
INFORMATION.
9. FURNISH AND INSTALL NEMA 4X JUNCTION BOX FOR
CONVERSION OF PUMP/MOTOR POWER AND CONTROL
CABLES (OR FLOAT CABLES) TO SINGLE CONDUCTORS.
REFER TO DETAIL 5, SHEET E-00-502 FOR ADDITIONAL
INFORMATION. CONTRACTOR SHALL FURNISH AND
INSTALL SEALING CONNECTORS FOR EACH
PUMP/MOTOR POWER, CONTROL, AND FLOAT CABLES
AS APPLICABLE.
10. PROVIDE NEW SUBMERSIBLE FLOAT CABLES.
CONTRACTOR SHALL FURNISH AND INSTALL
STAINLESS STEEL STRAIN RELIEF CABLE GRIP AT
LEVEL SENSOR HOLDER.
11. NEW SUBMERSIBLE FLOAT. COORDINATE CONTROL
ELEVATIONS WITH THE MECHANICAL/SANITARY
CONTRACTOR. SEE SHEET M-06-101 FOR FLOAT
ELEVATIONS.
12. POST-EQ CONTROL PANEL, FURNISHED UNDER
DIVISION 46 AND INSTALLED BY THE ELECTRICAL
CONTRACTOR. POST-EQ CONTROL PANEL SHALL
ACCEPT POST-EQ FIELD INSTRUMENTATION AND PUMP
STATUS/CONTROL I/O AS REQUIRED FOR POST-EQ
PUMP OPERATION. FINAL I/O REQUIREMENTS SHALL BE
COORDINATED WITH THE APPROVED SBR SYSTEM
MANUFACTURER SHOP DRAWINGS.
13. INCOMING POWER FEEDER TO POST EQ CONTROL
PANEL FROM THE MDP. SEE SITE PLAN FOR
CONTINUATION. SEE ONE-LINE DIAGRAM FOR FEEDER
INFORMATION.
14. PROVIDE COMMUNICATION/INTERLOCK WIRING
BETWEEN THE SBR CONTROL PANEL AND POST-EQ
CONTROL PANEL AS REQUIRED FOR COORDINATED
SBR DECANT AND POST-EQ PUMP OPERATION. FINAL
COMMUNICATION METHOD, CONDUCTOR QUANTITY,
TERMINATIONS, AND CONTROL REQUIREMENTS SHALL
BE COORDINATED WITH THE APPROVED SBR SYSTEM
MANUFACTURER SHOP DRAWINGS.
15. SUBMERSIBLE PUMP POWER AND CONTROL CABLES
(TYPICAL OF TWO PUMPS). CONTRACTOR SHALL
FURNISH AND INSTALL STAINLESS STEEL STRAIN
RELIEF CABLE GRIP AT EACH END OF PUMP CABLE.
16. NEW SUBMERSIBLE POST EQ PUMP FURNISHED AND
INSTALLED UNDER DIVISION 33 (TYPICAL OF TWO).
17. NEW SLUDGE PUMP CONTROL PANEL, FABRICATED
AND INSTALLED UNDER DIVISION 26. SEE CONTROL
CIRCUIT 3 ON SHEET E-00-704 FOR MORE
INFORMATION.
18. INCOMING POWER TO THE SLUDGE PUMP CONTROL
PANEL. SEE ONE-LINE DIAGRAM FOR FEEDER
INFORMATION.
19. NEW SUBMERSIBLE WASTE SLUDGE PUMP (TYPICAL
OF TWO), FURNISHED AND INSTALLED BY DIVISION 33.
20. NEW SLUDGE AERATOR CONTROL PANEL, FABRICATED
AND INSTALLED UNDER DIVISION 26. SEE CONTROL
CIRCUIT 5 ON SHEET E-00-704 FOR MORE
INFORMATION.
21. NEW AERATED SLUDGE HOLDING TANK
AERATOR/MIXER FURNISHED AND INSTALLED UNDER
DIVISION 46 (TYPICAL OF TWO).
22. PROVIDE ALL POWER AND CONTROL CABLING AS
REQUIRED TO SLUDGE TANK APSIRATOR (TYPICAL OF
TWO) - SEE ONE-LINE DIAGRAM FOR MORE
INFORMATION.
23. INCOMING POWER FROM THE SBR CONTROL PANEL TO
THE SLUDGE TANK ASPIRATORS. SEE ONE-LINE
DIAGRAM FOR FEEDER INFORMATION.
24. FURNISH AND INSTALL SHIELDED TWISTED-PAIR CABLE
IN 3/4"C FROM TRANSMITTER TO ASSOCIATED
CONTROL PANEL. LOOP POWER (24 VDC) SHALL BE
PROVIDED AS REQUIRED FOR OPERATION.
25. SUBMERSIBLE HYDROSTATIC LEVEL TRANSMITTER
(WIKA MODEL LS-10 OR APPROVED EQUAL) SHALL BE
FURNISHED AND INSTALLED UNDER DIVISION 40.
CONTRACTOR SHALL INSTALL THE TRANSMITTER IN
STILING WELL NEAR INDICATED LOCATION.
CONTRACTOR SHALL TERMINATE FACTORY-INSTALLED
VENTED CABLE IN A NEMA 4X VENTED JUNCTION BOX
MOUNTED. PROVIDE BREATHABLE VENT ELEMENT AND
ENSURE VENT TUBE IS NOT SEALED OR POTTED.
TYPICAL OF TWO.
26. PROVIDE 120 VAC POWER CIRCUIT TO D.O. PROBE
ANALYZER IN 1"C VIA THE SBR CONTROL PANEL.
TYPICAL OF TWO.
27. DISSOLVED OXYGEN ANALYZER (HACH MODEL SC200
OR APPROVED EQUAL) SHALL BE FURNISHED AND
INSTALLED UNDER DIVISION 40. CONTRACTOR SHALL
HAND-RAIL INSTALL AND MOUNT ANALYZER IN NEMA
4X ENCLOSURE. TYPICAL OF TWO.
28. DISSOLVED OXYGEN PROBE (HACH LDO MODEL 2 OR
APPROVED EQUAL) SHALL BE FURNISHED UNDER
DIVISION 40. CONTRACTOR SHALL INSTALL PROBE AND
MOUNTING HARDWARE IN BASIN, THEN ROUTE PROBE
CABLE IN CONDUIT TO SC200 ANALYZER. MAKE ALL
REQUIRED CONNECTIONS PER MANUFACTURER’S
RECOMMENDATIONS. ENSURE CABLE ROUTING
ALLOWS FOR FUTURE REMOVAL AND MAINTENANCE
OF PROBE.
29. PROVIDE 4-20mA STP BACK TO SBR CONTROL PANEL
PLC IN 3/4"C. PROVIDE SEPARATE J-BOXES AND
CONDUIT ( FOR LOW VOLTAGE CABLING) BACK TO THE
SBR CONTROL PANEL.
30. PROVIDE 208/3PHVAC TO EFFLUENT VALVE ACTUATOR
VIA THE MDP. TYPICAL OF TWO. CONTRACTOR SHALL
VERIFY FINAL ELECTRICAL REQUIREMENTS WITH
APPROVED SUBMITTALS PRIOR TO ROUGH-IN.
31. FURNISH AND INSTALL ONE (1) 10-CONDUCTOR, #16
AWG, OVERALL-SHIELDED CONTROL CABLE, EQUAL TO
BELDEN 8772 OR APPROVED EQUAL, FROM EACH
EFFLUENT VALVE ACTUATOR CONTROLLER TERMINAL
TO THE SBR CONTROL PANEL/PLC. SHIELD SHALL BE
BONDED AT THE CONTROL PANEL END ONLY. TYPICAL
OF TWO.
32. PROVIDE 208/3PHVAC TO AIR VALVE ACTUATOR VIA
THE MDP. TYPICAL OF TWO. CONTRACTOR SHALL
VERIFY FINAL ELECTRICAL REQUIREMENTS WITH
APPROVED SUBMITTALS PRIOR TO ROUGH-IN.
33. FURNISH AND INSTALL ONE (1) 10-CONDUCTOR, #16
AWG, OVERALL-SHIELDED CONTROL CABLE, EQUAL TO
BELDEN 8772 OR APPROVED EQUAL, FROM EACH AIR
VALVE ACTUATOR CONTROLLER TERMINAL TO THE
SBR CONTROL PANEL/PLC. SHIELD SHALL BE BONDED
AT THE CONTROL PANEL END ONLY. TYPICAL OF TWO.
POST-EQ BASIN
SBR BASIN #1
SBR BASIN #2
SBR BLOWERS
AERATED SLUDGE HOLDING TANK
GENERAL NOTES:
J J
J
J
20 17
23 18
24 26 24
A. THE SBR PROCESS BASINS ARE CLASSIFIED AS
CLASS I, DIVISION 1, GROUP D AREA PER NFPA 820.
THE AREA WHICH EXTENDS TO 18" ABOVE THE TOP
SLAB AND EXTENDS 3' BEYOND ALL SIDES IS A
CLASS I, DIVISION 2 HAZARDOUS LOCATION. ANY
EQUIPMENT LOCATED WITHIN THE CLASSIFIED AREA
SHALL BE UL LISTED FOR THAT AREA. ALL WIRING
METHODS SHALL CONFORM TO THE REQUIREMENTS
OF NEC ARTICLE 500 AND 501.
B. ELECTRICAL EQUIPMENT/DEVICES SPECIFICALLY
REFERENCED AS BEING FACTORY INSTALLED ARE
FURNISHED AS A PART OF THE PRE-FABRICATED
FIBERGLASS BUILDING. ALL CONDUIT/WIRE FOR THE
FACTORY INSTALLED EQUIPMENT IS PART OF THE
BUILDING.
C. ANY ELECTRICAL EQUIPMENT /DEVICES NOT
REFERENCED AS BEING FACTORY INSTALLED SHALL
BE PROVIDED BY THE ELECTRICAL CONTRACTOR.
D. ENSURE ALL EQUIPMENT IS LABELED TO INDICATE
ITS SOURCE. E.G. IF EQUIPMENT IS FED FROM THE
MDP, INCLUDE "FED FROM MDP" FOLLOWED BY THE
CIRCUIT NUMBER.
M
LIT
AIT
LIT
POST-SBR
DECANT
VALVE VAULT
POST-EQ BASIN
VALVE VAULT
WASTE SLUDGE
VALVE VAULT
AIT
M
M
M
M
M
M
M
M
M
J
J
LHS
LHS
INCOMING POWER FEEDER VIA MDP
BLOWER #1
BLOWER #2
SLUDGE PUMP #1
SLUDGE PUMP #2
BASIN #1 LIT
BASIN #1 ETWL FLOAT
BASIN #1 DO ANALYZER
BASIN #2 LIT
BASIN #2 ETWL FLOAT
BASIN #2 DO ANALYZER
AIR VALVE #1
AIR VALVE #2
EFFLUENT VALVE #1
EFFLUENT VALVE #2
POWER/CONTROL
SIGNALS
NOTE: VALVES POWERED VIA MDP
SBR CONTROL PANEL
OUTGOING
OUTGOING
INTERLOCK WITH POST EQ PANEL
J J
NOTE: SEE SHEET NOTES FOR CONDUIT
NOT TO SCALE1 SBR INTERCONNECTION DIAGRAM
NOTE: COORDINATE FINAL FEEDER SIZE
WITH APPROVED SHOP DRAWINGS.
LHS
J
LIT
P R
IN
TE
D : 6
/1 9/
:5 2P
M
FI
LE
N
A M
E : G
:\5
3- D
E C
A D
O C
M E
ID
IQ
\0 5-
P ha se A
R ep or t B
C
FC
W W
TP
R ep la ce m en t\W or ki ng D ra w in gs
\A ut oC A
D \5
3-
-E
-0 3-
1.
dw g
P
LO
TT
E
D B
Y : s de at on
GRW ENGINEERS, INC.
801 CORPORATE DRIVE
LEXINGTON, KY.
(859) 223-3999 / FAX (859) 223-8917
engineering architecture geospatial www.grwinc.com
SCALE: 1/4"=1'-0" 0 4' 8'2'
SEQUENCING BATCH REACTOR - NEW ELECTRICAL
E-03-101
ELECTRICAL SEQUENCING BATCH REACTOR
SDD
WLM
AutoCAD SHX Text
RTA DATE
AutoCAD SHX Text
DECA LOG #
AutoCAD SHX Text
A&E FILE NO.
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DRAWING DATE
AutoCAD SHX Text
DRAWING INFORMATION
AutoCAD SHX Text 5113-05
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION OF REVISIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISION HISTORY OF THIS DRAWING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION OF REVISIONS
AutoCAD SHX Text
FRANKFORT, KENTUCKY
AutoCAD SHX Text
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
AutoCAD SHX Text
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
AutoCAD SHX Text
FINANCE AND ADMINISTRATION CABINET
AutoCAD SHX Text
COMMONWEALTH OF KENTUCKY
AutoCAD SHX Text
PON:
AutoCAD SHX Text
RTA
AutoCAD SHX Text
BELL COUNTY FORESTRY CAMP
AutoCAD SHX Text
PINEVILLE, KENTUCKY
AutoCAD SHX Text
WWTP REPLACEMENT
AutoCAD SHX Text 5-22-2026
AutoCAD SHX Text 5/22/2026
AutoCAD SHX Text 5/22/2026
| Addendum two.pdf |
| 5113-05-E-00-601-E-00-601.pdf |
| Sheets and Views |
| E-00-601 |
| 5113-05-E-00-603-E-00-603.pdf |
| Sheets and Views |
| E-00-603 |
| 5113-05-E-03-101-E-03-101.pdf |
| Sheets and Views |
| E-03-101 |
| 5113-05-M-03-102-M-03-102.pdf |
| Sheets and Views |
| M-03-102 |
File details come from the government source that posted it. Updated .