Addendum #2.pdf
PDF 183 KB Posted
- Solicitation number
- BPM038361
- Issued by
- Anne Arundel County, Annapolis City, Maryland
About this file
This document is an Addendum issued by the State of Maryland Department of General Services regarding a state and local contract opportunity for the Gold Star Family Memorial Infrastructure Improvement project in Annapolis, Maryland. The Addendum addresses a request for adjustment to the temporary facility requirements, specifically the 500 square foot temporary office requirement, which will not be needed as the construction inspections office is in close proximity. The project number is B-450-210-001, and it involves infrastructure improvements in the jurisdictions of Anne Arundel County and the City of Annapolis.
The document also includes a Project RFI from Rainbow Construction Corporation, the contractor, requesting an adjustment to the temporary facility requirements due to the size of the project. The Procurement Officer, Kevin Lambros, has provided a response indicating that the 500 square foot temporary office requirement will be eliminated, as the construction inspections office is in close proximity and would not be used by the Department of General Services.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1
Date: July 13, 2023
STATE OF MARYLAND
DEPARTMENT OF GENERAL SERVICES
Atif Chaudhry, Secretary
Project No. B-450-210-001
This Addendum is issued to clarify, add to, delete from, correct and/or change the bid documents to the extent indicated and is hereby made a part of the said bid documents on which the construction contract will be based. Acknowledge receipt of the Addendum by inserting its number and date on the Invitation to Bid Form. Failure to acknowledge receipt of this
Addendum may subject the offer to disqualification. All questions should be addressed to the
Procurement Officer.
This Addendum includes:
Question: With the size of this project, would it be reasonable to make an adjustment to the requirements for temporary facilities? (Particularly the 500 sqft temp office requirement)
Answer: Yes. Those facilities would not be needed. The construction inspections office is in close proximity and would not be used by DGS.
End of Addendum No. 1
Issued by:
State of Maryland
Office of State Procurement
301 W. Preston Street, Room 1204
Baltimore, MD 21201
Kevin Lambros Kevin Lambros
Procurement Officer
Job Name: Gold Star Family Memorial Job No.: B-450-210-001
From: To:
Subject: Date:
Ref Specs: Drawings:
Need Response by:
URGENT IMPORTANT NORMAL
Cost Involved: No Yes To be Determined Approx:
Time Involved: No Yes To be Determined Approx:
By: Date:
Date: By:
File: Distribution:
7/13/2023
Project RFI
Joe Saylor
Kevin Lambros n/a
Rainbow Construction Corporation
Temporary Facility Requirements
15000
Kevin Lambros
Proposed Solution(s):
Answer:
Rainbow Construction Corporation 3045 Old Washington Road Waldorf, Maryland 20601
(301) 843-1018 fax (301) 645-8102
Question(s):
7/13/2023
With the size of this project, would it be reasonable to make an adjustment to the requirements for temporary facilites?
Particularly the 500 sqft temp office requirement.
RFI#
| Addendum #2 |