Addendum 2.pdf
PDF 73 KB Posted
- Solicitation number
- 23-9360 DIST
- Issued by
- Moffat County, Colorado
About this file
Addendum #2 for the Avondale Water and Sanitation District's 2024 Main, Valve, and Fire Hydrant Replacement project was issued on July 15, 2024, providing critical updates to the bidding process. The addendum introduces two key modifications: first, concrete cross pans (gutters) are now to be included in curb & gutter pay items, and second, contractors are required to estimate pothole hour quantity and supply this estimated quantity in the bid tab. Bidders are instructed to provide acknowledgement of this addendum with their bid submission.
The addendum does not specify pricing details or funding sources, but it appears to be part of a broader infrastructure improvement project aimed at replacing aging water system components. The modifications suggest a need for precise bidder calculations and comprehensive project scoping, indicating the district's focus on detailed and accurate project planning. Contractors participating in this bid must carefully review the revised specifications and ensure they can meet the updated requirements for pothole hour estimation and concrete work inclusions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid Attendees.pdf | ||
| 2024 Main and Valve Replacement.pdf | ||
| Bid Sheet R2.xlsx | XLSX spreadsheet | |
| Performance-Bond Valve.pdf | ||
| 1971 As Builts.pdf | ||
| 2024 Bid Drawings.pdf | ||
| Addendum 1.pdf | ||
| Bid Sheet.xlsx | XLSX spreadsheet | |
| Payment Bond Valve.pdf | ||
| C-522-Contract-for-Construction-of-a-Small-Project - Copy.pdf | ||
| C435-Bid-Bond-Damages-Form-2018 - Copy.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #2
Avondale Water and Sanitation District – 2024 Main, Valve, and Fire Hydrant Replacement
July 15, 2024
1. Bid Tab Revised 7-15-24 R2. Concrete cross pans (gutters) to be included in curb & gutter pay items.
2. Contractor to estimate pothole hour quantity and supply the estimated quantity in the bid tab for the bid.
Provide Acknowledgement of this addendum with the Bid.