Addendum #2 6-11-2024.pdf
PDF 3 MB Posted
- Attached to
- Palestine Fish Hatchery Improvements
- Solicitation number
- CRFQ 0310 DNR2400000020 3
- Issued by
- Webster County, West Virginia
About this file
This is Addendum #2 to a Centralized Request for Quote (CRFQ) issued by the West Virginia Department of Administration Purchasing Division on behalf of the West Virginia Division of Natural Resources for the Palestine State Fish Hatchery Pond Rehabilitation and Modification project located at 27 Paddlefish Lane, Elizabeth, West Virginia in Wirt County. The project encompasses the rehabilitation of twenty existing ponds through bentonite pond sealant application, installation of new 10-inch Waterman canal gate valves, anti-seep sand collars, and 10-inch HDPE outlet piping systems. The base bid includes rehabilitation of ponds 5, 6, 10, 11, 12, 14, 15, 16, 25, and 26, while Additive Alternate No. 1 covers ponds 1, 2, 3, 4, 28, 29, and 30, and Additive Alternate No. 2 covers ponds 18, 19, 20, and 21. The original bid closing date was extended by this addendum to June 27, 2024 at 1:30 PM Eastern Time. Addendum #2 serves to publish vendor responses to technical questions, provide a pre-bid sign-in sheet, and distribute revised project manual and pricing pages addressing clarifications on excavation depths, bentonite application methods, dewatering requirements, erosion control specifications, and quantity revisions.
The pricing is structured as lump-sum bids for the base bid and each alternate, with unit costs and quantities provided for individual line items including mobilization/demobilization (not to exceed 10% of contract value), surveying (not to exceed 5%), and quality control (not to exceed 5%). Funding source is the West Virginia Division of Natural Resources. Key specifications include the Mixed Blanket Method for bentonite application to embankments at 2 pounds per cubic foot mixed homogeneously with excavated soil, and the Blanket Method for pond bottoms at 1 pound per square foot. Contractors must comply with West Virginia Department of Environmental Protection construction stormwater permit requirements, implement super silt fence erosion control measures, and perform compaction testing at a minimum of one test per pond or every 100 cubic yards of compacted fill. The vendor must acknowledge receipt of all addenda to avoid bid disqualification, and the contractor bears responsibility for all labor, materials, equipment, and compliance with federal, state, and local regulations, with the Division of Natural Resources retaining inspection and approval authority over all work and materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Printed: Jun 11, 2024 Page: 1 FORM ID: WV-PRC-CRFQ-002 2020/05
Department of Administration Purchasing Division 2019 Washington Street East Post Office Box 50130 Charleston, WV 25305-0130
State of West Virginia Centralized Request for Quote
Construction
Proc Folder: 1404548 Reason for Modification:
Doc Description: Palestine Fish Hatchery Improvements Addendum #2 issued to publish agency responses to vendor questions, pre-bid sign in, revise Project ..... See Page 2 for complete infoProc Type: Central Purchase Order
Date Issued Solicitation Closes Solicitation No Version
2024-06-11 2024-06-27 13:30 CRFQ 0310 DNR2400000020 3
BID RECEIVING LOCATION
BID CLERK
DEPARTMENT OF ADMINISTRATION
PURCHASING DIVISION
2019 WASHINGTON ST E
CHARLESTON WV 25305
US
VENDOR
Vendor Customer Code:
Vendor Name :
Address :
Street :
City :
State : Country : Zip :
Principal Contact :
Vendor Contact Phone: Extension:
FOR INFORMATION CONTACT THE BUYER
Joseph E Hager III
(304) 558-2306 joseph.e.hageriii@wv.gov
Vendor Signature X FEIN# DATE
All offers subject to all terms and conditions contained in this solicitation
Date Printed: Jun 11, 2024 Page: 2 FORM ID: WV-PRC-CRFQ-002 2020/05
Reason for Modification:
Addendum #2 issued to publish agency responses to vendor questions, pre-bid sign in, revise Project Manual and Pricing Page and extend bid close date until 6/27/2027.
ADDITIONAL INFORMATION
The West Virginia Purchasing Division is soliciting bids on behalf of the West Virginia Division of Natural Resources, Palestine State Fish Hatchery to establish a contract for the Rehabilitation and Modification of twenty (20) existing ponds per the attached specifications and terms and conditions
INVOICE TO SHIP TO
DIVISION OF NATURAL
RESOURCES
DIVISION OF NATURAL
RESOURCES
PARKS & RECREATION-PEM
SECTION
PALESTINE HATCHERY
324 4TH AVE
SOUTH CHARLESTON WV ELIZABETH WV
US US
Line Comm Ln Desc Qty Unit Issue Unit Price Total Price 1 Pond construction service
Comm Code Manufacturer Specification Model #
72141212
Extended Description:
Palestine Fish Hatchery Pond Rehabilitation and New Plumbing Construction.
SCHEDULE OF EVENTS
Line Event Event Date
Revised 6/8/2012
SOLICITATION NUMBER: [Insert RFQ, RFP No.] Addendum Number: [Insert Number]
The purpose of this addendum is to modify the solicitation identified as [insert RFQ, RFP No.] (“Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specifications of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.
Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Attachment A
RFI: Vendor Questions for CRFQ DNR 24*20 Palestine Fish Hatchery
Q.1. Can you provide details for the Demo on Bid Item 4 (what is included)?
A. Demo includes removing the existing valving and piping and any existing infrastructure that will be replaced with new in the plans.
Q.2. Dewatering is a LS item should there be a dewatering item for both Alternates 1 & 2?
A. Dewatering has been added to Alternates 1 & 2 on the updated Pricing Page with this Addendum.
Q.3. Erosion Control bid item 5, can you provide a plan sheet and details or quantities for the Base,Bid, Alt 1 & 2 and add bid items for the alternates?
A. Erosion Control will follow WV DEP Construction Stormwater Permit obtained by WVDNR and the contractor must comply with all Rules and Regulations. Super Silt Fence will need to be installed between the river and construction to prevent run-off from leaving the site into the river.
See Attachment 9, WV DEP Super Silt Fence Detail, has been added to the Project Manual and the
Pricing Page has been updated accordingly.
Q.4. QAQC should a bid item be added for each alternate 1 & 2?
A. Quality Control (QAQC) line item has been added to Alternative 1 & 2.
Q.5. Surveying can a bid item be added for alternates 1 & 2?
A. Surveying line item has been added to the updated Pricing Page for Alternatives 1 & 2.
Q.6. Can you clarify the depth of excavation in the existing ponds? It is written as a 6" depth but during the prebid it was said to be a 24" depth?
A. For the excavation of the bottom of Ponds 3 and 4, a min. of 6 inches should be excavated as shown in Attachment 5- Bentonite, The Blanket Method. This may vary as some areas of the pond bottom may need to be over excavated and go deeper than other areas.
Q.7. Can you clarify the type of Bentonite requested, is it powder, granular or is it rolls of bentonite in a GCL application ?
A. Powder or Granular can be used and it is up to the contractor. No rolls. Must be mixed homogenously with the excavated soil from the embankment as shown in the plans.
Q.8. Can you send a detail for the concrete headwall to be used at each new valve location?
A. See Attachment 2 in the Project Manual.
Q.9. Is there compaction testing required for this work? If so does the owner provide this or the contractor?
A. Yes. See page 13 (Testing) of Project Manual. One compaction test will be performed by the
Contractor at a minimum for each pond or every 100 CY of compacted fill. The Contractor is responsible for this work.
Q.10. Will there be BM and survey information given by the Owner?
A. No, Localized control can be established by the contractor/surveyor to verify cubic yardages from each pond.
Q.11. Since there are alternate bid items should there be bid items added for layout, erosion control quality control and dewatering for each alternate ?
A. Erosion Control, Quality Control, and Dewatering has been added to Alternative 1 and 2.
Q.12. Is there a project sign?
A. No.
Q.13. Is the contractor responsible for obtaining any permits?
A. No. WVDNR will be responsible for obtaining the WV DEP Stormwater Permit and will work closely with the Contractor to ensure all rules and regulations are met.
Q.14. Can the owner locate and identify the existing utilities currently buried onsite? If those are broken during the work who pays to repair them if they cannot be located prior to digging?
A. When digging in critical areas, Contractor must get prior authorization before digging in critical areas from Palestine Fish Hatchery Manager, Rodney Null. All utilities will be marked to the best of our ability. If a utility line is broken and prior authorization was given by Rodney then the
WVDNR will be responsible for payment to repair.
Q.15. What is the Engineers estimate for this project?
A. We do not disclose budgets.
Q.16. During the prebid it was discussed that the pond embankment excavation would be 30 feet in width and using the given length of each pond in the base bid and the 30' of width the area is much larger.
example Base Bid item 7 is 13,780 SF using the width discussed and lengths given the disturbance for bid item 7 is 41,340 SF for bid item 7 this in turn increases the amount of bid item 8 from 27560 lbs to 82,680 lbs for Bentonite
A. Please see the map that shows the linear portion of embankment to be excavated and Attachment 7- Embankment Detail (assumes avg. Pond height of 10 ft.) added in this Addendum. For Bentonite Application rates See Attachment 5- Bentonite Application rates. Pricing Page shows estimated cubic yards and Bentonite pounds.
Q.17. Alt 1 disturbance bid items also increase by 30% for items 19 & 20
A. Please see the map that shows the linear portion of embankment to be excavated and Attachment 7- Embankment Detail (assumes avg. Pond height of 10 ft.) added in the Addendum.
For Bentonite Application rates See Attachment 5- Bentonite Application rates. Pricing Page shows estimated cubic yards and Bentonite pounds.
Q.18. Alt 3 items increase by 70% each for bid items 31 & 32
A. Please see the map that shows the linear portion of embankment to be excavated and Attachment 7- Embankment Detail (assumes avg. Pond height of 10 ft.) added in the Addendum.
For Bentonite Application rates See Attachment 5- Bentonite Application rates. Pricing Page shows estimated cubic yards and Bentonite pounds.
Q.19 Can someone check the disturbance areas and clarify the quantities so we can all bid at an equal rate?
A. The Quantities have been verified and updated on the updated Pricing Pages with this Addendum.
Palestine State Fish Hatchery Pond Rehabilitation Project- May 28, 2024- Revision 1
West Virginia Division of Natural Resources
Pond Rehabilitation Project
Palestine State Fish Hatchery Wirt County, West Virginia
27 Paddlefish Lane Elizabeth, WV 26143
May 28, 2024
SECTION 1 - SUMMARY
1. PROJECT
A. Project Name: Palestine State Fish Hatchery Pond Rehabilitation Project
B. Location: Wirt County, 27 Paddlefish Lane, Elizabeth, WV 26143
C. Agency’s Name: West Virginia Division of Natural Resources
D. The project generally consists of the Rehabilitation of the twenty (20) existing ponds on site. Many of the ponds are leaking along the outlet pipe channel and/ or through one side of the embankment. The specific plans to repair each pond are shown per the attached sheets. Ponds leaking through the embankment will use The Mixed Blanket Method for Bentonite Pond Sealant (see Attachment 5).
Ponds No.3 and No.4 leak through the bottom and will use The Blanket Method for Bentonite Pond Sealant. Also, in addition, each pond requires installing a new 10-inch Waterman canal gate valve, anti-seep sand collars, installation/ plumbing of new 10-inch HDPE outlet piping into and from the concrete Catch Basins and then install new HDPE pipe from Catch Basin to the outlet near river.
Most of the ponds discharge into a Catch Basin designed to capture the fish when needed and then discharge into the river via piping. As per the attached sheets, some Catch Basins will require some work to plumb the new HDEP piping into the structure. There are two new 30 ft. X 30 ft. pads that must be constructed as per the attached sheets. Also, in addition there are two existing Catch Basins that have large erosion gullies around the perimeter of the Catch Basin and require fill to be placed around the structure. This project will have a base bid that includes the repair of ponds most critical to the success of the hatchery and two alternative bids for the repair of ponds less important to the operation.
2. SCOPE OF WORK
A. Base Bid- Pond 5
This pond leaks along the entire length of the south embankment. The south side of the embankment (200 ft.) must be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to join with Pond 6 piping and then to New Catch Basin Pad. The Catch Basin #56 pad will need to be constructed as per the attached details show.
B. Base Bid- Pond 6
This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (160 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show.
Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to join with Pond 5 piping and then to New Catch Basin #56 pad.
C. Base Bid- Pond 10 outlet pipe. The south side of the embankment (130 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show.
Two (2) Sand Collars will need to be installed at the appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve to the existing Catch Basin #10 and then from Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin. The Concrete at the Catch Basin will need to be cut so that the new pipe can be plumbed in.
D. Base Bid- Pond 11 outlet pipe. The south side of the embankment (112 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show.
Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve to join with Pond 12 outlet piping and then plumbed into the existing Catch Basin #12 and then from Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin. The Concrete at the Catch Basin will need to be cut so that the new pipe can be plumbed in.
E. Base Bid- Pond 12 outlet pipe. The south side of the embankment (170 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show.
Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve to join with Pond 11 outlet piping and then plumbed into the existing Catch Basin #12 and then from Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin. The Concrete at the Catch Basin will need to be cut so that the new pipe can be plumbed in.
F. Base Bid- Pond 14 outlet pipe. The south side of the embankment (116 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show.
Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve to the designated outlet location on the riverbank.
G. Base Bid- Pond 15 This pond leaks along the entire length of the south embankment and along the outlet pipe. The south side of the embankment (130 ft.) should be repaired with bentonite as per the attached details show.. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve to the designated outlet location on the riverbank.
H. Base Bid- Pond 16 outlet pipe. The south side of the embankment (120 ft.) should be repaired with bentonite as per the attached details show.. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve and will be joined with Pond 25 piping and Pond 26 outlet piping through a manifold system and then plumbed into the existing Catch Basin #25 and then from the Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin. The Concrete at the Catch Basin will need to be cut so that the new pipe can be plumbed in. Catch Basin #25 has erosion gullies around it and will need fill material placed in and around the Catch Basin. Fill material is easily accessible on site.
I. Base Bid- Pond 25 outlet pipe. The south side of the embankment (130 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve installed with a Concrete Headwall as per the attached details show. Two
(2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve and will be joined with Pond 16 piping and Pond 26 outlet piping through a manifold system and then ran into the existing Catch Basin #25 and then from the Catch Basin to the designated outlet location on the riverbank.
The HDPE Pipe can be left on the surface once it leaves the Catch Basin.
J. Base Bid- Pond 26 outlet pipe. The south side of the embankment (110 ft.) should be repaired with bentonite as per the attached details show.. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet valve and will be joined with Pond 16 piping and Pond 25 outlet piping through a manifold system and then ran into the existing Catch Basin #25 and then from the Catch Basin to the designated outlet location on the riverbank. The HDPE Pipe can be left on the surface once it leaves the Catch Basin.
K. Alternative Bid #1- Pond 1
This pond leaks along the entire length of the north embankment. The north side of the embankment (80 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. One (1) Sand Collar will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to join with Pond 2 outlet piping and then plumbed into Catch Basin #1.
L. Alternative Bid #1- Pond 2 This pond leaks along the entire length of the north embankment. The north side of the embankment (100 ft.) should be repaired as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. One (1) Sand Collar will need to be installed at appropriate intervals as per the attached details show.
Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to join with Pond 1 outlet piping and then plumbed into Catch Basin #1.
M. Alternative Bid #1- Pond 3
This pond leaks along the north embankment and the bottom of the pond. The embankment will be repaired using The Mixed Blanket Method for Bentonite Pond Sealant as shown in the attached details. To fix the leaking from the pond bottom (30,000 sq. ft.) , use The Blanket Method for Bentonite Pond Sealant as the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. One (1) Sand Collar will need to be installed at the appropriate interval as per the gate valve and plumbed into Catch Basin #3.
N. Alternative Bid #1- Pond 4
This pond leaks along the north embankment and the bottom of the pond. The embankment will be repaired using The Mixed Blanket Method for Bentonite Pond Sealant as shown in the attached details. To fix the leaking from half of the pond bottom (35,000 sq. ft.) , use The Blanket Method for Bentonite Pond Sealant as the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. One
(1) Sand Collar will need to be installed at the appropriate interval as per the gate valve to Pond #3.
O. Alternative Bid #1- Pond 28
This pond leaks along the entire length of the south embankment. The south side of the embankment (150 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collar will need to be installed at appropriate intervals as per the attached details show. Install New 10-inch SDR 32.5 HDPE pipe from new outlet gate valve to join with the existing manifold that connects with Pond 29 outlet piping and Pond 30 outlet piping. Also, there is a large erosion gully below Catch Basin #30 that needs fill placed in around the Catch Basin and re-graded.
P. Alternative Bid #1- Pond 29 This pond leaks along the south embankment and along the outlet which is also located on the southeast corner of the embankment. The south side of the embankment (150 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to join with the existing manifold that connects with Pond 28 outlet piping and Pond 30 outlet piping.
Q. Alternative Bid #1- Pond 30 This pond leaks along the south embankment and along the outlet which is also located on the southeast corner of the embankment. The south side of the embankment (160 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to join with the existing manifold that connects with Pond 28 outlet piping and Pond 29 outlet piping.
R. Alternative Bid #2- Pond 18 located on the southeast corner of the embankment. The south side of the embankment (260 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to tie into Pond 19, Pond 20 and Pond 21 outlet piping and then to New Catch Basin #19 Pad.
S. Alternative Bid #2- Pond 19 located on the southeast corner of the embankment. The south side of the embankment (230 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to tie into Pond 18, Pond 20 and Pond 21 outlet piping and then to New Catch Basin #19 Pad. The Catch Basin #19 pad will need to be constructed as per the attached details show.
T. Alternative Bid #2- Pond 20 located on the southeast corner of the embankment. The south side of the embankment (240 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to tie into Pond 18, Pond 19 and Pond 21 outlet piping and then to New Catch Basin #19
U. Alternative Bid #2- Pond 21 located on the southeast corner of the embankment. The south side of the embankment (230 ft.) should be repaired with bentonite as per the attached details show. A new 10-inch Waterman Canal Gate Valve needs installed with a Concrete Headwall as per the attached details show. Two (2) Sand Collars will need to be installed at appropriate intervals as the attached sheets show. Install New 10-inch SDR 32.5 HDPE pipe from the new outlet gate valve to tie into Pond 18, Pond 19 and Pond 20 outlet piping and then to New Catch Basin #19
3. MATERIALS
A. For Complete List of Material Quantities See exhibit A- Pricing Page.
B. Provide all necessary accessories, fittings, parts, hardware, valves, piping, concrete, and all other materials or products incidental to the installation to complete the work to function as intended. These are subject to the approval of the WV DNR.
4. INSTALLATION
A. The Vendor must furnish all labor, equipment, and materials to perform the work.
B. Installation must be in accordance with the attached plans and specifications and all Federal, State, and Municipal laws, codes, regulations, and ordinances that are pursuant to the Work.
5. INSPECTIONS
A. The authorized representatives and agents of the Division of Natural Resources must be permitted to inspect all work, materials, payroll records of personnel, invoices of materials, and other relevant data and records.
6. DELIVERY, STORAGE, AND HANDLING
A. Deliver the materials to the job site and store, in a safe area, out of the way of traffic, and shored up off the ground surface. The Vendor must furnish all labor, equipment, and materials to perform the work.
B. Use extreme care in off- loading of materials to prevent damage of materials and surrounding property. The Vendor must furnish all labor, equipment, and materials to perform the work.
7. QUALITY ASSURANCE
A. The Vendor must use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the Work.
B. The Vendor has the responsibility to protect the Agency’s property and the property of others from damage due to construction activities. Any damage due to construction activities must be the responsibility of the Vendor to repair/replace with acceptance by the WV DNR.
8. SUBSTITUTIONS
A. Any substitution requests must be submitted by the technical question deadline.
9. TECHNICAL SPECIFICATIONS
A. MOBILIZATION AND DEMOBILIZATION
1. The Contractor shall mobilize to the site and begin construction within 10 days after notice to proceed. This item shall include furnishing all labor, material, and equipment necessary to deliver and assemble at the site all equipment, tools, machinery, and supplies comprising the construction facilities. All equipment, tools, machinery, and supplies shall be removed from the site within 30 days after completion of the work. This item also includes the repair and maintenance of site access roads, existing utilities, and other site maintenance necessary for performance of the work.
B. EXCAVATION AND SITE GRADING
1. The Contractor shall furnish all labor, equipment, and materials to perform the required excavations at the site necessary to construct the project complete as shown on the Plans. This item includes excavation and cohesive fill placement necessary to construct the project complete including but not limited to; stripping, clearing and grubbing, mixing of bentonite with soil, compaction, maintenance of the access roads if needed, trenching and compaction of piping, Catch Basin pad construction, placing fill in two erosion gullies, and disposal of all waste material onsite in accordance with applicable regulations, in compliance with these specifications, and as approved by the Engineer.
Materials that cannot be placed at once in a permanent position may be temporarily stockpiled for later incorporation into the Work. Material stockpiles must be located as approved by the Engineer and will be constructed at stable slopes. Erosion control measures must be implemented to prevent soil loss from the stockpiles to the stream. All work shall be performed with reasonable neatness and excavated materials shall not be carelessly strewn over the premises.
Excavations shall be performed in conformance with minimum OSHA requirements for safety. Soils expected to be encountered in the excavations must be cohesive in nature and will pump (become unstable) if subjected to equipment traffic. The Contractor will be fully responsible for the preparation of and protection of the subgrade in a condition suitable for support of the proposed work and as approved by the Engineer. Should the subgrade become unstable, remedial measures may include removal of unsuitable material and replacement with compacted fill as approved by the Engineer.
must the subgrade become unstable due to the Contractor’s negligence, the remedial measures will be implemented at no additional cost to the Owner.
Excavations shall be performed to minimize the risk of sliding in adjacent slopes. Should a landslide develop during excavation due to the negligence of the Contractor, the Contractor will be responsible for repairing the slope to a stable condition as approved by the Engineer at no cost to the Owner.
Excess and Unsuitable Materials: Excess or unsuitable materials will be placed in an onsite waste area as approved by the Engineer. Materials encountered in the excavations which do not comply with these specifications but that are otherwise suitable for use will be modified, conditioned, or sized to meet these Specifications as approved by the Engineer.
Dewatering and Removal of Water: Some ponds will require dewatering to perform this work. When required the water shall be pumped to a nearby adjacent pond and contained in the pond. Proper and satisfactory means and devices for the exclusion and removal of all water entering excavated or low-lying areas, whether the water be surface runoff or groundwater, shall be provided at all times during construction. Water shall be removed as fast as it may collect in a manner that will not interfere with the execution of the work nor cause damage to property or the work in progress. The effectiveness of the water removal shall be satisfactory to the Engineer.
The Contractor shall be fully responsible for protection of work in progress due to damage caused by stream flow, flood flow, natural groundwater, seepage, surface runoff, or any combination of the same. Should damage occur, it will be repaired to the satisfaction of the Engineer at no additional cost to the Owner.
C. GENERAL FILL REQUIREMENTS
1. Soils excavated from the construction areas may be used as fill provided, they are free of organics, comply with these Specifications, and are moisture conditioned to achieve proper compaction.
Fill shall start on a level sub-grade as shown on the Plans. Sliver fills will not be allowed. The sub-grade and fill area shall be dewatered in accordance with these Specifications and shall be firm and approved by the Engineer prior to fill placement. The fill shall be placed and compacted in level lifts in accordance with these Specifications for the applicable fill type. Each fill lift shall be benched and keyed into adjacent slopes as the fill progresses.
The prepared ground surface upon which any fill is to be placed shall be free of all organic materials, shall be uniform and level as possible, and shall be compacted to the satisfaction of the Engineer. No fill shall be placed on frozen or soft/wet ground. Care shall be taken by the Contractor to minimize construction traffic over fill areas in order to minimize the potential for unstable "pumping" conditions to develop in the sub-grade and active fill surface prior to fill placement and compaction. Should the sub-grade or fill become unstable, the Contractor shall remove these materials and re-compact the same to provide a suitable fill surface prior to placement of additional fill as directed by the Engineer at no additional cost to the Owner.
Cohesive Fill: The Contractor shall furnish the labor, material, and equipment necessary to excavate, stockpile, load, haul, spread, and compact cohesive fill necessary to prepare and construct the project complete. Fill materials shall consist of suitable soil generated from excavations onsite. The Contractor is responsible for the placement of fill to the lines, grades, thicknesses, and dimensions as shown on the Design Drawings, or as required by the Engineer.
Material shall be placed and compacted as required for the project as shown on the Design Drawings or as required by the Engineer.
Cohesive fill material must be classified as an ML, MH, CL, or CH in accordance with the Unified Soil Classification System. Soft rock materials will not be allowed for use as cohesive fill. Organic soils and topsoil shall be stockpiled separately from cohesive soil fill. Occasional rock particles with a maximum dimension of 2 inches will be allowed provided the individual rocks are surrounded by a soil matrix and there are no rock clusters. Rock clusters are not allowed. Cohesive fill materials must be sampled and tested by the Contractor and be pre-approved by the Engineer prior to placement as fill.
Testing of Borrow Materials: All needed fill must be attainable on site. Soils obtained on site may need to be modified to meet gradation and moisture requirements. The Contractor shall sample and perform laboratory compaction testing on representative samples of all fill materials obtained from the excavations. The sampling shall be performed under the direction of the Engineer. The testing lab shall also be approved by the Engineer and test results must be submitted to the Engineer for approval a minimum of 15 days before the material is placed as fill. The fill must comply with these Specifications. Minimum testing shall include one (1) each of the following tests for minimum of each pond or 500 CY of material excavated, or when there is a noticeable change in material while work is progressing; Atterberg limits, Natural Moisture Content, and Standard Proctor Compaction (ASTM D- 698).
Fill Placement: The Contractor shall make a reasonable effort to remove roots, limbs, and rocks from the fill material in so much as is practical. No fill shall be placed in standing water, upon frozen earth, and no frozen material shall be placed in any portion of the fill. Material too wet to compact shall be dried prior to compaction and moisture shall be added to materials too dry to compact as required by these Specifications. Sufficient discing equipment and a water truck shall be continuously available at the site and shall be used to manipulate the material to obtain the proper moisture content for compaction. Suitable sheepsfoot and smooth drum vibratory rollers shall be available onsite along with suitable hand compaction or walk behind compactors for tight areas. All compactors shall be approved by the Engineer.
Clods or lumps of material shall be broken down by tractor or other equipment necessary to accomplish this result. Each lift shall extend the full width of the area being filled before starting the next lift. Each layer shall be uniform in thickness and shall be spread and compacted as specified before the next layer is started. Fill which is comprised primarily of rock or rocky soil mixtures shall not be used to bed or backfill new piping.
At the close of each workday, or when work is to be stopped for a period of time, the entire surface of the compacted fill shall be sealed by a method approved by the Engineer. If, after a prolonged rainfall, the top surface of the embankment is too wet and plastic to work properly, the top material shall be removed to expose firm, dry soil. The top material so removed shall be disposed of at the Contractor's expense. The entire surface of any section of fill under construction shall be maintained in such a condition that construction equipment can travel on any part of the section. Ruts in the surface of any layer shall be suitably filled or eliminated by grading before compaction. Care shall be taken to prevent excess travel over any section of the fill to avoid over-compacting that section. Use of rubber-tired vehicles on the fill area is prohibited unless approved by the Engineer. Areas of the fill which are over-compacted or lensed in any way due to traffic or other construction activities shall be scarified to a depth as required by the Engineer prior to placement of additional fill.
Compaction: Complete control of the compaction operation shall be exercised under the direction of the Engineer. Care shall be taken to prevent over-rolling, weaving of equipment, and slickensides in the fill or backfill material. If any portion of the fill is over-compacted, that portion shall be worked with harrow, scarifier or other suitable equipment to a sufficient depth, and the material shall be re-compacted to achieve the desired density. Prior to and during the compaction operation, the material in each layer of fill shall have the best practical moisture content required for compaction purposes;
however, the moisture content shall not be less than 2% below or greater than 7% higher than the optimum moisture content as determined by the moisture/density relationship specified herein. The moisture content shall be uniform throughout the layer. No compaction will be permitted when moisture conditions are such that the required density cannot be obtained.
Compaction requirements are as follows:
Testing: Field density and moisture content tests shall be performed by the Contractor in accordance with these Specifications as approved and directed by Engineer or his representative. Testing shall be performed in accordance with the maximum dry density and optimum moisture criteria developed for the fill material by the standard Proctor test (ASTM D 698) as specified herein.
The Contractor shall furnish a suitable compactor(s) to facilitate fill placement and compaction. Compaction equipment must be approved by the Engineer.
One compaction test will be performed by the Contractor at a minimum for each pond or every 100 CY of compacted fill to ensure 95% Compaction of the embankment side slopes.
D. EROSION AND SEDIMENT CONTROL
1. The Contractor shall provide all labor, equipment, and materials necessary to construct and maintain all sedimentation structures/devices and accumulated sediment as shown on the Design Drawings. The Contractor shall adopt, implement, and comply with the approved erosion control plans and any modifications necessary during construction as required by the regulatory agency, Owner, or the Engineer in order to prevent sedimentation of the stream. The plan shall, as a minimum, include silt fence and stabilized construction entrance(s) (SCE) at locations shown on the Design Drawings and any other measures necessary for implementing erosion control which is satisfactory under all state and federal regulations. The Contractor shall modify erosion and sediment control structures/devices as the work progresses to match changing conditions and prevent sedimentation of the stream. This may include construction of temporary ditches, added rock checks, silt traps, silt bags, wattles, or other measures. The Contractor will be responsible for implementing these measures and complying with all applicable regulations. The Contractor will be responsible for payment of any fines resulting from inadequate erosion and sediment control measures and/ or maintenance of the same. The work shall be performed in general accordance with the West Virginia Division of Environmental Protection Best Management Practice Construction Manual. The recommended erosion and sediment control measures shall be installed prior to any other work. Silt traps and silt fencing must be cleaned out periodically as necessary to ensure proper performance. The Contractor shall maintain the sediment control measures and remove the same after vegetation is established as required by these Specifications. Temporary seed will be applied to all disturbed areas which will not be touched by construction for a period of 7 days or longer.
Temporary seeding will be approved by the Engineer.
DI. SEEDING, FERTILIZING AND MULCHING
1. The Contractor shall furnish the labor, equipment, and materials necessary to place topsoil, fertilize, seed, and mulch all disturbed areas including cut and fill slopes. Seeding, fertilizing, and mulching shall be performed as directed or approved by the Engineer. All disturbed areas will be seeded as soon as possible to minimize erosion. All completed construction areas shall be seeded immediately after completion or as directed by the Engineer.
SEED MIXTURES
Temporary Seed Mixtures: All stockpiles and other disturbed areas which will require further disturbance in which the additional disturbance will be delayed for a period of three (3) weeks or longer shall be vegetated according to the following guidelines:
Variety of Seed Spring Summer Fall Winter
3/15-5/15 5/31-8/15 8/15-10/15 10/15-11/15
Lbs/acre
Annual Ryegrass
(Lolium multiflorum)
German Millet*
(Setaria italica)
Cereal Rye
(Secale Cereale)
F. BENTONITE MIXING/ADDITION TO SOILS
1. Please see Exhibit F- Bentonite Application. Bentonite must be applied to the excavated material @ a rate of 2 pounds per square foot for Ponds No. 1, 2, 5, 6, 10, 11, 12, 14, 15, 16, 18, 19, 20, 25, 26, 28, 29, 30. Bentonite is to be applied to Ponds No. 3 and No. 4 @ a rate of 1 pound per square ft. Benoite must be mixed uniformly with the soil.
C B# ne w p ad
'X
Pl um b in to e xi st in g
C B#
, c ut co nc re te a s ne ed ed
Pl um b in to e xi st in g
C B#
, c ut c on cr et e as n ee de d
Pl um b in to e xi st in g
C B#
, c ut c on cr et e as n ee de d, *E ro si on G ul ly n ee ds fi lle d in
Pl um b in to e xi st in g
C B#
Er os io n
G ul ly n ee ds fi lle d in
C B# ne w p ad
'X
Pl um b in to e xi st in g
C B#
, c ut c on cr et e as n ee de d
Pl um b in to e xi st in g
C at ch B as in s, c ut co nc re te a s ne ed ed
At ta ch m en t 1
Si te
M ap
AutoCAD SHX Text
-LEGEND-
AutoCAD SHX Text
BLANKET METHOD
AutoCAD SHX Text
PROPOSED HDPE LINE &
AutoCAD SHX Text
BENTONITE- THE BLANKET
AutoCAD SHX Text
BENTONITE- THE MIXED
AutoCAD SHX Text
POND 10
AutoCAD SHX Text
POND 1
AutoCAD SHX Text
POND 2
AutoCAD SHX Text
POND 3
AutoCAD SHX Text
POND 4
AutoCAD SHX Text
POND 5
AutoCAD SHX Text
POND 6
AutoCAD SHX Text
POND 7
AutoCAD SHX Text
POND 8
AutoCAD SHX Text
POND 9
AutoCAD SHX Text
POND 18
AutoCAD SHX Text
POND 19
AutoCAD SHX Text
POND 20
AutoCAD SHX Text
POND 12
AutoCAD SHX Text
POND 11
AutoCAD SHX Text
POND 13
AutoCAD SHX Text
POND 14
AutoCAD SHX Text
POND 15
AutoCAD SHX Text
POND 16
AutoCAD SHX Text
POND 25
AutoCAD SHX Text
POND 26
AutoCAD SHX Text
POND 27
AutoCAD SHX Text
POND 28
AutoCAD SHX Text
POND 29
AutoCAD SHX Text
POND 30
AutoCAD SHX Text
METHOD
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text 1 INCH= 200 ft. Approx.
AutoCAD SHX Text
POND 21
AutoCAD SHX Text
HEADWALL/VALVE INSIDE POND
AutoCAD SHX Text Palestine Pond Rehab ft.
m in ft.
m in ft.
ft.
ft.
m in
D in ch
#3 R eb ar
-2 in ch of fs et th en sp ac ed e ve nl y
#3 R eb ar
-2 in ch of fs et th en sp ac ed e ve nl y
R eb ar
- 2 in ch o ffs et th en s pa ce d ev en ly
R eb ar
- 2 in ch o ffs et th en s pa ce d ev en ly in ch
6-in ch es o f H ea dw al l w ill be c ut an d se t b el ow p on d bo tto m
Po nd
Bo tto m
AutoCAD SHX Text Note:The Bottom elevation of the 10 inch Waterman Gate valve should set
AutoCAD SHX Text Note:#3 Rebar should start 2 inches from pipe and then spaced evenly.
AutoCAD SHX Text Concrete Headwall Detail w Rebar
AutoCAD SHX Text Attachement 2
AutoCAD SHX Text Thickness
AutoCAD SHX Text Drawing Not to Scale
AutoCAD SHX Text at the lowest elevation of the Pond Bottom.
A035776 Line
A035776 Line
A035776 Pencil
A035776 Line
A035776 Line
Catch Basin Pad typical
30 ft.
-------30 ft.-----------1
Thickness= 0.5 ft. of Crusher Run Compacted and level 0.5 ft.
I I
Attachment 3
� I �I Pipe&Tubing / PlasticPipe&Tubing / �
Product Details
Specifications
ASTM: ASTM F-714, ASTM 0-3035, ASTM 0-3350
Color Finish Category: Blacks
Diameter - Outside: 10-3/4 in
End Connections: Plain End
Length: 50
NSF: NSF 14, NSF 61
Pressure Class: 63 psi
Wall Thickness: 0.331 in
Reviews o
Reviews
Be the first to review this product
AWWA: AWWA C-906
Color Finish Name: Black
10 in. x 50 ft. IPS SDR 32.5 Plastic Pressure Pipe
Part #PEI32A1050 I Item #1880576
(0) Write a Review
Length: 50
Log in or Create Account
J.Qg.in or Create an Account to see product availability.
X Pick Up: Not available
X Shipping: Not available
Documents
� SPECIFICATION
Application:
Potable Water, Reclaimed Water, Water, Sewer, Drainage, Irrigation
Diameter - Inside 1: 10-6/125
End Connection 1: Plain End End Connection 2: Plain End
FM Approved: No Fire Suppression System Rated: No
Material: Plastic Material Type: HOPE
NSF Certified: Yes PipeTubing Size: 10
Schedule Class: SOR 32.5 UL Listed: No
Waterworks PVC Pipe Type: OR32.5
Attachment 4
HDPE Pipe Specs
Note: Pipe should follow the existing pipe slope to the the existing outlet with a minimum 0.5% slope.
The Blanket Method for Bentonite Pond Sealant
This method of applying bentonite pond sealant will be used for the bottom of Ponds No.3 and No.4.
1. The first step of the procedure involves clearing any debris from the surface to be treated such as large rocks, dead vegetation, and roots.
2. Once this has been completed, you must remove 6 inches of soil from what will become the pond’s waterbed.
3. Next, you must use a combination of bentonite and soil to fill in any deep holes, gaps, and crevices along the pond’s surface, in a ratio of 1 part bentonite to 5 parts soil. Once all holes are covered and packed smooth,
4. A layer of bentonite should be applied (at 1 lb/sq.ft.) evenly over the entire waterbed. This should be spread as evenly as possible and smoothed with a sheep roller to incorporate the bentonite into the soil.
5. Finally, the 6 inches of soil that was initially removed should be replaced and compacted with a smooth roller.
6. The pond is now ready to be filled with water. A gentle water flow is recommended to prevent eroding the soil or bentonite layers.
The Mixed Blanket Method for Embankment Construction
This Mixed Blanket Method for Embankment Construction should be used on all Pond Embankments
1. Excavate Pond Embankments as shown in Attachment No. 7.
2. Then mix Bentonite at a rate of 2 lbs/cubic ft. uniformly with the excavated soil.
and then re-construct the pond embankment as shown in Attachement No. 7, compacted in 1 ft. lifts.
3. Then, once the pond embankment has been re-constructed, Bentonite should be applied (sprinkled on surface) at 1 lb/sq. ft. of the side slope surface,wetted with water and then compacted with a smooth roller.
This process will ensure that the soil remains consistent all along the waterbed.
4. The pond is now ready to be filled with water. A gentle water flow is recommended to prevent eroding the soil or bentonite layers.
Attachment 5 Bentonite Application
-Bottom of Pond No. 3 and Pond No.4
-Embankments of Ponds No. 1, 2, 3*, 4*, 5, 6, 10, 11, 12,14, 15, 16, 18, 19, 20, 21, 25, 26, 28, 29, 30.
Note: Ponds No. 3 and No. 4 leak from the bottom and embankment so the Blanket Method must be used for the bottom of the pond and The Mixed Blanket Method for the Embankment of Pond No. 3 and No. 4.
A tta ch m en t 6
AN
TI
-S
EE
P C
O
LL
AR
SE
C
TI
O
N A
-A
PL
AN
V
IE
W
H D
PE
Pi pe
HDPE PipeHDPE Pipe
G R
AD
E
AN
TI
-S
EE
P C
O
LL
AR
SA
N
D
6"
TR
EN
C H
D
EP
TH
TR
EN
C H
W
ID
TH
AN
TI
-S
EE
P C
O
LL
AR
6" A
A
TR
EN
C H
W
ID
TH
W
VD
N R
At ta ch m en t 6
N ot e:
E ac h
Po nd s ho ul d ha ve in st al le d at ft . f ro m
H ea dw al l a nd o ne n ea r t he c en te r o f t he e m ba nk m en t.
ft.
ft.
ft.
ft
(a vg
AutoCAD SHX Text Existing Ground
AutoCAD SHX Text Toe of Slope
AutoCAD SHX Text Top of Embankment
AutoCAD SHX Text Excavation of Embankment
AutoCAD SHX Text Embankment Detail
AutoCAD SHX Text Attachment 7
AutoCAD SHX Text Compacted in 1 ft. Lifts
AutoCAD SHX Text 2:1
AutoCAD SHX Text Cut Detail
AutoCAD SHX Text Note: Cut 2 ft. below toe of slope of bottom of pond.
AutoCAD SHX Text Fill Detail
AutoCAD SHX Text Toe of Slope
WATERMAN VALVE
C-10 CANAL GATE
C-10 gates offer reliable water control on canal and pipeline systems which operate at low and medium heads. They are built-to-last and designed for years of reliable service, offering a typical field life exceeding 40 years. These gates offer superior performance to “look alike” products and best-in-class construction available only from Waterman.
Typical installations include: farm turnouts, control of industrial wastes, drainage and for tide control.
KEY FEATURES
• Gray iron castings with minimum ¼" thickness.
• Superior rail material assures reliable performance and prevents deflection.
• Bolted steel frame in standard painted steel. Optional upgraded galvanized steel frame, or 304 stainless steel frame.
• Adjustable cast iron wedge blocks feature two machine bolts for dependable seating and water tightness.
• Machine-threaded stem provides ease of operation and extended life, choice of stem thread patterns.
• A solid rim “easy-grip” cast iron handwheel is standard.
• Heavy cast bronze lift nut.
MOUNTING OPTIONS
F = Flatback for wall mounting (typically to a concrete headwall structure).
S = Spigot back for mounting to annular or recor spiral corrugated metal pipe.
CIP = Mounting to PVC plastic pipe with solvent welding (sizes up to 12").
C = Mounting to concrete pipe (gate will be shipped with galvanized steel tapered setting collar).
Type 4 = Mounting to plastic pipe with special two-part epoxy (sizes up to 18").
OPTIONS
• Upgrade frame to galvanized steel.
• Upgrade frame to stainless steel, plus all stainless hardware.
• Upgrade finish to special epoxy, coal tar or total galvanized.
• Waterman Rising-Stem Extensions are factory installed to the height required, providing a rising stem and handwheel, keeping threads and lifts above the water level and allowing the amount of gate opening to be readily determined.
• Non-Rising Stem Extensions position the gate handwheel at convenient static operating elevations, eliminating hardware which might otherwise rise into traffic areas.
SIZING
Sizes 6" – 24" maximum 23 feet of seating head
Sizes…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .