About this file

This addendum document pertains to the Town of Montville, Connecticut, and the Montville Water Pollution Control Authority's request for proposals on a Preliminary Engineering Report project. The project encompasses three primary components: a sanitary feasibility study for the Meadows Apartments (114 units, 187 bedrooms) to evaluate on-site system viability versus connection to the Town's sanitary system; conceptual planning for housing expansion on the Meadows Apartment site to support affordable housing goals; and analysis of wastewater treatment facility capacity and strategic positioning to inform future expansion. The scope assumes three days of field testing, six percolation tests, and four in-person project meetings, with a final presentation to Town Council. A mandatory pre-bid site visit is scheduled for September 9, 2026, at 10:00 a.m. at the Montville WPCA facility on Pink Row. Proposals are due October 26, 2026, at 12:00 p.m., and questions must be submitted by September 22, 2026, at 12:00 p.m. Proposals must be submitted in ten bound copies plus a USB drive to the Finance Director. The project completion target is April 1, 2027.

Bidders must submit a detailed scope of work, a lump-sum fee proposal itemized by service component with all assumptions and materials quantified, hourly rates, team resumes, relevant project experience in housing development and wastewater planning, firm overview, subconsultant lists, three municipal or quasi-public agency references from work completed within the past five years, and a detailed project schedule with milestones. The project is funded by a USDA Water & Waste Disposal Predevelopment Planning Grant. Evaluation criteria emphasize scope of work accuracy and thoroughness (25 points), fee proposal and hourly rates (25 points), project schedule (25 points), firm technical expertise and team experience (15 points), project understanding (15 points), regulatory and planning requirements knowledge (10 points), and USDA grant requirements knowledge (10 points). The Town will supply existing reports, GIS mapping, and backhoe with operator for site work. Contact information is provided as Patrick Wall, 860-848-6717 or pwall@montville-ct.org.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Preliminary Engineer Report (PER) for Meadows Apartments and Town of Montville WPCF

Addendum 2 September 16, 2026

Land Use Director Responses to Questions Received

1. Page 2 indicates "Background information, including a conceptual force main routing, is provided in the attached 8-24 review conducted by Town staff."

We did not see that an attachment was provided with the RFP. Can this be provided?

Answer: The routing is in addendum 1 which has been posted online.

2. For Task 3, will the scope for the WCPF Capacity and Strategic Positioning include only the new wastewater flows from the Meadows Apartments or will the WPCF need to be evaluated to include all potential future flow increases (from other new developments, sewer growth, areas of increased wastewater flows, etc.)?

Answer: The study shall include the Meadows’ capacity related to current unit count and future units with any housing expansion on the Meadows site.

The Study shall also include the full build out treatment capacity on the WPCF site, phased construction if necessary. In other words, what is the total flow in MGP can the site (and nearby property should acquisition be appropriate), accommodate. This number will understandably be rough range. The town will work with the consultant to determine how much land acquisition may be appropriate, if any is required. The intent is for the town and state the to understand growth options at the WPCF to support future town commercial and housing development, and separately confirm if the WPCF can accommodate the Meadows under the existing plant capacity, no expansion.

Preliminary Engineer Report (PER) for
Meadows Apartments and Town of Montville WPCF
Addendum 2
September 16, 2026 Land Use Director Responses to Questions Received
1. Page 2 indicates "Background information, including a conceptual force main routing, is provided in the attached 8-24 review conducted by Town staff." We did not see that an attachment was provided with the RFP. Can this be provided?
Answer: The routing is in addendum 1 which has been posted online.
2. For Task 3, will the scope for the WCPF Capacity and Strategic Positioning include only the new wastewater flows from the Meadows Apartments or will the WPCF need to be evaluated to include all potential future flow increases (from other new develo...
Answer: The study shall include the Meadows’ capacity related to current unit count and future units with any housing expansion on the Meadows site. The Study shall also include the full build out treatment capacity on the WPCF site, phased constructi...