This document is an Addendum to the Invitation to Bid (ITB) # 24-208-PW for the Coburg Substation Transformer Installation project issued by the Eugene Water & Electric Board (EWEB) in Oregon. The addendum addresses questions regarding contractor qualifications, the availability of site shutdowns during construction, and other clarifications. It confirms that a general site work contractor can bid on the project as the prime contractor, as long as they or their subcontractor have the required electric safety credentials. The addendum also states that the plant will be shut down during the construction work. The bid closing date remains unchanged, and receipt of the addendum must be acknowledged by the bidder.
The overall project involves excavation, oil containment expansion, subgrade conduits/vault installation, and foundation pouring work at EWEB's Coburg Substation to support a transformer installation. The work will take place in Lane County and Condon City, Oregon. No additional pricing, set-aside, or funding details are provided in the addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 4-21-20
October 21, 2024
ADDENDUM # 1
Coburg Substation Transformer Installation
ITB # 24-208-PW
This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.
QUESTION & ANSWER
1. Section 00450 Submittal of Contractor Qualifications. Given that the majority of scope for this project is site work, please confirm if it is acceptable for a General Site Work Contractor to bid the project as a prime but submit all minimum qualifications for the required Contractor, Oil Containment & Superintendent Qualifications completely from subcontractors?
Yes, it is acceptable for this project as long as either the primary or subcontractor has the electric safety credentials required.
2. Section 01010 Summary of Work, 1.02 Description of Project. Please confirm if the high voltage substation equipment will be live during the construction period or whether EWEB will be able to perform partial or complete area shut downs while the work is being performed.
The plant will be shut down while the work is being performed.
CLOSING DATE AND TIME
Remains unchanged.
This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR
BY CIRCLING THE ADDENDUM NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Sandra Hahn, Purchasing Contact
The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.
Company Name: ________________________________
Signature: ______________________________________
Date __________________________
End of Addendum
File details come from the government source that posted it. Updated .