Addendum_1~1.pdf

PDF 310 KB Posted

Attached to
#245055 Marine Drive NW - Applegate Roadway Improvements
Solicitation number
S-KS0043-00011478
Issued by
Marion County, Oregon

About this file

This document is an Addendum to the Marine Drive - Applegate Roadway Improvements project for the City of Salem, Oregon. The Addendum includes changes to the Special Provisions, including updates to trench excavation and backfill requirements, and the addition of City-furnished materials such as fiberglass poles, junction boxes, and mast arms that the contractor must coordinate to pick up. The project has a contract number of 245055 and a project number of 722514-1, with a closing date of October 1, 2024 at 2:30 p.m.

The Engineer's Estimate for this state and local contract opportunity ranges from $750,000 to $1,250,000. The source of funding is not specified in the provided information. Bidders are required to provide evidence of receipt and acceptance of this Addendum with their proposal submission.

View the file

Other files

File Type Posted
Bid Tabulation~10.pdf PDF
1_Preliminary Bid Register.pdf PDF
Project Manual~16.pdf PDF
Intent to Award Letters.pdf PDF
Addendum_No. 2~3.pdf PDF
245055 Bid Opening Zoom Link.pdf PDF
Drawings~1.pdf PDF
SOLE SOURCE Johnson Barrow.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum (9/18/24; 8:20 AM) Page 1

HD/:\\PUBWKS\PWFILES\GROUP\ENGINEERING\PROJECTS\CIP\722514 MARINE DR NW PH I\722514-1 MARINE DRIVE APPLEGATE ROADWAY IMPROVEMENTS\11 AD BID

AWARD\OREGONBUYS\ADDENDUM 1DOCX.DOCX V.04/10/2015

CONTRACT NUMBER: 245055 DATE OF ADDENDUM: September 18, 2024

PROJECT NUMBER: 722514-1 CLOSING DATE: October 1, 2024

TIME: 2:30 p.m.

CITY OF SALEM, OREGON

CONTRACTS AND PROCUREMENT DIVISION

PUBLIC WORKS DEPARTMENT

ADDENDUM NUMBER: 1

MARINE DRIVE – APPLEGATE ROADWAY IMPROVEMENTS

Addendum No. 1 to the above-mentioned project for the City of Salem, Oregon, is a part of the contract docu-ments, and as such, supersedes anything within the specifications with which it may conflict.

CHANGES TO THE SPECIAL PROVISIONS:

204.4.01C Trench Excavation and Backfill — Delete this subsection of the SCS and replace with the following:

When no bid items exist in the bid schedule, there will be no separate payment for the sewer trench excavation, excavation haul off, potholing, closing or removing abandoned structures, the control of ground and surface waters, shoring, pipe fittings, placing and joining pipe, preparation of subgrade, pipe zone class B bedding, 1”-

0 aggregate trench backfill, compaction, and all other work necessary to install the pipe complete in place. It is understood that this cost thereof is included in and incidental to the contracted prices for the various pipe items of work.

When no bid items exist in the bid schedule, there will be no separate payment for removing and replacing geotextile fabric found during trench excavation including a one-foot overlap when tying new fabric into existing fabric. It is understood that this cost thereof is included in and incidental to the contracted prices for the various pipe items of work.

00970.20 City Furnished Materials — Add the following Subsection to the SCS:

The following materials will be provided by the City for use on this project. Contractor is to coordinate with the identified contact 48 hours prior to pick up of the located material.

MATERIAL STOCKPILE LOCATION CONTACT

Fiberglass Poles & Stubs City of Salem Boneyard Storage

775 Airport Rd SE, Salem

Office: 503-588-6311

Chris Wheeler: 503-588-6309

Junction Boxes

City of Salem Shop Complex

Building No.1

1410 20th St SE, Salem

Office: 503-588-6311

Chris Wheeler: 503-588-6309

Mast Arms Salem Electric Facilities

633 7th St NW, Salem

Office: 503-362-3601

Jamie Buystedt: 503-316-2421

Addendum (9/18/24; 8:20 AM) Page 2

HD/:\\PUBWKS\PWFILES\GROUP\ENGINEERING\PROJECTS\CIP\722514 MARINE DR NW PH I\722514-1 MARINE DRIVE APPLEGATE ROADWAY IMPROVEMENTS\11 AD BID

AWARD\OREGONBUYS\ADDENDUM 1DOCX.DOCX V.04/10/2015

All other items related to the project, including mounting hardware for the mast arms, shall be provided by the

Contractor.

00970.42(f) In-Line Fuse Holder — Delete this subsection of the SCS and replace with the following:

(f) In-Line Fuse Holder - When splicing cable into a new or existing circuit, install a watertight, in-line fuse holder in the nearest junction box with a 2-Pole fuse holder for each current-carrying conductor going up the pole. Insulate terminal ends of the in-line fuse holder using either heat shrink tubing or electrical insulating rubber tape over-wrapped with electrical vinyl plastic tape as specified.

All other terms, conditions, and specifications within the bid documents shall remain unchanged and in effect in their entirety.

Shawna Self, CPPB, Manager

Contracts and Procurement

All bidders are required to provide evidence of the receipt and acceptance of this Addendum No. 1 with their proposal. Signing in the space provided below and submitting the signed Addendum with the proposal satisfies this requirement.

Receipt acknowledged and conditions agreed to this day of , 20 .

NAME OF FIRM:

SIGNATURE:

Addendum (9/18/24; 8:20 AM) Page 3

HD/:\\PUBWKS\PWFILES\GROUP\ENGINEERING\PROJECTS\CIP\722514 MARINE DR NW PH I\722514-1 MARINE DRIVE APPLEGATE ROADWAY IMPROVEMENTS\11 AD BID

AWARD\OREGONBUYS\ADDENDUM 1DOCX.DOCX V.04/10/2015

ADDENDUM ROUTE LOG

DATE OF ADDENDUM NO. September 18, 2024

MARINE DRIVE −− APPLEGATE ROADWAY IMPROVEMENTS

Project Number: 722514-1; Contract Number: 245055

Nicollette Roth, PE, Senior Project Manager

Date signed:

Rick Barnes, PE, Assistant City Engineer

Allen Dannen, PE, City Engineer

9/18/2024

09/18/2024

09/18/2024

2024-09-18T13:21:41-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .