Addendum 1 - PW1302-23.pdf

PDF 151 KB Posted

Attached to
The Oregon Military Museum HVAC Upgrades
Solicitation number
S-24800-00006663
Issued by
Clackamas County, Oregon

About this file

This is Addendum 1 to a Request for Proposals (RFP) issued by Marion County Public Works on May 5, 2023, for contract PW1302-23 regarding Pipe, Pump and Manhole Maintenance services. The addendum documents information from a preproposal conference held on May 25, 2023, and provides clarifications on key procurement requirements. The County is seeking contractors capable of performing pipe rehabilitation using various methods including grouting, mortar, epoxy-style coatings, and Cured-In-Place Pipe (CIPP) lining. Specific pipe sizing details and project scopes will be outlined in individual project work orders issued after contract award rather than in the RFP itself, allowing flexibility in how work will be allocated and sequenced.

The evaluation committee will not conduct broad cost comparisons across all proposals at the initial evaluation stage; rather, the County may award multiple contractors for similar services and compare pricing for specific materials and services when individual projects are defined and ready to proceed. Contractors are encouraged to submit detailed cost proposals including separate rates for different liner types, hourly service rates, and markup fees to provide maximum flexibility in project pricing and execution. The County's approach prioritizes contractor capability and service flexibility over predetermined price structures, allowing for competitive pricing analysis to occur at the project-specific level rather than during the initial contract award phase.

View the file

Other files

File Type Posted
Addendum 1 230027C001 FINAL FOR POSTING.pdf PDF
ITB 230027C001 final for posting.pdf PDF
230027C001 preliminary results.pdf PDF
Humidifier Specs.pdf PDF
Condensing Unit Specs.pdf PDF
RTU Specs.pdf PDF
prebid attendee list 230027C001.pdf PDF
230027C001 Final Bid Results.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PW1302-23 - Pipe, Pump and Manhole Maintenance for Marion County Public Works Page 1 of 2

ADDENDUM #1

TO THE

REQUEST FOR PROPOSALS

PW1302-23 - PIPE, PUMP AND MANHOLE MAINTENANCE

FOR MARION COUNTY PUBLIC WORKS

ISSUED ON 5/5/2023 2:00:00 PM

The following information in this addendum, hereby become part of the Request For Proposals.

It is essential that all prospective Offerors note the content of this Addendum.

A. Preproposal Conference:

May 25 attendance sheet attached.

B. Question and Answers:

1. Pipe Lining

Is there anything specific you’d like Contractors to line rehabilitated pipe with?

a. County is open to most options, including grouting, mortar, epoxy-style, CIPP, etc.

2. Pricing Evaluation

Are you considering prices of different lining types when evaluating proposals?

a. The evaluation committee won’t be evaluating costs across the board at this point in the process. We may award several contractors for similar services and compare pricing for various services and/or materials when a specific project has been outlined.

3. Rate Details

Do you want to see different rates for different liners?

a. Yes, the more detail the better. There is a lot of flexibility in how cost proposals are submitted, so sharing rates for services you can provide, hourly rates for services, markup fees, etc., is helpful.

4. Pipe Sizing

Is the sizing of pipe to be rehabilitated detailed in the RFP?

a. Not yet, that will be outlined in specific projects when contracts have been issued and projects are able to roll forward.

File details come from the government source that posted it. Updated .