ADDENDUM__1__notice_VER_3.docx
DOCX document 75 KB Posted
- Attached to
- Mono Lake ADA Boardwalk Materials
- Solicitation number
- 0000039497
- Issued by
- California
About this file
This is an Addendum #1 to an Invitation for Bid (IFB) issued by the California Department of Parks and Recreation, Sierra District Administration, for the Mono Lake ADA Boardwalk Materials project (Purchase # S25683109). The addendum extends the bid due date from June 30, 2026, to July 1, 2026, at 2:00 PM PT, with a corresponding bid opening date extension to July 1, 2026, at 2:30 PM PT. The project requires the procurement of fiber reinforced polymer (FRP) composite materials for the replacement of a 740 lineal feet by 6 feet wide ADA boardwalk trail. Specifications include 38mm mini-mesh decking panels (4 feet by 6 feet by 1.5 inches thick) with anti-slip surface, bull rail edging, and stainless steel hardware and brackets for connection to concrete Diamond Pier foundations. The materials must be painted in a two-part fluoropolymer coating in RAL 080-30-26 (Smoked Oak) color and engineered for 100 psi live load with 20-foot spans between foundation piers. The last day to submit questions was June 23, 2026, at 2:00 PM PST, with the original bid due date of June 30, 2026, revised to July 1, 2026, at 2:00 PM PT. Bidders must acknowledge Addendum #1 by providing their initials and date with their bid submission.
No pricing terms, set-asides, incumbent information, or funding details are specified in this addendum document. The addendum serves solely to revise key action dates and extend the bid submission timeline while maintaining all other conditions of the original IFB unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Agreement_Cover_Letter_S25683109.pdf | ||
| Attachment_2_-_Technical_Requirements-Statement_of_Work.docx | DOCX document | |
| IFB-Mono_Lake_ADA_Boardwalk_Materials_S25683109_Addendum_1.docx | DOCX document | |
| Attachment_4_-_Narrative_Response_S25683109.docx | DOCX document | |
| Attachment_3_-_Cost_Worksheet_S25683109.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of California Natural Resources Agency Gavin Newsom, Governor
DEPARTMENT OF PARKS AND RECREATION Armando Quintero, Director
SIERRA DISTRICT ADMINISTRATION
PO BOX 266, TAHOMA CA 96142
ADDENDUM #1
Issued: June 17, 2026
Sierra District – Alpine-Mono Sector
Mono Lake ADA Boardwalk Materials Purchase # S25683109
Bid Date: June 30, 2026, at 2:00 PM PT Revised Bid Due Date: July 1, 2026 at 2:00 PM PT
The changes in this addendum shall be included in this procurement, and this addendum shall be part of the procurement documents. All conditions not affected by this addendum remain unchanged.
1. Bid Due Extension:
The bid due date has been extended from Tuesday June 30, 2026, to Wednesday July 1, 2026, at 2:00 PM PT.
2. Bid Forms:
DELETE and REPLACE IFB document with ATTACHED IFB document. The modifications are:
Revised Key Action dates are as follows:
| KEY ACTION |
| DATE & TIME |
| Release of IFB (Event ID# 0000039497) |
| June 16, 2026 @ 12:00 PM, PST |
| Last Day to Submit Questions |
| June 23, 2026 @ 2:00 PM, PST |
June 24, 2026 @ 2:00 PM, PST
| Bid Due Date |
| June 30, 2026 @ 2:00 PM, PST |
July 1, 2026 @ 2:00 PM, PST
| Bid Opening Date |
| June 30,2026 @ 2:00 PM, PST |
July 1, 2026 @ 2:30 PM, PST
All conditions not affected by this addendum remain unchanged.
Bidder shall acknowledge Addendum #1 by providing their initials and date below and return with their bid submission.
Bidder Initial: Date:
END OF ADDENDUM #1
The rest of this page left blank intentionally.
image1.png image10.png
File details come from the government source that posted it. Updated .