Addendum 1 Exhibit 1 Bid Pricing Submittal~2.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- ITB 10667-2 Sitka Sedge Residence Renovation
- Solicitation number
- S-63400-00012220
- Issued by
- Polk County, Oregon
About this file
This is a revised pricing submittal form (Exhibit 1) from Addendum 1 for ITB #10667-2 Sitka Sedge Residence Renovation project issued by Oregon Parks and Recreation Department (OPRD) in Polk County. The project involves renovation and addition to a historic single-family residence at Sitka Sedge State Natural Area. The base bid includes ten line items covering permits, mobilization, erosion control, traffic control, excavation, backfill, landscaping, and building-related work including demolition, construction, plumbing, mechanical, and electrical improvements.
The pricing structure includes a base bid with detailed line items and seven bid alternates covering options for roofing, walkway construction, bathroom fixtures, cabinetry, countertops, water heater systems, and HVAC solutions. A schedule of unit prices for additional work is required for general excavation, rock excavation, backfill, and landscape seeding. The form specifies that all quantities are estimates for bid purposes only, with payment based on actual measured quantities. OPRD reserves the right to adjust or delete quantities as needed. Contractors must include all temporary facilities costs within their bid pricing, including power, lights, heat, telephone, potable water, and portable toilets.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| prebid sign in.jpeg | JPEG file | |
| Bid Tab OregonBuys~1.docx | DOCX document | |
| Attachment B Drawings~17.pdf | ||
| Exhibit 1 Bid Pricing Page~1.xlsx | XLSX spreadsheet | |
| Attachment A Technical Specifications~22.pdf | ||
| ITB 10667-2 Sitka Sedge Residence Renovation~1.pdf | ||
| Addendum 1 to ITB 10667-2 Sitka Sedge State Natural Area Residence Renovation Project.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EXHIBIT 1 |
| PRICING SUBMITTAL FORM - Revised Addendum 1 |
| ITB #10667-2 |
| Sitka Sedge Residence Renovation |
| PRICING SUBMITTAL INSTRUCTIONS: |
| Offerors shall enter pricing and other required information for all Bid Items listed in this Pricing Submittal Form. If this Pricing Submittal Form is replaced by Addenda then Offerors shall use the Addenda forms to provide pricing and other required information. If the Pricing Submittal Form is only modified by Addenda, then Offerors shall follow the instructions in the Addenda for making modifications to the Pricing Submittal Form. Failure to supply the required information in the Pricing Submittal Form or subsequent Addenda may result in Bid rejection as non-responsive. |
The undersigned has carefully examined the Contract Documents and the site of the work, and agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set below. All Work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work, and Offeror agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all incidental Work at no additional cost to the Owner.
Contractor shall furnish all temporary facilities such as power, lights, heat, telephone, potable water, portable toilets and job office as needed to perform the Work at no additional charge to Owner.
| The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities. | |||||
| BASE BID | |||||
| Line Items | Quantity | Unit | Unit Cost | Total Cost | |
| A1 | Permits and Mobilization | 1 | LS | $ - 0 | |
| A2 | Erosion Control | 1 | LS | $ - 0 | |
| A3 | Traffic Control | 1 | LS | $ - 0 | |
| A4 | General Excavation and Earthwork | 35 | CY | $ - 0 | |
| A5 | Backfill Rock | 6 | TON | $ - 0 | |
| A6 | Landscape - Seeding | 500 | SF | $ - 0 | |
| B1 | Building Demolition Work | 1 | LS | $ - 0 | |
| B2 | Building Construction and Improvements | 1 | LS | $ - 0 | |
| B3 | Building Plumbing | 1 | LS | $ - 0 | |
| B4 | Building Mechanical | 1 | LS | $ - 0 | |
| B5 | Building Electrical | 1 | LS | $ - 0 |
TOTAL BASE BID (Lines A1 - B5) $ - 0
BID ALTERNATES
| Line Items | Quantity | Unit | Unit Cost | Total Cost | |
| 1 | BASE BID: Existing metal roofing, gutters, and downspouts to remain where not indicated to be demolished (Cost is included in lump sum of Base Bid Line Item B2. Provide LS here for Existing Metal Roofing portion of B2 for purpose of deduct from Base Bid if Alternate 1 is selected.) | 1 | LS | $ - 0 | |
| ALTERNATE: Replace metal roofing, gutters, and downspouts with specified products and associated membranes, trims, and flashings. Include the removal of the existing 1x4 purlins, the addition of ½” plywood sheathing and ventilation. | $ - 0 | ||||
| 2 | BASE BID: Exterior concrete landing at Door 112, as indicated on Drawings (Cost is included in lump sum of Base Bid Line Item B2. Provide LS here for Exterior Concrete Landing portion of B2 for purposes of deduct from Base Bid if Alternate 2 is selected.) | 1 | LS | $ - 0 | |
| ALTERNATE: 4-foot-wide concrete walkway meeting running slope of less than 5% and cross slope of less than 2% from the driveway to Door 112. Expansion joints at 30’ on center, control joints at 5’ on center. Contractor shall provide topographic survey of this area to Project Manager to layout walkway for construction. Starting and ending points identified on Drawings | 1 | LS | $ - 0 | ||
| 3 | BASE BID: Tile surrounds, as indicated in Drawings and Technical Specifications (Cost is included in lump sum of Base Bid Line Item B2. Provide LS here for Tile Surrounds portion of B2 for purposes of deduct from Base Bid if Alternate 3 is selected.) | 1 | LS | $ - 0 | |
| ALTERNATE: Fiberglass tub and surround modified to allow for window. Fiberglass shower surround, modified to allow for window. | 1 | LS | $ - 0 | ||
| 4 | BASE BID: Wood veneer cabinets, per Section 06 4100 (Cost is included in lump sum of Base Bid Line Item B2. Provide LS here for Wood Veneer Cabinets portion of B2 for purposes of deduct from Base Bid if Alternate 4 is selected.) | 1 | LS | $ - 0 | |
| ALTERNATE: Shop-painted wood casework, per Section 06 4100 | 1 | LS | $ - 0 | ||
| 5 | BASE BID: Quartz countertops and splashes, per Section 12 3600. (Cost is included in lump sum of Base Bid Line Item B2. Provide LS here for Quartz Countertops and Splashes portion of B2 for purposes of deduct from Base Bid if Alternate 5 is selected.) | 1 | LS | $ - 0 | |
| ALTERNATE: Plastic laminate countertops and splashes, per Section 06 4100. | 1 | LS | $ - 0 | ||
| 6 | BASE BID: 50 gallon, electric water heater (Cost is included in lump sum of Base Bid Line Item B3. Provide LS here for 50 Gallon Electric Water Heater portion of B3 for purposes of deduct from Base Bid if Alternate 6 is selected.) | 1 | LS | $ - 0 | |
| ALTERNATE: 5 gpm, electric, tankless water heater | 1 | LS | $ - 0 | ||
| 7 | BASE BID: Heat pump with air handlers, ducted. (Cost is included in lump sum of Base Bid Line Item B4. Provide LS here for Heat Pump w/Air Handlers portion of B4 for purposes of deduct from Base Bid if Alternate 7 is selected.) | 1 | LS | $ - 0 | |
| ALTERNATE: Heat pump with ductless mini-split cassettes. Piping and cassettes shall be concealed in chases, ceilings, and below floor. | 1 | LS | $ - 0 |
| SCHEDULE OF UNIT PRICES: |
| Bidder MUST entering pricing for each item listed below. Prices will be used to calculate payment for additional work per executed Change Order. |
| Line Items | Quantity | Unit | Unit Cost | Total Cost | |
| 1 | General Excavation and Earthwork | 1 | CY in place | $ - 0 | |
| 2 | Rock Excavation | 1 | CY in place | $ - 0 | |
| 3 | Backfill | 1 | CY in place | $ - 0 | |
| 4 | Landscape - Seeding | 1 | SF | $ - 0 |
Bidder Name / Signature Date