Addendum 1.pdf
PDF 242 KB Posted
- Solicitation number
- ARFQ 0211 GSD2700000024 2
- Issued by
- Kanawha County, West Virginia
About this file
This is Addendum 1 to a solicitation issued by the State of West Virginia for John Deere Gator Snowplows and Winches with Installation (ARFQ GSD2700000024). The addendum addresses vendor technical questions and responses regarding equipment specifications for the procurement. The solicitation specifically requires John Deere Model 845M Gators equipped with snowplows and winches. Regarding blade specifications, vendors inquired about using alternative hydraulic systems and materials; however, the Agency mandated that moldboard blades be constructed from Stainless Steel rather than carbon steel, with specifications of 6-foot width and 23-inch height. The addendum permits the use of full hydraulic blades with up/down and left/right angle cylinders as an alternative to winch-based blade operation.
The addendum includes standard terms requiring all provisions of the original solicitation to remain in effect unless specifically modified by this addendum. Vendors are required to acknowledge receipt of all addenda by completing an Addendum Acknowledgment Form and submitting it with their bid; failure to acknowledge addenda may result in bid disqualification. The document emphasizes that only written information officially added to specifications through addenda is binding, and verbal representations made during discussions with state personnel are not binding. The addendum was revised on August 24, 2023, and includes a checkbox acknowledgment form for vendors to confirm receipt of all numbered addenda (1-10) issued with the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised 6/8/2012
SOLICITATION NUMBER: [Insert RFQ, RFP No.] Addendum Number: [Insert Number]
The purpose of this addendum is to modify the solicitation identified as [insert RFQ, RFP No.] (“Solicitation”) to reflect the change(s) identified and described below.
Applicable Addendum Category:
[ ] Modify bid opening date and time
[ ] Modify specifications of product or service being sought
[ ] Attachment of vendor questions and responses
[ ] Attachment of pre-bid sign-in sheet
[ ] Correction of error
[ ] Other
Description of Modification to Solicitation:
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.
Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
ARFQ GSD2700000024 John Deere Gator Snowplows and Winches Vendor Technical Questions and Responses
Q1. Can we use a full hydraulic blade with up/down and left/right angle cylinders? This would eliminate the need for a winch to raise and lower the blade.
A1. Yes.
Q2. Also, I'm asking for an exception on the following moldboard specifications: Blade Width 6', Blade Height 23 ½", Blade 14 Gauge carbon steel. This is a Western Plow Impact HD UTV plow.
A2. No, Agency is mandating a blade made from Stainless Steel.
Q3. Can you tell which Gator models you need the plows for or do you need to purchase two Gators also?
A3. John Dere Model 845M.
Revised 8/24/2023
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.:
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below. Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
[ ] Addendum No. 1 [ ] Addendum No. 6
[ ] Addendum No. 2 [ ] Addendum No. 7
[ ] Addendum No. 3 [ ] Addendum No. 8
[ ] Addendum No. 4 [ ] Addendum No. 9
[ ] Addendum No. 5 [ ] Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid.
I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.
Untitled
| Text1: ARFQ GSD2700000024 |
| Text2: 1 |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Yes |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Text3: |
1. Attach vendor technical questions and answers.
| Company_2: |
| Date: |
| Solicitation Number: ARFQ GSD2700000024 |
| Check Box52: Off |
| Check Box53: Off |
| Check Box54: Off |
| Check Box55: Off |
| Check Box56: Off |
| Check Box57: Off |
| Check Box58: Off |
| Check Box59: Off |
| Check Box60: Off |
| Check Box61: Off |
File details come from the government source that posted it. Updated .