Addendum 1.pdf
PDF 346 KB Posted
- Attached to
- Stormwater Facility Vegetation Management
- Solicitation number
- 26-SWU06
- Issued by
- Dane County, Wisconsin
About this file
This Addendum #1 modifies the Request for Qualifications (RFQ) #26-SWU06 issued by the City of Sun Prairie, Wisconsin, for stormwater facility vegetation management services. The addendum updates the minimum requirements in the Scope of Services section to specify that the technical proposal must include the contractor's approach to providing a variety of land management qualifications of key staff, along with a summary of available equipment and manpower to carry out land management tasks throughout the contract duration. The addendum clarifies the Selection Schedule by confirming that questions on the RFQ must be submitted by Friday, April 3, 2026. The bid date remains unchanged, and this addendum is to be attached to the original RFQ specifications with receipt acknowledged on Form B.
The addendum reinforces the importance of demonstrating qualified personnel and adequate resources as part of the pre-qualification evaluation process for establishing a bidding list of ecological land management contractors. No changes to pricing, insurance requirements, contract term, or evaluation scoring criteria were made through this addendum; all such provisions remain as specified in the original RFQ documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-SWU06 FORM D.PDF | ||
| 26-SWU06 FORM F.PDF | ||
| 26-SWU06 RFQ.PDF | ||
| ATTACHMENT A.PDF | ||
| 26-SWU06 FORM C.PDF | ||
| 26-SWU08_Award Notification Letter.docx | DOCX document | |
| 26-SWU06 FORM G.PDF | ||
| 26-SWU06 FORM A.PDF | ||
| 26-SWU06 QA.pdf | ||
| ATTACHMENT B.PDF | ||
| 26-SWU06 FORM E.PDF | ||
| 26-SWU06 FORM B.PDF |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
FOR
RFQ 26-SWU06
STORMWATER FACILITY
VEGETATION MANAGEMENT
This Addendum is issued to modify, explain or correct the Minimum Requirements in the Introduction section and the Selection Schedule and is hereby made a part of the RFQ 26- SWU06 and Contract Documents. Please attach this Addendum to the specifications in your possession and note receipt of this Addendum on FORM B. The bid date has not been changed.
Correction on Minimum Requirements in the Scope of Services Section I. Introduction, subsection C: Minimum Requirements First Bullet Point updated to:
Technical proposal including approach to providing a variety of land management qualifications of key staff.
o Including a summary of equipment and manpower available to carry out land management tasks throughout the duration of the contract.
Clarification on Selection Schedule Section IV. 2nd bullet point
Friday April 3, 2026: Questions on the RFQ to be submitted by.
END OF ADDENDUM