Addendum 1.pdf

PDF 346 KB Posted

Attached to
Stormwater Facility Vegetation Management
Solicitation number
26-SWU06
Issued by
Dane County, Wisconsin

About this file

This Addendum #1 modifies the Request for Qualifications (RFQ) #26-SWU06 issued by the City of Sun Prairie, Wisconsin, for stormwater facility vegetation management services. The addendum updates the minimum requirements in the Scope of Services section to specify that the technical proposal must include the contractor's approach to providing a variety of land management qualifications of key staff, along with a summary of available equipment and manpower to carry out land management tasks throughout the contract duration. The addendum clarifies the Selection Schedule by confirming that questions on the RFQ must be submitted by Friday, April 3, 2026. The bid date remains unchanged, and this addendum is to be attached to the original RFQ specifications with receipt acknowledged on Form B.

The addendum reinforces the importance of demonstrating qualified personnel and adequate resources as part of the pre-qualification evaluation process for establishing a bidding list of ecological land management contractors. No changes to pricing, insurance requirements, contract term, or evaluation scoring criteria were made through this addendum; all such provisions remain as specified in the original RFQ documents.

View the file

Other files

File Type Posted
26-SWU06 FORM D.PDF PDF
26-SWU06 FORM F.PDF PDF
26-SWU06 RFQ.PDF PDF
ATTACHMENT A.PDF PDF
26-SWU06 FORM C.PDF PDF
26-SWU08_Award Notification Letter.docx DOCX document
26-SWU06 FORM G.PDF PDF
26-SWU06 FORM A.PDF PDF
26-SWU06 QA.pdf PDF
ATTACHMENT B.PDF PDF
26-SWU06 FORM E.PDF PDF
26-SWU06 FORM B.PDF PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

FOR

RFQ 26-SWU06

STORMWATER FACILITY

VEGETATION MANAGEMENT

This Addendum is issued to modify, explain or correct the Minimum Requirements in the Introduction section and the Selection Schedule and is hereby made a part of the RFQ 26- SWU06 and Contract Documents. Please attach this Addendum to the specifications in your possession and note receipt of this Addendum on FORM B. The bid date has not been changed.

Correction on Minimum Requirements in the Scope of Services Section I. Introduction, subsection C: Minimum Requirements First Bullet Point updated to:

Technical proposal including approach to providing a variety of land management qualifications of key staff.

o Including a summary of equipment and manpower available to carry out land management tasks throughout the duration of the contract.

Clarification on Selection Schedule Section IV. 2nd bullet point

Friday April 3, 2026: Questions on the RFQ to be submitted by.

END OF ADDENDUM