Addendum 1.pdf
PDF 1 MB Posted
- Solicitation number
- CRFQ-0803-DOT1900000012-2
- Issued by
- Taylor County, West Virginia
About this file
This document is an Addendum to a Request for Quotation (RFQ) issued by the West Virginia Department of Transportation (WVDOT) for a Central Master Agreement contract to purchase 6x4 Rubber Tired Multi-Purpose Excavators and related accessories. The addendum modifies the original solicitation by adding an equipment preventative maintenance questionnaire, providing answers to vendor questions, and including pre-bid conference sign-in sheets. The excavators are to be delivered to the WVDOT's Division of Highways Equipment Division located in Buckhannon, West Virginia. The solicitation closes on September 19, 2018 at 1:30 PM. The contract is for an indefinite quantity of excavators and related attachments over an unspecified term.
The addendum clarifies that vendors must be able to accept electronic fund transfer (EFT) payments, but are not required to accept payment by purchasing card. Pricing details, funding sources, and incumbent information are not provided in the addendum, though the original solicitation may contain this information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit A Pricing Page.xlsx | XLSX spreadsheet | |
| Final_CRFQ_0803_DOT1900000012_1_CRFQ_FORM.PDF | ||
| Final_CRFQ_0803_DOT1900000012_2_CRFQ_FORM.PDF | ||
| Solicitation Documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
^ Purchasing Divison ^ 2019 Washington Street East .pi Post Office Box 50130 O Charleston, WV 25305-0130
State of West Virginia Request for Quotation
19 — Highways
Proc Folder 476503
Doc Description: ADDENDUM 1 6X4 RUBBER TIRED MULTI-PURPOSE EXCAVATOR W/OPT.
Proc Type: Central Master Agreement Date Issued Solicitation Closes Solicitation No
2018-09-07 2018-09-19 CRFQ 0803 DOT1900000012 2
I 13:30:00
Version
BID CLERK
DEPARTMENT OF ADMINISTRATION
PURCHASING DIVISION
2019 WASHINGTON ST E
CHARLESTON
US
Vendor Name, Address and Telephone Number:
FOR INFORMATION CONTACT THE BUYER
Crystal Rink
(304) 558-2402 crystal.g.rlnk@wv,gov
DATE
All offers subject to all terms and conditions contained in this solicitation
Page; 1 FORM ID : WV-PRC-CRFQ-001
DDITIONAL INFORMATION:
THE STATE OF WEST VIRGINIA PURCHASING DIVISION FOR THE AGENCY, WEST
BIDS TO ESTABLISH AN OPEN-END CONTRACT FOR 6X4 RUBBER TIRED MULTI-PURPOSE EXCAVATOR WITH OPTIONAL
ATTACHMENTS PER THE ATTACHED DOCUMENTS.
INVOICE TO Ship to
DIVISION OF HIGHWAYS
EQUIPMENT DIVISION RT 33
83 BRUSHY ROAD CROSSING. PO BOX 610
BUCKHANNON WV26201
DIVISION OF HIGHWAYS
EQUIPMENT DIVISION
83 BRUSHY FORK RD CROSSING
BUCKHANNON WV 26201
Comm Ln Desc
6x4 Rubber Tired Multi-Purpose 20.00000 Excavator
Unit Issue Unit Price Total Price
Comm Code
22101525
Manufacturer Specification Model #
Extended Description :
6x4 Rubber Tired Multi-Purpose Excavator
DIVISION OF HIGHWAYS
EQUIPMENT DIVISION RT 33
83 BRUSHY ROAD CROSSING, PO BOX 610
BUCKHANNON WV26201
DIVISION OF HIGHWAYS
EQUIPMENT DIVISION
83 BRUSHY FORK RD CROSSING
BUCKHANNON WV 26201
Comm Ln Desc
Ditching Bucket
Qty
20.00000
Unit Issue Unit Price Total Price
Comm Code
22101702
Manufacturer Specification Model #
Extended Description ;
Ditching Bucket
DIVISION OF HIGHWAYS
EQUIPMENT DIVISION RT 33
83 BRUSHY ROAD CROSSING, PO BOX 610
DIVISION OF HIGHWAYS
EQUIPMENT DIVISION
83 BRUSHY FORK RD CROSSING
BUCKHANNON WV26201 BUCKHANNON WV 26201
Extended Description:
Hydraulically Operated Limb Shears
DIVISION OF HIGHWAYS
EQUIPMENT DIVISION RT 33
83 BRUSHY ROAD CROSSING, PO BOX 610
BUCKHANNON WV26201
US
DIVISION OF HIGHWAYS
EQUIPMENT DIVISION
83 BRUSHY FORK RD CROSSING
BUCKHANNON WV 26201
Total PriceUnit PriceUnit IssueQty
20.00000
Comm Ln Desc
Digging Bucket
Model #SpecificationManufacturerComm Code
22101702
Extended Description :
Digging Bucket
DIVISION OF HIGHWAYS
EQUIPMENT DIVISION RT 33
83 BRUSHY ROAD CROSSING, PO BOX 610
WV26201BUCKHANNON
SHIP TO
DIVISION OF HIGHWAYS
EQUIPMENT DIVISION
83 BRUSHY FORK RD CROSSING
BUCKHANNON
Total PriceUnit PriceUnit IssueQty
20.00000
Comm Ln Desc
Hydraulic Thumb/Grapple
Mode #SpecificationComm Code
22101709
Manufacturer
Extended Description:
Hydraulic Thumb/Grapple
SOLICITATION NUMBER: crfq doti 900000012
Addendum Number: 1
The purpose of this addendum is to modify the solicitation identified as ("Solicitation") to reflect the change(s) identified and described below.
Applicable Addendum Category:
I ] Modify bid opening date and time
( 1 Modify specifications of product or service being sought
I y 1 Attachment of vendor questions and responses
[ y 1 Attachment of pre-bid sign-in sheet
[ 1 Correction of error
[ y 1 Other
Description of Modification to Solicitation:
1. To add Exhibit B that was inadvertently no included in the original solicitation documents
2. To provide answers to vendor questions
3. To provide pre-bid meeting sign-in sheets
Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Attachment A and is specifically incorporated herein by reference.
Terms and Conditions:
1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.
2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgment, a copy of which is included herewith.
Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.
Revised 6/8/2012
ATTACHMENT A
Revis^ 6/8/2012
EXHIBIT B
EQUIPMENT PREVENTATIVE MAINTENANCE QUESTIONNAIRE
THIS FORM MUST BE COMPLBTED IN ITS ENTIRETY BY SUCCESSFUL BIDDER OR MANUFACTURER'S TECHNICAL
REPRESENTATIVE PRIOR TO DELIVERY TO THE WVDOH.
DESCRIPTION:
MODEL: YEAR:
ENGINE: MAKE:
BELTS:
MODEL:
HORSEPOWER: CYLINDER:
COOLING SYSTEM CAPACITY:
DESCRIPTION:
MAKE:
PURCHASE AMOUNT:
FUEL TYPE:
ENGINE SERIAL:
PART NUMBERS:
GVW: AXLE CAPACITY:FRONT:
TIRES: FRONT MAKE & SIZE:
REAR MAKE & SIZE:
DIMENSIONS OF UNIT: LENGTH:
VENDOR CONTACT PERSON:
WIDTH:
PARTS:
BATTERY MAKE:
TOP OR SIDE POST:
SPARK PLUGS OR FUEL INJECTORS MAKE:
FUEL PUMP OR INJECTION PUMP MAKE: _
ALTERNATOR MAKE:
STARTER MAKE:
TURBO CHARGER MAKE:
TRANS. MAKE:
MODEL:
DIMENSIONS: LENGTH
PART#
MODEL:
PART#
PART#
PART#
MODEL:
HYDRAULIC PUMP MAKE: MODEL:
FILTERS
OIL
AIR INNER
AIR OUTER
MAKE PART NO.
FUEL PRIMARY
FUEL SECONDARY
COOLANT
HYDRAULIC
OTHER
LUBRICANT
ENGINE
TRANSMISSION
POWER STEERING
HYDRAULIC
DIFFERENTIALS _
BRAKE FLUID
COOLANT
OTHER
REAR:
LENGTH:
PHONE:
CCA:
WIDTH HEIGHT
AUTO/MANUAL:
MANUFACTURER TYPE
CRFQ 0803 DOT1900000012
ADDENDUM 1
(410 Class) 6x4 Rubber Tired Muitl-Purpose Excavator with Opt. Attachments
Answers to Technical Questions
The original language in contract will be listed first with question and answer to follow below.
1. 3.1.3 Engine:
Question: This section refers to a single engine design, I ask that a dual engine design be accepted as in the past.
Answer: Leave as written, single engine
2. 3.1.4.1 Transmission shall be fully automatic Allison RDS 3500 transmission minimum of 6-forward speeds and 1-reverse speed or equal.
Question # 1: Ours is RDS 3000 not RDS3500.
Answer: We will accept a RDS 3000
3. 3.1.17.4 Minimum reach (Cleanup - Bucket level, ground level boom retracted): 10-foot minimum.
Question # 1: We are not 10 Ft, we are at 12 Ft 5 In.
Question # 2: After reviewing the specifications of two manufacturers of telescoping boom excavators, it is clear that minimum reach does apply to how far the boom for cleanup purposes with bucket level at ground level does refers to how close to the excavator the bucket will be. Therefore, I think the wording in this section is correct.
Answer: We will accept
4. TCP Section:
15. Payment Methods:
Question: Payment Methods - Vendor must accept payment by P-Card. In the past we have been assured by the Auditor's office and WVDOT Finance that the P-card would not be used for payment for capital goods purchases, and for very good reasons. The use of P-cards adds several percent to vendor costs, which will be passed on to West Virginia agencies. I ask that, as in the past, vendors must not be required to accept payment by P-card for capital goods purchases.
Answer: Vendors are encouraged to get set up for Electronic Fund Transfers (EFT). Due to system limitations, pcard payments are not available.
5. Exhibit B
The Equipment Division inadvertently missed submitting Exhibit B with bid package, we will add this form to the addendum.
M w w i v i l i i A C M U C
S I G N
IN S
H E E T
Request ftjr Quotation Number C «.fQ o Scrj O n o o^oo o /j, pate-
Pntject Description:
may RESULtIn ot'aw liS"YOUR''gS?^I!g?'
"N A TIMELY MANNER. FAILURE TO 00 SO
Firm N a m e
N F O R f t l A T I O N
Firm Address:
RepresenaUve Attending:
P h o n e Number:
F a x N u m b e r
E m a i l A d d l e s
Firm N a m e
Firm Address:
Represenative Attending:
P h o n e N u m b e r
F a x N u m b e r
E m a i l A d d r a s R
Firm Address:
Represenative Attending:
P h o n e N u m b e r
F a x N u m b e r
E m a i l A d d r e s s n
■L3 ^ f 1
Firm
N am e:
Firm
A ddress:
ilU /W.
Phone N um ber:
F ax N um ber:
E m ail A ddress:
F irm
N am e:
F irm A ddress:
Represenative Attending:
P hone N um ber:
Fax N um ber:
E m ail A ddress:
sQ
Firm N am e:
F irm
A ddress:
Represenative Attending:
P hone N um ber:
Fax N um ber:
E m ail A ddress:
PRE-BID C
O N F E R E N C E
S I G N
IN S
H E E T
Request for Quotation NumbenC«Q oSarj Date-
Project DescrlpBon: C, -* H "RobU,Tl r^.^ la- , 9^ c i i m T r u r p Q g e p
(JT
Firm Address:
Ti^ZArr-r,afj H
PrO/3,,Qjrc^rr'"
RepresenativeAttending:
l o A Z S T a Z t o t
B I D n f o r m a t i o n
Firm N a m e
Firm Address:
A
TIMELY MANNER. FAILURE TO D
O S O
Represenative Attending:
P h o n e N u m b e r
F a x N u m b e r
E m a i l A d d r e s s
F i r m N a m e
Firm Address:
Represenative Attending:
P h o n e N u m b e r
F a x N u m b e r
E m a i l A d d r e s s hr^dfrson p T i l/if
T L -egsaui't
U a q M u I h
3c>H^ ̂ 71 n
/ 5^ bSfrrt r i
Firm N a m e
Firm A d d r e s s
Represenative Attending:
P h o n e N u m b e r
F a x N u m b e r
E m a i l A d d r e s s
Firm N a m e
Firm A d d r e s s
L a L m 5 rl|'Lcajl^
Q S J O
Z Z I E
Represenative Attending:
Phone Number:
^^3?
F a x N u m b e r
E m a i l A d d r e s s
K J S c c i c
F i n n N a m e
Firm A d d r e s s
Represenative Attending:
P h o n e N u m b e r
F a x N u m b e r
E m a i l A d d r e s s
Run with ilic Best'
Eric Brookes
19 Goff Crossing Drive Cross Lanes, WV 25313 brookeseric@Iec 1 .com vvwwJccl.com
John Deere
Sales Representative
Office: 304-204-1818
Fax: 304-204-1811
Cell: 304-542-0433
A Anderson iEQUIPMENTCOIHPANY
Your COMPLETE Equipment Solution
Bert Smith Sales Representative
I'Kes? Virginia Salesman of the Year 2014
Fairmoni Brancf- 2007 Ruskin I>lv6
Reasanl Valley, WV 26564 bsmfth@andersonequip.corr
Phwie: 304.366-3075 Fax: 304-366-7214
Mobile: 304-614-5811 www.andersonequip.com
OFFICE (304) 346-5301
(800) 640-8245
WEST VIRGINIA
TRACTOR COMPANY
CONSTfiUCTION, MINING, MUNICIPAL t INDUSTRIAL EQUIPMENT www.wvtractor.com
GARYW. GRADY
PRESIDENT
Cell (304) 549-6066 wvtractor@msn.com
P. O. BOX 473
214 VIRGINIA ST. W,
CHAS.. WV 25322/25302
ADDENDUM ACKNOWLEDGEMENT FORM
SOLICITATION NO.: D0T1900000012
Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.
Failure to acknowledge addenda may result in bid disqualification.
Acknowledgment: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.
Addendum Numbers Received:
(Check the box next to each addendum received)
[ Addendum No. 1
Addendum No. 2
Addendum No. 3
Addendum No. 4
Addendum No. 5
Addendum No. 6
Addendum No. 7
Addendum No. 8
Addendum No. 9
Addendum No. 10
I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor's representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.
Company
Authorized Signature
Date
NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.
Revised 6/8/2012
File details come from the government source that posted it. Updated .