Addendum 1 Bid Pack 3B.pdf

PDF 492 KB Posted

Attached to
472/17398. SMD Bid Pkg 3 Razor Ribbon Project - Various CFs
Solicitation number
RFQ 171 180000000615 4
Issued by
Michigan

About this file

This is an Addendum to the original bid documents for five Michigan correctional facilities projects managed by Consulting Engineers, Inc. The addendum modifies the original contract documents for projects at Charles Egeler Correctional Facility, Gus Harrison Correctional Facility, Lakeland Correctional Facility, Parnall Correctional Facility, and Thumb Correctional Facility. The bid due date has been extended to June 13, 2018. The contract may commence up to September 17, 2018, with project completion required within 150 days of the start date. Reissued drawings have been provided for all five facilities, with sign sheets attached for each project. A significant change for Parnall Correctional Facility specifies that the building will no longer be demolished.

The addendum takes precedence over the original contract documents and applies to all bidders receiving plans and specifications. Bidders are required to note receipt of this addendum on the Bid Summary. All incidental items necessary to complete the modifications described in the addendum are to be included in bids, even if not explicitly detailed. The addendum does not address pricing terms, set-asides, or other financial parameters, which remain governed by the original contract documents.

View the file

Other files

File Type Posted
Addendum 2 Bid Pack 3B - SIGMA.pdf PDF
Drawings - 3B Gus Harrison.pdf PDF
LEIN Request REV 04-2018 Bid Pkg 3.pdf PDF
Specifications - 3B 17398.pdf PDF
Advertisement Bid Pkg 3B 17398.pdf PDF
Drawings - 3B Egeler.pdf PDF
Addendum 3 Bid Pack 3B.pdf PDF
Drawings - 3B Parnall.pdf PDF
Drawings - 3B Lakeland.pdf PDF
Drawings - 3B Thumb.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CO N S U LT I N G EN G I N E ER S , I N C.

1601 E. GRAND RIVER, LANSING, MI 48906

PHONE: (517) 487-2511

FAX: (517) 487-2544

ADDENDUM NO. 1

Date: 05/24/18 Project Name:

Charles Egeler Correctional Facility- File # 472/17403.SMD - INDEX NO. 60230

Gus Harrison Correctional Facility- File # 472/17402.SMD – INDEX NO. 24590

Lakeland Correctional Facility- File # 472/17399.SMD – INDEX NO. 45730

Parnall Correctional Facility- File # 472/17430.SMD– INDEX NO. 21100

Thumb Correctional Facility- File # 472/17398.SMD– INDEX NO. 34660

This Addendum is issued for the purpose of modifying and/or clarifying the original Contract Documents and shall take precedence over them.

All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.

This addendum is being sent to all bidders receiving plans and specifications. Receipt of this Addendum shall be noted on the Bid Summary in the appropriate location.

Clarification and Questions:

A1.1 Clarification: Bid due date has extended to June 13, 2018.

A1.2 Clarification: project schedule contract may start project up to September 17, 2018 complete within 150 Days of start date.

Charles Egeler: (Drawings Reissued)

A1.3 Sign sheet attached

ADDENDUM NO. 1

Gus Harrison: (Drawings Reissued)

A1.1 Sign sheet attached.

Lakeland: (Drawings Reissued)

Parnall: (Drawings Reissued)

A1.1 Building will no longer be demolished.

A1.2 Sign sheet attached.

Thumb: (Drawings Reissued)

End of Addendum No. 1

Addendum No 1