Addendum_1_B-25-07-COC.pdf
PDF 308 KB Posted
- Solicitation number
- B-25-07-COC
- Issued by
- Brevard County, Miramar Beach CDP, Florida
About this file
This document is Addendum 1 for Invitation to Bid (ITB) # B-25-07-COC issued by the City of Cocoa, Florida's Finance Department, Purchasing Division for the Banana River Booster Station Chloramination Improvements project. The addendum modifies two key aspects of the original bidding documents: first, it expands the reference to construction drawings and specifications to now include Exhibit A and Exhibit B, and second, it changes the pre-bid conference from "Non-Mandatory" to "Mandatory". The addendum is dated July 29, 2025, and requires bidders to acknowledge receipt on a specific form.
The addendum provides contact information for further questions at purchasing@cocoafl.org and is signed by Brian Dale, Purchasing Manager for the City of Cocoa. All other bidding and contract documents and specifications remain unchanged. The project appears to involve improvements to the Banana River Booster Station's chloramination system, though specific technical details are not elaborated in this document. Potential bidders are advised to carefully note the changes, particularly the mandatory nature of the pre-bid conference, which may impact their ability to submit a bid.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 29, 2025
Addendum 1 To the Contract Documents and Specifications:
ITB # B-25-07-COC
Banana River Booster Station Chloramination Improvements
To All Plan Holders:
The following addresses and provides clarification of the Bidding Documents and Specifications as fully and completely as if the same were fully set forth therein. Receipt of this addendum must be noted on the Receipt of Addendum(s) and Acknowledgement Form.
A. This addendum includes and addresses the following corrections:
1. Section 1.01 DESCRIPTION OF WORK, paragraph 2
The existing test:
“All work shall be constructed according to the Construction Drawings and Specifications provided in Exhibit A, the contract Documents for the Construction of the Banana River Chloramination Improvements and are made part of the contract by reference” is replaced with:
to “All work shall be constructed according to the Construction Drawings and Specifications provided in Exhibit A, Exhibit B and the contract Documents for the Construction of the Banana River Chloramination Improvements and are made part of the contract by reference”.
2. Section1.04 SOLICITATION SCHEDULE
The "Non-Mandatory Pre-Bid Conference” listing in the solicitation schedule is hereby revised to "Mandatory Pre-Bid Conference.”
Finance Department, Purchasing 65 Stone Street • Cocoa, FL 32922
PHONE: (321) 433-8844
www.CocoaFL.gov
B. All other Bidding/Contract Documents and Specifications remain unchanged.
Should there be additional questions or clarification needed please contact the Purchasing and Contracts Division at purchasing@cocoafl.org.
Brian Dale, Purchasing Manger
City of Cocoa mailto:purchasing@cocoafl.org
File details come from the government source that posted it. Updated .