This is Addendum #1, issued November 4, 2025, to the original contract drawings and specifications for the Michigan Department of Transportation (MDOT) Atlanta Vehicle Lift Replacement project in Atlanta, Michigan. The project involves the replacement of an in-ground vehicle lift system at an existing maintenance garage facility. The addendum amends contract documents dated August 15, 2025, and October 10, 2025, and was issued prior to construction start. Key modifications include rotating the jacking beam pit 180 degrees and relocating it to the opposite end of the lift at the entry door side per local MDOT staff request. Revised drawings include demolition plans, lift installation plans, structural details, and preliminary Stertil-Koni lift equipment drawings with updated pit locations. The project scope encompasses concrete pit construction, structural steel work, electrical and pneumatic connections, and lift equipment installation. Two contractors attended the pre-bid walk-through: Ripman Construction and Power Construction.
The addendum addresses several pre-bid requests for interpretation, confirming that soil and concrete testing requirements are specified on sheet S-001 under special inspections, rebar does not require epoxy coating, pit nosing angles must be galvanized, and an optical sensor will be added to the controller to allow vehicles other than the standard 11-foot-high plows to be lifted to the maximum overhead clearance allows. The general contractor position remains to be determined (TBD). The project is designed and managed by Sidock Group, Inc. (Gaylord, Michigan) with MEP engineering by Matrix Consulting Engineers. The lift equipment is a Skylift 780-9 FM APC JB model supplied by Stertil-Koni, with Kessler Equipment as the lift installer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gaylord ● Lansing ● Muskegon ● Novi ● Sault Ste. Marie ● Wyandotte ● Williamsport, PA ● Tampa, FL 757 South Wisconsin Avenue • Gaylord, Michigan 49735 www.sidockgroup.com
Addendum #1 - 11/4/25
PROJECT No.: 525219 DTMB MDOT ATLANTA VEHICLE LIFT REPLACEMENT
OWNER/ CLIENT: MDOT
ARCHITECT: SIDOCK GROUP, INC. GAYLORD, MI
CONTACT PERSON: GINT A. GASKA, AIA
PROJECT MANAGER
MEP ENGINEER: MATRIX CONSULTING ENGINEERS
TRISTAN HOLLANDSWORTH
ELECTRICAL ENGINEER
GENERAL
CONTRACTOR: TBD
1. GENERAL
This Addendum is issued prior to the start of construction and amends the contract drawings and specifications dated August 15, 2025 for “Construction” and Specifications dated October 10, 2025.
Except as otherwise specifically mentioned, the general character of the work required by this Addendum shall be the same as originally specified, and all incidentals required in connection with the work hereinafter described shall be included even though not specifically mentioned.
Where an item is mentioned with no additional specifications given, reference shall be made to the original specifications.
2. REVISED DRAWINGS AND SPECIFICATIONS:
A-1 Demolition Plan, Plan, Enlarged Plan, Reflected Ceiling Plan – Jacking Beam Pit rotated 180 degrees.
A-2 Lift Install Plans, Certification – Jacking Pit relocated to opposite end of lift.
S-1 Structural Plans and Details – pit rotated and pit nosing to be galvanized note added.
MDOT Atlanta, MI, SKYLIFT 780-9 FM APC JB P01.pdf – Preliminary Stertil-Koni drawings with revised pit location.
Sensor Connection.pdf – proposed component to allow proximity sensor addition to console.
3. RESPONSES TO PRE-BID REQUESTS FOR INTERPRETATION/INFORMATION.
a. Are there any soil and concrete testing requirements? YES, AS LISTED ON SHEET
S-001, SPECIAL INSPECTIONS.
b. Does the rebar require an epoxy coating? NO.
Addendum #1 11/4/2025 525219 DTMB MDOT ATLANTA LIFT Page 2
c. Do the angles around the top of the pits needed to be galvanized? YES.
d. Discussion about the need for a kill switch/emergency shut off button. YES, AN
OPTICAL SENSOR CAN AND WILL BE ADDED TO THE CONTROLLER. THIS
WILL ALLOW VEHICLES OTHER THAN THE 11’-0” HIGH PLOWS TO BE
LIFTED TO THE MAXIMUM THAT THE OVERHEAD CLEARANCE ALLOWS.
e. Desire by local MDOT staff to have the jack and beam pit to the entry door side of the lift. A NEW HOIST PIT PLAN IS ATTACHED INDICATING THE REVISED
LOCATION OF THE CENTER PIT.
SEE ATTACHED SIGN IN SHEET AND KNOWN PLAN HOLDERS LIST
A. PLAN HOLDERS LIST:
1) RIPMAN CONSTRUCTION*
2) POWER CONSTRUCTION*
* ATTENDED WALK THRU
-End of Addendum #1-
2'-91 2" 3'-5" 2'-91
2"
9'-0" PIT
8" 2'
-6
'-0
1 2" P
IT
5'-6"
'-0
1 2"
5'-6"9'-0"
3'-5"
'-0
2'-91 2"
CL
CL
EQ. EQ.
OF BAY
OF BAY
CL
2'-4"
1' -7
"10"
1' -1
0"
2'-9"
CL
2'-4"
20'-0"
CL
CL
EXISTING NOTES
1. CONTRACTOR MUST VISIT THE SITE AND FAMILIARIZE HIMSELF WITH ALL EXISTING
CONDITIONS. VERIFY MEASUREMENTS WITH CORRESPONDING CONSTRUCTION OR EXISTING
CONDITIONS PRIOR TO PROCEEDING WITH THE WORK, AND NOTIFY THE ARCHITECT
IMMEDIATELY OF SIGNIFICANT DISCREPANCIES.
2. VERIFY ALL CONDITIONS COVERING OR AFFECTING THE STRUCTURAL WORK; OBTAIN AND
VERIFY ALL DIMENSIONS AND ELEVATIONS TO ENSURE THE PROPER STRENGTH, FIT AND
LOCATION OF THE STRUCTURAL WORK; REPORT TO THE ARCHITECT ANY AND ALL
CONDITIONS WHICH MAY INTERFERE WITH OR OTHERWISE AFFECT OR PREVENT THE
PROPER EXECUTION AND COMPLETION OF THE NEW WORK. ALL DISCREPANCIES SHALL BE
FULLY RESOLVED PRIOR TO COMMENCING WORK.
3. EXISTING CONSTRUCTION NOT UNDERGOING ALTERATION IS TO REMAIN UNDISTURBED,
WHERE SUCH CONSTRUCTION IS DISTURBED AS A RESULT OF THE OPERATIONS OF THIS
CONTRACT, IT MUST BE REPAIRED OR REPLACED BY THE CONTRACTOR AS REQUIRED AND
TO THE SATISFACTION OF THE ARCHITECT.
4. WHERE THE EXISTING CONSTRUCTION IS TO BE ALTERED, OR OTHERWISE DISTURBED,
PROVIDE TEMPORARY AND/OR PERMANENT BRACING AND SHORING AS MAY BE REQUIRED
BEFORE AND DURING OPERATIONS AND UNTIL THE WORK IS SAFELY COMPLETED AND NO
LONGER NEEDS SAME.
5. EACH CONTRACTOR SHALL PROVIDE ALL THE NECESSARY SUPPORT, BRACING, SHORING,
ETC. (TEMPORARY AND/OR PERMANENT) OF BOTH NEW AND EXISTING CONSTRUCTION AS
REQUIRED FOR THE SAFE INSTALLATION OF THE NEW CONSTRUCTION AND EQUIPMENT.
6. THE STRUCTURE IS DESIGNED TO BE SELF SUPPORTING AND STABLE AFTER THE BUILDING IS
FULLY COMPLETED. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE
ERECTION PROCEDURE AND SEQUENCE, AND TO ENSURE THE SAFETY OF THE BUILDING AND
ITS COMPONENT PARTS DURING ERECTION. THIS INCLUDES THE ADDITION OF TEMPORARY
BRACING, GUYS OR TIE-DOWNS IF NECESSARY.
7. THE CONTRACTOR IS RESPONSIBLE FOR MEANS, METHODS, SEQUENCES, AND PROCEDURES
OF CONSTRUCTION.
8. PROVIDE FIRE WATCH DURING FIELD CUTTING AND WELDING OPERATIONS, MEETING THE
OWNER'S REQUIREMENTS.
9. ALL EXISTING STRUCTURAL MEMBERS TO REMAIN, U.N.O.
CONTINUED USE OF FACILITIES:
1. EACH CONTRACTOR SHALL AT ALL TIMES MAINTAIN A CLEAN AND SAFE PASSAGEWAY FOR
THE OWNER' S OPERATION AND PERSONNEL IN EXISTING AREAS AND MAINTAIN CLEARANCES
ADJACENT TO AND IN CONNECTION WITH THE WORK PERFORMED.
2. EACH CONTRACTOR SHALL EFFECTIVELY CONFINE DUST, DIRT AND NOISE TO THE ACTUAL
CONSTRUCTION AREA AS APPROVED BY THE GENERAL CONTRACTOR IN ACCORDANCE WITH
STATE OF MICHIGAN REGULATIONS.
3. WORK SHALL, IF REQUIRED, BE CONSTRUCTED IN PHASES TO ACCOMMODATE THE OWNER'S
USE OF THE PREMISES DURING THE CONSTRUCTION PERIOD AND FOR INSTALLATION OF HIS
EQUIPMENT. COORDINATE THE CONSTRUCTION SCHEDULE WITH THE GENERAL
CONTRACTOR AND OWNER'S REPRESENTATIVE.
4. DURING THE CONTRACTOR'S PERFORMANCE OF THE WORK OF THIS CONTRACT, THE
OWNER'S WILL CONTINUE TO OCCUPY THE EXISTING BUILDING. INTERRUPTION OF BUILDING
ACCESS AND FACILITIES BY THE CONTRACTOR WILL NOT BE PERMITTED; TO WHATEVER
EXTENT SUCH INTERRUPTIONS MIGHT INTERFERE WITH OWNER'S OCCUPANCY. LIMIT
CONSTRUCTION OPERATIONS TO THOSE METHODS AND PROCEDURES WHICH WILL NOT
ADVERSELY AND UNDULY EFFECT THE WORKING ENVIRONMENT OF OWNER'S OCCUPIED
SPACES, INCLUDING NOISE, DUST, ODORS, AIR POLLUTION, AMBIENT DISCOMFORT, POOR
LIGHTING, HAZARDS AND OTHER UNDESIRABLE EFFECTS AND CONDITIONS. COORDINATE AND
SCHEDULE ALL WORK IN EXISTING BUILDING WITH OWNER AND GENERAL CONTRACTOR.
1. ALL EXISTING CONSTRUCTION TO REMAIN U.N.O.
2. REMOVE ALL MATERIALS AND DEBRIS CREATED DURING THE DEMOLITION AND/OR CONSTRUCTION PROCESS AND DISPOSE OFF SITE IN A SAFE AND LEGAL MANNER.
3. PERFORM ALL DEMOLITION WORK REQUIRED ON THE EXISTING BUILDING AS CALLED FOR ON THE DRAWINGS AND/OR AS REQUIRED TO ACCOMMODATE THE WORK.
4. CAP, PATCH AND REPAIR ALL HOLES AND SURFACES IN WALLS, FLOORS AND CEILINGS WHERE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND/OR ELECTRICAL ITEMS ARE REMOVED AS A
RESULT OF THE DEMOLITION OPERATIONS.
5. ALL EXISTING CONCRETE SLAB ON GRADE TO REMAIN. PATCH AND REPAIRED, AND/OR FILL EXISTING CONST. AS REQ. TO RECEIVE NEW FINISHES.
6. CARRY OUT ALL DEMOLITION WORK IN CLOSE COORDINATION AND COOPERATION WITH STRUCTURAL TRADES FOR PROPER SEQUENCING OF THE WORK TO ASSURE THE COMPLETE SAFETY AND STRUCTURAL INTEGRITY OF THE BUILDING AND ITS ELEMENTS AT ALL TIMES. PROVIDE TEMPORARY COLUMNS, JACKS, BEAMS, ETC., WHERE REQUIRED FOR SUPPORT OF EXISTING ELEMENTS OF CONSTRUCTION TO REMAIN IN SAFE, COMPETENT MANNER, IN CONFORMANCE WITH ALL LAWS, CODES ORDINANCES, RULES AND REGULATIONS BEARING ON THE WORK.
7. DEMOLITION OF ALL PORTIONS OF THE STRUCTURE TO BE REMOVED SHALL BE DONE WITH UTMOST CARE, USING TOOLS AND METHODS SUBJECT TO OWNER'S APPROVAL. ALL POSSIBLE CARE SHALL BE TAKEN TO AVOID DAMAGING, SHOCK OR VIBRATION TO PORTIONS OF EXISTING STRUCTURE TO REMAIN.
8. THE CONTRACTOR SHALL VERIFY THE EXISTENCE, LOCATION AND ELEVATION OF EXISTING SEWERS, DRAINS, ETC. IN DEMOLITION AREAS BEFORE PROCEEDING WITH THE WORK, ALL
DISCREPANCIES SHALL BE DOCUMENTED AND REPORTED TO THE ARCHITECT.
9. SAW CUT & REMOVE EXISTING CONCRETE SLAB FOR PLACEMENT OF PLUMBING WORK, FOUNDATIONS, STRUCTURAL STEEL, NECESSARY CAPPING OF EXISTING LINES AND FOUNDATION WORK, ETC. COORDINATE WITH STRUCTURAL ENGINEER AND ARCHITECT.
10. REMOVE AND RELOCATE MECHANICAL AND ELECTRICAL ITEMS, INCLUDING PIPING, FIXTURES, EQUIPMENT, DUCTWORK, WIRING DEVICES, PANELS AND ACCESSORIES AS REQUIRED. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS FOR MECHANICAL AND ELECTRICAL DEMOLITION.
11. REMOVE, ABANDON AND/OR CAP EXISTING PLUMBING AS REQUIRED TO FACILITATE THE WORK, V.I.F..
12. ALL EXISTING MATERIALS INDICATED TO REMAIN SHALL BE REPAIRED TO MATCH EXISTING. MATERIALS BEYOND REPAIR SHALL BE REPLACED TO MATCH EXISTING.
13. REMOVE AND REPLACE ALL EXISTING CONSTRUCTION AS INDICATED ON THE DEMOLITION PLANS OR OTHERWISE INDICATED IN ORDER TO FACILITATE THE NEW WORK.
14. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR SPECIFIC TRADE RELATED DEMOLITION WORK.
15. REFER TO DEMOLITION, IN THE SPECIFICATIONS FOR FURTHER INFORMATION PRIOR TO THE START OF DEMOLITION.
DEMOLITION NOTES
1. ALL DIMENSIONS ARE TO FACE OF
STUDS/ SHEATHING/
MASONRY/CONCRETE, CENTERLINE OF
OPENINGS FOR DOORS AND WINDOWS
IN STUD CONSTRUCTION (FACE OF
OPENING WHEN LOCATED IN
MASONRY/CONCRETE). DO NOT SCALE
DRAWINGS.
ALL EXISTING CONSTRUCTION
DIMENSIONS ARE TO FACE OF
EXISTING GYP. BD. U.N.O., V.I.F.
2. VERIFY SIZE AND LOCATION OF
MECHANICAL AND ELECTRICAL
EQUIPMENT, PADS, PENETRATIONS
AND SUPPORTS WITH MECHANICAL
AND ELECTRICAL DRAWINGS.
3. SLOPE FLOORS TO DRAINS AT 1/8" PER
FOOT MINIMUM WHILE KEEPING FLOOR
LEVEL AT WALL BASE CONDITION. (DO
NOT EXCEED 2% SLOPE IN ANY
DIRECTION). REFER TO STRUCTURAL
FOR ADDITIONAL INFORMATION.
4. COORDINATE ALL UTILITY LOCATIONS
WITH CIVIL, PLUMBING AND
ELECTRICAL DRAWINGS.
5. PATCH AND REPAIR ALL EXISTING
CONSTRUCTION DAMAGED AS A
RESULT OF NEW WORK/DEMOLITION
TO MATCH EXISTING CONDITIONS,
U.N.O.
6. REFER TO SHEET CS-002 FOR ANY
MOUNTING HEIGHTS.
7. REFER TO SPECIFICATIONS MANUAL
FOR ADDITIONAL INFORMATION.
GENERAL FLOOR
PLAN NOTES
1. THIS PLAN IS INTENDED TO SHOW
GENERAL COORDINATION OF
OVERHEAD WORK. REFER TO
STRUCTURAL, PLUMBING &
ELECTRICAL DRAWINGS FOR FURTHER
INFORMATION.
2. FANS TO BE LOCATED AT SAME
ELEVATION AS EXISTING FANS.
3. REFER TO SPECIFICATIONS MANUAL
FOR ADDITIONAL INFORMATION.
GEN. CEILING NOTES
SCALE:
N
REFECTED CEILING PLAN
1/8"=1'-0"
M
IC
H
IG
AN
D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
ST
AT
E O
F M
IC
H
IG
AN
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2024
AT
LA
N
TA
G
AR
AG
E
IN
-G
R O
U N
D H
O
IS
T R
EP
LA
C
EM
EN
T
AT
LA
N
TA
, M
IC
H
IG
AN
BBG
G D
S, G
G G
G
.0 6.
1/
0.
R
LO
.4 .2
SCALE:
N
HOIST PIT PLAN
1/8"=1'-0"
NEW CEILING FANREMOVE / DISCARD
EXSITING FAN
EXISTING MONORAIL
BEAM HALF AND HOIST
MOTOR TO REMAIN
CUT AND REMOVE
EXIST. MONORAIL
EXIST. BOLLARDS
EXIST. DRAIN PIT
JACKING
BEAM PIT
EDGE OF NEW
CONC. SLAB
2" CONC. CONSOLE PAD
SCALE:
N
CONSOLE PAD PLAN
1/4"=1'-0"
EXISTING FAN TO
BE REPLACED
WITH NEW FAN
SEE STRUCT. FOR
END STOP LOCATION
EXIST. OH DOORS
2" CONC. PAD - SEE
STRUCTURAL DWGS.
AREA OF
CONC. CUT
EXIST. TO
REMAIN
SCALE:
N
DEMOLITION PLAN
1/8"=1'-0"
EXISTING CONC. SLAB
TO BE DEMOLISHED
(800 SQ. FT.)
EXISTING BOLLARDS
TO REMAIN
EDGE OF NEW CONC. SLAB
D
EM
O
LI
TI
O
N P
LA
N
, P
LA
N , E
N
LA
R G
ED
P
LA
N
, R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
A-
EXISTING CONC. SLAB TO
BE CUT FOR DRAIN LINE
FLOOR DRAINS
EX. BOLL.
CONC. SLAB INFILL
EXIST. DRAIN PIT
1 Addendum #1 http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com AutoCAD SHX Text
TUEBOR
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text
KAB
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text U
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text U
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
FINAL RECORD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
INDEX CODE
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
IDENTIFICATION NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
AutoCAD SHX Text
FACILITIES AND BUSINESS SERVICES ADMINISTRATION
AutoCAD SHX Text
ADAM LACH, DIRECTOR
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text C
2' -5
/2
3'
-9
2' -5
/2
31'-0 1/2" PIT
29'-6 1/2" PLATFORM
26'-2 5/8" BASE-PLATE SPACING
BE
TW
EE
N
PL
AT
FO
R
M S
PL
AT
FO
R
M D
IM
P3 P4
P1 P2
PL
AT
FO
R
M D
IM
JACKING BEAM PIT
9' -0
C
O N
C R
ET
E
PI
T
CONTROL CONSOLE
SKYLIFT PLAN
REVISIONS
SHEET OF
PROJECT:
DESCRIPTION:
APPROVED BY:
SIGNATURE:
PRINT NAME:
DATE:
DRAWN BY
STERTIL-KONI USA, INC.
200 LOG CANOE CIRCLE, STEVENSVILLE, MD 21666
TEL. 800-336-6637
NOT FOR CONSTRUCTION
LIFT INSTALLER:
CHECKED BY
NOT TO SCALE
P01 SKU-2025-1030A-ADM-P00 11/5/2025ADM
1 6
ADM
TMK
10/30/2025
10/30/2025
MDOT Atlanta, MI
Kessler Equipment
SKU-2025-1030A-ADM-P01
SKYLIFT 780-9 FM APC JB
with Automatic Pit Covers
2' -9
/2
3'
-5
2' -9
/2
9' -0
C
O N
C R
ET
E
PI
T
9 3/4" 9 3/4"
31'-0 1/2" PIT
26'-2 5/8" BASE-PLATE SPACING
2' -4
/4
2'
-4
/4
4 CHEMICAL ANCHORS
PER BASE-PLATE
2 ADDITIONAL ANCHORING
HOLES PER BASE-PLATE FOR
ANCHORING IN COMPLIANCE
W/ SEISMIC REQUIREMENTS
4" SCH. 40 PVC CHASE FOR
HYDRAULIC & AIR LINES (BY OTHERS)
3/4" RIGID METAL CONDUIT TYP.
FOR INTRINSICALLY SAFE AND
LOW-VOLT WIRING (BY OTHERS)
ELECTRICAL LINE SIDE SUPPLY TO
CONTROL CONSOLE INCLUDING
3 PHASE 208/230/460/575 VOLT
50/50/25/20 AMP (BY OTHERS)
PNEUMATIC LINE SIDE SUPPLY
70-140 PSI, 5CFM TO INCLUDE
FILTER, REGULATOR, LUBRICATOR
(BY OTHERS)
2'-6" 8"
JACKING BEAM PIT
REVISIONS
SHEET OF
PROJECT:
DESCRIPTION:
APPROVED BY:
SIGNATURE:
PRINT NAME:
DATE:
DRAWN BY
STERTIL-KONI USA, INC.
200 LOG CANOE CIRCLE, STEVENSVILLE, MD 21666
TEL. 800-336-6637
NOT FOR CONSTRUCTION
LIFT INSTALLER:
CHECKED BY
NOT TO SCALE
CONCRETE & CONDUIT PLAN
NOTE: PITS ARE DIMENSIONED TO
ACCOMMODATE AUTOMATIC PIT COVERS
2 6
ADM
TMK
10/30/2025
10/30/2025
MDOT Atlanta, MI
Kessler Equipment
SKU-2025-1030A-ADM-P01
SKYLIFT 780-9 FM APC JB
with Automatic Pit Covers
SKU-2025-1030A-ADM-P00P01 11/5/2025ADM
M
IC
H
IG
AN
D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
ST
AT
E O
F M
IC
H
IG
AN
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2024
AT
LA
N
TA
G
AR
AG
E
IN
-G
R O
U N
D H
O
IS
T R
EP
LA
C
EM
EN
T
AT
LA
N
TA
, M
IC
H
IG
AN
BBG
G D
S, G
G G
G
.0 6.
1/
0.
R
LO
.4 .2
LI
FT
IN
ST
AL
L
PL
AN
S, C
ER
TI
FI
C
AT
IO
N
A-
1 Addendum #1
AutoCAD SHX Text
TUEBOR
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text
KAB
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text U
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text U
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
FINAL RECORD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
INDEX CODE
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
IDENTIFICATION NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
AutoCAD SHX Text
FACILITIES AND BUSINESS SERVICES ADMINISTRATION
AutoCAD SHX Text
ADAM LACH, DIRECTOR
AutoCAD SHX Text
SHEET TITLE:
C
11"
2 1/2" TYP.
1' -4
/4
PI
T D
EP
TH
2" TYP.
#4 @ 12" O.C.
(TYP.)
EPOXY COATED #5 REINFORCING STL.
DOWEL 18" LONG @ 1'-6" O.C. w/ SLIP
SLEEVE EACH SIDE @ MID-DEPTH OF SLAB -
9" EMBED w/ EPOXY ADHESIVE
NEW CONCRETE SLAB w/ 6x6 W2.9xW2.9
WWF TO MATCH EXISTING SLAB THICKNESS
NEW PIT DETAIL
SCALE: 3/4" = 1'-0"
A S-1
MINIMUM 6" GRANULAR FILL
COMPACTED TO 95% DENSITY.
(TYP.)
EXISTING 8 12" THICK
CONCRETE SLAB APRON
NEW 8" THICK CONCRETE
SLAB w/ #4 @ 8" O.C. B/W
(MID)
EMBED STEEL PLATE 14"x9"x37 12" w/ 3 8"Ø x 4" HEADED STUD
STAGGERED @ 24" O.C.
INSIDE FACE OF CMU3'-0 1/2"
CONTINUOUS HOT-DIPPED GALVANIZED 2"x2"x1 4"
NOSING w/ 3 8"Ø x 4" HEADED STUD @ 24" O.C.
#5x1'-6" @ 1'-6" O.C. DRILLED, DOWELED
AND EPOXY GROUTED TO EXISTING SLAB -
9" MIN. EMBED.
CONTINUOUS 2"x2"x1
4" NOSING
w/ 3 8"Ø x 4" HEADED STUD @ 24" O.C.
9"
1' -4
/4
PI
T D
EP
TH
#4 @ 8" O.C.
(MID) (TYP.)
EPOXY COATED #5 REINFORCING STL. DOWEL 12"
LONG @ 1'-6" O.C. w/ SLIP SLEEVE - 6" EMBED w/
EPOXY ADHESIVE @ MID-DEPTH OF SLAB.
NEW 6" THICK CONCRETE SLAB
w/ 6x6 W2.9xW2.9 WWF
MATCH EXISTING SLAB SLOPE
(TYP.)
NEW 8" THICK CONCRETE
SLAB w/ #4 @ 8" O.C. B/W
(MID)
NEW PIT DETAIL
SCALE: 3/4" = 1'-0"
B S-1
CONTINUOUS HOT-DIPPED GALVANIZED
2"x2"x1
4" NOSING w/ 3 8"Ø x 4" HEADED
STUD @ 24" O.C.
#5x1'-6" @ 1'-6" O.C. DRILLED, DOWELED
AND EPOXY GROUTED TO EXISTING SLAB -
MIN. 9" EMBED.
EXISTING 6" THICK
CONCRETE SLAB
9" 2'-9 1/2"
NEW HOIST PIT
MINIMUM 6" GRANULAR FILL
COMPACTED TO 95% DENSITY.
(TYP.)DETAIL SYMMETRICAL
ABOUT CENTERLINE
#4 @ 24" O.C.
12"
12"
#5x1'-6" @ 1'-6" O.C. DRILL, DOWEL AND
EPOXY GROUT TO EXISTING SLAB -
MIN. 9" EMBED. (TYP.)
EXISTING 6" THICK
CONCRETE SLAB
(TYP.)
SLAB JOINT AT NEW CONSTRUCTION
SCALE: 3/4" = 1'-0"
NEW 6" THICK CONCRETE
SLAB w/ 6x6 W2.9xW2.9 WWF
THICKNESS AND SLOPE TO
MATCH EXISTING
SCALE:
N
EXISTING FLOOR PLAN - NEW WORK
1/8" = 1'-0"
EXISTING MAINTENANCE GARAGE
EXISTING OFFICE AREA
EXISTING A&E SHOP
SAWCUT AND REMOVE AREA OF EXISTING CONCRETE SLAB AS
INDICATED TO INSTALL NEW LIFT PIT AND CONTROL CONDUITS.
EXISTING BOLLARDS TO REMAIN.
M
IC
H
IG
AN
D
EP
AR
TM
EN
T O
F
TR
AN
SP
O R
TA
TI
O N
ST
AT
E O
F M
IC
H
IG
AN
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF
SIDOCK GROUP, INC. AND CANNOT BE REPRODUCED,
COPIED, OR USED IN ANY MANNER WITHOUT THE PRIOR
WRITTEN CONSENT OF SIDOCK GROUP, INC. 2025
AT
LA
N
TA
G
AR
AG
E
IN
-G
R O
U N
D H
O
IS
T R
EP
LA
C
EM
EN
T
AT
LA
N
TA
, M
IC
H
IG
AN
SCALE:
N
S-1
1 LARGE SCALE PIT PLAN
1/4" = 1'-0"
'-0
/2
5'
-0
(H O
LD
S-1
S-1 A
S-1 B
(TYP.)
S-1 A
(SIM.)
(TYP.)
S-1 B
(TYP.)
8"
2' -6
NEW LIFT CONTROL CONSOLE
AND CONDUITS BELOW PIT
PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
20'-0" V.I.F.
'-0
V.
I.F
EXTERIOR DOOR
PROVIDE NEW 2"H. CONCRETE
HOUSEKEEPING PAD AT
CONSOLE LOCATION.
COORDINATE DIMS. W/ MEP.
2'-9 1/2"2'-9 1/2" 3'-5"
EXTERIOR DOOR/PIT
INSTALL NEW LIFT PIT AND CONTROL
CONDUITS. BACKFILL DISTURBED
SUB-BASE w/ GRANULAR FILL AND
COMPACT TO 95% DENSITY. POUR NEW
6" CONCRETE SLAB INFILL DRILL, DOWEL
AND EPOXY GROUT TO EXISTING SLAB w/ #5x1'-6" @ 1'-6" O.C. - MIN. 9" EMBED. -
REFER TO DETAILS.
1' -7
1'
-1 0"
2'-9"
NEW LIFT ELECTRICAL CONDUITS DN. TO
UNGD. - COORDINATE w/ ELECTRICAL TRADES
EDGE OF EXISTING SLAB
(TYP.)
EXISTING DRAIN PIT
19 59 1/
0.
R
LO
S-
S
TR
U
C
TU
R
AL
P
LA
N S
AN
D
D
ET
AI
LS
KG EA BB
.0
5.
.0
5.
EA
EX
IS
TI
N
G C
O N
ST
R
U C
TI
O
N J
O
IN
T
EX
IS
TI
N
G C
O N
ST
R
U C
TI
O
N J
O
IN
T
*SAWCUT EXISTING CONCRETE SLAB FOR NEW DRAIN PIPES.
COORDINATE WITH MECHANICAL TRADES.
H .P
. O F
EX
IS
TI
N
G S
LA
B
AutoCAD SHX Text 2"x2"x "
AutoCAD SHX Text 2"x2"x " NOSING
AutoCAD SHX Text 2"x2"x " NOSING w/ " x 4" HEADED
AutoCAD SHX Text
NEW HOIST PIT
AutoCAD SHX Text
TUEBOR
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text
KAB
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text U
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text U
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text
PRELIMINARY
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
FINAL RECORD
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
INDEX CODE
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
IDENTIFICATION NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
AutoCAD SHX Text
FACILITIES AND BUSINESS SERVICES ADMINISTRATION
AutoCAD SHX Text
ADAM LACH, DIRECTOR
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text C
AutoCAD SHX Text
EXTERIOR DOOR
EXTERIOR DOOR/PIT
3' -9
2'
-5
/2
2' -5
/2
31'-0 1/2" PIT
29'-6 1/2" PLATFORM
26'-2 5/8" BASE-PLATE SPACING
BE
TW
EE
N
PL
AT
FO
R
M S
PL
AT
FO
R
M D
IM
P3 P4
P1 P2
PL
AT
FO
R
M D
IM
JACKING BEAM PIT
9' -0
C
O N
C R
ET
E
PI
T
CONTROL CONSOLE
SKYLIFT PLAN
REVISIONS
SHEET OF
PROJECT:
DESCRIPTION:
APPROVED BY:
SIGNATURE:
PRINT NAME:
DATE:
DRAWN BY
STERTIL-KONI USA, INC.
200 LOG CANOE CIRCLE, STEVENSVILLE, MD 21666
TEL. 800-336-6637
NOT FOR CONSTRUCTION
LIFT INSTALLER:
CHECKED BY
NOT TO SCALE
SKU-2025-1030A-ADM-P00P01 11/5/2025 ADM
1 6
ADM
TMK
10/30/2025
10/30/2025
MDOT Atlanta, MI
Kessler Equipment
SKU-2025-1030A-ADM-P01
SKYLIFT 780-9 FM APC JB
with Automatic Pit Covers
PRELIMINARY
2' -9
/2
3'
-5
2' -9
/2
9' -0
C
O N
C R
ET
E
PI
T
9 3/4"9 3/4"
31'-0 1/2" PIT
26'-2 5/8" BASE-PLATE SPACING
2' -4
/4
2'
-4
/4
4 CHEMICAL ANCHORS
PER BASE-PLATE
2 ADDITIONAL ANCHORING
HOLES PER BASE-PLATE FOR
ANCHORING IN COMPLIANCE
W/ SEISMIC REQUIREMENTS
4" SCH. 40 PVC CHASE FOR
HYDRAULIC & AIR LINES (BY OTHERS)
3/4" RIGID METAL CONDUIT TYP.
FOR INTRINSICALLY SAFE AND
LOW-VOLT WIRING (BY OTHERS)
ELECTRICAL LINE SIDE SUPPLY TO
CONTROL CONSOLE INCLUDING
3 PHASE 208/230/460/575 VOLT
50/50/25/20 AMP (BY OTHERS)
PNEUMATIC LINE SIDE SUPPLY
70-140 PSI, 5CFM TO INCLUDE
FILTER, REGULATOR, LUBRICATOR
(BY OTHERS)
8"2'-6"
JACKING BEAM PIT
REVISIONS
SHEET OF
PROJECT:
DESCRIPTION:
APPROVED BY:
SIGNATURE:
PRINT NAME:
DATE:
DRAWN BY
STERTIL-KONI USA, INC.
200 LOG CANOE CIRCLE, STEVENSVILLE, MD 21666
TEL. 800-336-6637
NOT FOR CONSTRUCTION
LIFT INSTALLER:
CHECKED BY
NOT TO SCALE
CONCRETE & CONDUIT PLAN
NOTE: PITS ARE DIMENSIONED TO
ACCOMMODATE AUTOMATIC PIT COVERS
2 6
ADM
TMK
10/30/2025
10/30/2025
MDOT Atlanta, MI
Kessler Equipment
SKU-2025-1030A-ADM-P01
SKYLIFT 780-9 FM APC JB
with Automatic Pit Covers
SKU-2025-1030A-ADM-P00P01 11/5/2025 ADM
CONTINUOUS NOSING ANGLE
2"X 2"X 1/4" WITH SHEAR ANCHORS
SPACED 24" O.C. MIN. SHEAR
ANCHORS: 1/2"Ø SHEAR STUD OR
1/4" BENT PLATE X 1" X 4" (BY OTHERS)
SECTION THROUGH PIT WALL
EMBEDDED STEEL PLATE
1/4" X 9" X 37 1/2"
WITH SHEAR ANCHORS
(BY OTHERS)
29'-6 1/2" PLATFORM
RETRACTED VIEW
EXTENDED VIEW
1/2" MAX. CAMBER
DEFLECTION ON PLATFORM
1'-4 1/4" PIT DEPTH
REINFORCED CONCRETE
MIN. 6" THICK, #4 BAR, 12" O.C.
BOTH WAYS (NOT SHOWN)
REVISIONS
SHEET OF
PROJECT:
DESCRIPTION:
APPROVED BY:
SIGNATURE:
PRINT NAME:
DATE:
DRAWN BY
STERTIL-KONI USA, INC.
200 LOG CANOE CIRCLE, STEVENSVILLE, MD 21666
TEL. 800-336-6637
NOT FOR CONSTRUCTION
LIFT INSTALLER:
CHECKED BY
NOT TO SCALE
ELEVATION
3 6
ADM
TMK
10/30/2025
10/30/2025
MDOT Atlanta, MI
Kessler Equipment
SKU-2025-1030A-ADM-P01
SKYLIFT 780-9 FM APC JB
with Automatic Pit Covers
3'-5"
2'-5 1/2" 3'-9" 2'-5 1/2"
9'-0"
CONCRETE PIT
2'-9 1/2"
PIT WIDTH
2'-9 1/2"
PIT WIDTH
PLATFORMS 5'
-9
1'-4 1/4" PIT DEPTH
1'-3 3/4" LIFT RETRACTED
SHIMMING AS NEEDED
FOR FLUSH LAYOUT
CONTINUOUS NOSING ANGLE
2" X 2" X 1/4" WITH SHEAR ANCHORS
(BY OTHERS)
REVISIONS
SHEET OF
PROJECT:
DESCRIPTION:
APPROVED BY:
SIGNATURE:
PRINT NAME:
DATE:
DRAWN BY
STERTIL-KONI USA, INC.
200 LOG CANOE CIRCLE, STEVENSVILLE, MD 21666
TEL. 800-336-6637
NOT FOR CONSTRUCTION
LIFT INSTALLER:
CHECKED BY
NOT TO SCALE
SECTION
NOTE: PITS ARE DIMENSIONED TO
ACCOMMODATE AUTOMATIC PIT COVERS
4 6
ADM
TMK
10/30/2025
10/30/2025
MDOT Atlanta, MI
Kessler Equipment
SKU-2025-1030A-ADM-P01
SKYLIFT 780-9 FM APC JB
with Automatic Pit Covers
AIR & ELECTRICAL SERVICES AT CONSOLE
LOCATE CONDUITS IN
16" x 5 1/2" HATCHED
TARGET AREA
1/
2"
INTERNAL CONDUITS
16"
FRONTFRONT
/4
CONTROL CONSOLE
20 1/4"
/4
FRONT
4" SCH. 40 PVC CHASE, TRIM TO 3"
ABOVE FINISHED FLOOR
(BY OTHERS)
ISOMETRIC VIEW OF CONDUITS
AT CONTROL CONSOLE
3/4" RIGID METAL CONDUIT, CONTINUOUS
PIPE 18" ABOVE FINISHED FLOOR. INCLUDE
SEAL-OFF TO MEET LOCAL REQUIREMENTS.
(BY OTHERS)
RIGID METAL CONDUIT FOR
ELECTRIC LINE SIDE SUPPLY,
INCLUDE SEAL-OFF TO MEET LOCAL
REQUIREMENTS. (BY OTHERS)
CONDUIT CHASE OR PIPE FOR
COMPRESSED AIR SUPPLY
(BY OTHERS)
FLOOR
FILTER/REGULATOR/LUBRICATOR
MOUNT SECURELY TO WALL, IN
ACCESSIBLE LOCATION. (BY OTHERS)
DISCONNECT, CONDUIT
& CONDUCTORS
(BY OTHERS)
FRONT
SHUT-OFF VALVE
(BY OTHERS)
CONNECT NEW ELECTRIC AND
COMPRESSED AIR TO CONTROL
CONSOLE AS REQUIRED
(BY OTHERS)
LIFT CONTROL CONSOLE
COMPRESSED AIR PIPING
(BY OTHERS)
PNEUMATIC LINE SIDE SUPPLY
70-140 PSI, 5CFM
(BY OTHERS)
AIR & ELECTRICAL SERVICES AT CONSOLE
ELECTRICAL LINE SIDE SUPPLY TO
CONTROL CONSOLE INCLUDING
3 PHASE 208/230/460/575 VOLT
50/50/25/20 AMP (BY OTHERS)
REVISIONS
SHEET OF
PROJECT:
DESCRIPTION:
APPROVED BY:
SIGNATURE:
PRINT NAME:
DATE:
DRAWN BY
STERTIL-KONI USA, INC.
200 LOG CANOE CIRCLE, STEVENSVILLE, MD 21666
TEL. 800-336-6637
NOT FOR CONSTRUCTION
LIFT INSTALLER:
CHECKED BY
NOT TO SCALE
ebright CONTROL CONSOLE DETAILS
5 6
ADM
TMK
10/30/2025
10/30/2025
MDOT Atlanta, MI
Kessler Equipment
SKU-2025-1030A-ADM-P01
SKYLIFT 780-9 FM APC JB
with Automatic Pit Covers
4"
6"
3"
4"
3"
4"
6"
3"
4"
3"
P1 P2
4" SCH. 40 PVC
CHASE CONDUIT
3/4" RIGID METAL
CONDUIT TYP. FOR
INTRINSICALLY SAFE
AND LOW-VOLT
WIRING
4" SCH. 40 PVC
CHASE CONDUIT
REVISIONS
SHEET OF
PROJECT:
DESCRIPTION:
APPROVED BY:
SIGNATURE:
PRINT NAME:
DATE:
DRAWN BY
STERTIL-KONI USA, INC.
200 LOG CANOE CIRCLE, STEVENSVILLE, MD 21666
TEL. 800-336-6637
NOT FOR CONSTRUCTION
LIFT INSTALLER:
CHECKED BY
NOT TO SCALE
CONDUIT DETAILS AT BASEPLATE
6 6
ADM
TMK
10/30/2025
10/30/2025
MDOT Atlanta, MI
Kessler Equipment
SKU-2025-1030A-ADM-P01
SKYLIFT 780-9 FM APC JB
with Automatic Pit Covers
| 591.25100.RLO_MDOT Atlanta Garage Hoist_Addendum #1.pdf |
| Sheets A-1 and A-2.pdf |
| A-1.pdf |
| Sheets and Views |
| A-1 |
| A-2.pdf |
| Sheets and Views |
| A-2 |
| S-1.pdf |
| Sheets and Views |
| S-1 |
| MDOT Atlanta, MI, SKYLIFT 780-9 FM APC JB P01.pdf |
| Sheets and Views |
| MDOT Atlanta, MI, SKYLIFT 780-9 FM APC JB P01-Sheet 1 |
| MDOT Atlanta, MI, SKYLIFT 780-9 FM APC JB P01-Sheet 2 |
| MDOT Atlanta, MI, SKYLIFT 780-9 FM APC JB P01-Sheet 3 |
| MDOT Atlanta, MI, SKYLIFT 780-9 FM APC JB P01-Sheet 4 |
| MDOT Atlanta, MI, SKYLIFT 780-9 FM APC JB P01-Sheet 5 |
| MDOT Atlanta, MI, SKYLIFT 780-9 FM APC JB P01-Sheet 6 |
Sensor Connection.pdf
File details come from the government source that posted it. Updated .