Addendum 1_24309 LudingtonWellShelter.pdf
PDF 389 KB Posted
- Solicitation number
- RFQ 171 260000000270 2
- Issued by
- Macomb County, Livonia City, Michigan
About this file
This is Construction Bid Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design & Construction Division for the Ludington State Park Well Shelter Repairs project (File No. 751/24309.HJD). The addendum, issued on May 14, 2026, provides clarifications and modifications to the bidding documents for this construction project. A pre-bid meeting was held prior to the addendum issuance, with an attendance record attached to the document. The bid opening date is scheduled for May 20, 2026. A critical constraint noted in the addendum is that on-site construction work may not commence before September 20, 2026, establishing the earliest project start date for selected contractors.
The addendum was prepared by the professional firm Wiss Janey Elstner, with Project Director Heather DeKorte overseeing the document. All bidders are required to acknowledge receipt and understanding of this addendum in their bid submission; failure to do so may result in bid rejection. This addendum becomes an integral part of the contract documents and supersedes any conflicting provisions in the original bidding documents. Bidders should access additional information and documents through www.michigan.gov/SIGMAVSS, the state's official procurement portal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
5/14/2026
PROJECT NAME
Ludington State Park - Well Shelter Repairs
FILE NUMBER
751/24309.HJD
PROFESSIONAL
Wiss Janey Elstner
PROJECT DIRECTOR
Heather DeKorte
BID OPENING DATE:
5/20/2026
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Pre-Bid meeting attendance record is attached to this addendum.
2. On-site construction work may not begin before September 20, 2026.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Ross Smith, Wiss Janey Elstner DATE: 5/13/2026
APPROVED BY:
PROJECT DIRECTOR: Heather DeKorte DATE: 5/13/2026 http://www.michigan.gov/SIGMAVSS
File details come from the government source that posted it. Updated .