Addendum 1 21301.pdf
PDF 4 MB Posted
- Solicitation number
- RFQ 171 220000000305 3
- Issued by
- Arenac County, Michigan
About this file
This is an addendum to a Video Management System Upgrade Phase 1 project issued by the Michigan Department of Technology, Management and Budget, Facilities and Business Services Administration, Design and Construction Division for the Baraga Correctional Facility located at 13924 Wadanga Road in Baraga, Michigan. The project involves the design and installation of a comprehensive video management system upgrade with network infrastructure, including new Ethernet switches, servers, cameras, and associated equipment at a correctional facility. The addendum, issued May 5, 2022, incorporates 26 clarifications and answers to bidder questions, revised drawings for camera one-line diagrams (TC101, TC110, TC111, TC112, TC114), supplementary conditions (Section 0800), and updates to specifications. The bid due date is May 11, 2022 at 2:00 PM local time. A pre-bid conference and facility walk-through was scheduled for April 28, 2022 at 9:00 AM with early arrival required for COVID-19 testing. The question submission deadline was May 4, 2022 at 3:00 PM, with the final addendum issued May 6, 2022. The pre-construction meeting was scheduled for the week of June 27, 2022. The project spreadsheet lists 150 existing cameras across multiple facility locations that will be integrated into the new system.
Key project requirements include a site superintendent who must be an employee of the prime contractor and present on-site during all work. Contractors are restricted to Monday through Friday work hours from 8:00 AM to 4:00 PM. A preliminary construction schedule must include crew size, number of crews, days per week on-site, and switchover dates and times. Progress meetings will be held a minimum of twice monthly, with substantial completion, final completion, and an 11-month post-construction meeting required. Contractors must provide spare parts lists for all devices and equipment with descriptions, manufacturers, and part numbers. A project-specific COVID-19 Preparedness and Response Plan complying with federal and state requirements must be submitted and approved prior to onsite work. Lien clearance must be completed and submitted before April 25, 2022, or contractors will be denied facility access. The contract requires daily reporting and contractor-furnished lighting for work performance. Allowances are structured as provisional allowances as defined in specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans 3 of 4 21301.pdf | ||
| Plans 4 of 4 21301.pdf | ||
| LEIN form 21301.pdf | ||
| Addendum 2 21301.pdf | ||
| Plans 2 of 4 21301.pdf | ||
| Specification 21301.pdf | ||
| Plans 1 of 4 21301.pdf | ||
| Advertisement 21301.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
472_21301_JBB_Baraga VMS Phase 1_Addendum 01 1
PROJECT ADDENDUM #1
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
FACILITIES AND BUSINESS SERVICES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
To Design and Construction Division Date: May 5, 2022
From Jeff Barsch Project Manager
Jeff Barsch
File # 472/23301.JBB Funding Code
472AMFMaintProj Bid Due Date
May 11, 2022 @ 2:00pm Local Time
Project Name:
Video Management System Upgrade – Phase 1 PSC: Commtech Design
Facility: Baraga Correctional Facility 13924 Wadanga Road Baraga, MI 49908
The Following Changes, revisions, modifications, etc. shall be incorporated into the contract documents, specifications and plans
Attachments;
1. Meeting Attendance record, Pre-Bid sign-in sheets.
2. Existing Camera spreadsheet.
3. Section 800 Supplementary Conditions
Drawings reissued
1. TC101 – Schedules, Legends and Details.
a. See revised product model number for “CA”, “CC” & “CE”.
2. TC110 – Camera One Line Diagrams.
a. Drawing reissued for question #22.
3. TC111 – Camera One Line Diagrams.
a. Drawing reissued for question #4, and #19, #20 & #21.
4. TC112 Camera – One Line Diagrams.
a. Drawing reissued for question #4.
5. TC114 – Camera One Line Diagrams.
a. Drawing reissued for new camera is Support Services/Kosher Room.
6. TC303 – 300 Building Education.
a. Added a data cable and workstation as shown on drawings.
7. TC320 – 200 Building Support Services.
a. Added a 360 “CC” camera to the Kosher Room
472_21301_JBB_Baraga VMS Phase 1_Addendum 01 2
Clarification
1. Please plan to clarify the # of LARA permits that the contractor will be required to secure. For Building permits LARA will no longer consider a prison a campus and allow only one overarching permit, they require 1 permit per building. It should be confirmed if LARA Electrical will treat the site in a similar fashion so contractors can bid accordingly.
Answer. We have submitted the entire project as one submission and expect that it will be one electrical permit for the entire project
2. Spec section 023123 -2.1 Please add TriMedia Engineering as an eligible service provider. They have performed a lot of GPR for us on projects up here:
Headquarters 830 W Washington St Marquette, MI 49855
(906) 228-5125 https://trimediaee.com/
3. The Close of questions date of 5/4/22 at 3:00 pm as listed on the project advertisement is correct.
The close of questions date listed in Section 0800 is should be revised to reflect this date and time.
Specifications reissued;
1. Section 0800 Supplementary Conditions
Questions;
1. Assumption is that all switches listed in the one-lines, etc., and say "new" in the switch box, with either "NB" or "NC" in them will be required to be provided. Please verify assumption is correct.
Answer. Provide all new Ethernet Switches for the camera system
2. May we substitute Cisco 9300 copper for 9200 copper at head end in order to stack the entire set of 3? For what reason are we not stacking the 3 switches in the core/headend?
Answer. That is a good idea. See Change on TC110
3. Not seeing the laptop spec - similar to mini PC? Tower?
Answer. Yes. Similar to the Tower PC
4. Please specify camera models for the following: AMF-2202, AMF-2203, AMF-2303 and AMF- 2401.
Answer. See page TC111 & TC112. Camera model is CA WV-S2572L
5. 286200 1.02 C2 & 283600 2.02 C3a, firewall rules, routers, gateways and firewalls have been mentioned. Please provide: 1. any equipment/info related to existing routers, gateways and firewalls, and 2. if they are in use and must be configured/utilized in relation to this CCTV project.
Answer. There is an existing Fortinet router for use in connecting actual GPS time to all Servers and PC’s
6. 283600 2.02 C2a, to implement Active Directory, another server is required. Please clarify if
Active Directory is required as part of the RFQ Answer. Active Directory is not required to be implemented but the system shall be configured to allow its implementation in the future.
472_21301_JBB_Baraga VMS Phase 1_Addendum 01 3
7. 283600 2.02 C3a, please clarify what this item means; creating VLANS doesn't add any layers of security without additional firewalls and/or software. Additionally, VLANS are designed to limit broadcast traffic, not for security. This item is confusing - please clarify what you are trying to accomplish.
Answer. No further explanation is available.
8. 283600 2.02 C4b, "verifiable server certificates" expire every 2 years. Please clarify long term expectations for certificate management - for example, purchasing renewal certs and updating the certs. *SQL will cease to work if certificates expire - however self-signed certificates would not have this updating requirement.
Answer. The owner will be having systems updated regularly after warranty that is part of this project is expired.
9. 283600 2.03 4c, please expand upon and clarify what you mean by "storage locking".
Answer. No further explanation is available.
10. 283600 3.04 C9, are you asking for temporary Federation for this item? Cameras cannot exist simultaneously on 2 Genetec systems that are connected.
Answer. This is not two Genetec systems. It is one system that will be running and connected. The cameras will be moved from existing server to new server
11. 283600 3.04 E2, will staff or vendors for "other systems" be available for testing of network connectivity through the new switches? Additionally, who will be responsible to sign off on "other systems" testing?
Answer. The contractor is responsible for all this work and testing.
12. 283600 3.06 C6, Archiver Failure, from the verbiage it seems that you are expecting to spread failover among remaining servers; however, you called for a FO Archiver for the purpose of server failure. Please clarify method of Archiver failure failover.
Answer. Yes, that is confusing. The cameras shall failover to the failover archiver, not across other servers
13. 283600 3.06 B7d, more a question for after project is awarded: would like discussion regarding use of Google Earth over drawing of Site Map. How would cameras be placed accurately on a google map? This could be done if google map integration was purchased. This requires the system to connect to the internet.
Answer. This has been done previously with a PDF image of Google Earth. It can be done as part of this project
14. 283600 3.06 C6b, Threat Levels cannot be utilized to transfer cameras upon Archiver failure. Please clarify purpose/intention for Threat Levels.
Answer. Work with Genetec during configuration to determine if threat level should be used to trigger a change in recording status.
15. 283600 3.06 D, please share approximate quantity of users to assist with setting up custom views.
Answer. Ten
16. 286200 3.06 H, J, L, is there an expectation of internet, IP phones, and voice traffic on the new networks? If so, please expand/clarify.
472_21301_JBB_Baraga VMS Phase 1_Addendum 01 4
Answer. There is no expectation of IP Phones. There may be Audio distribution on the network.
17. 286200 3.06 K, Do you want to utilize Bonjour? Is the intent to restrict Bonjour? Please clarify and expand upon what is meant by "set up system to support and segment Bonjour traffic to ensure transmission of the video information".
Answer. Bonjour will not be utilized
18. Upon contract award, will templates of the different spreadsheets/documents required for closeout be provided?
Answer. Yes
19. Camera CA part # WV-S2571LN. This is not a valid part number. Please advise Answer. See TC101. Camera model is CA WV-S2572L
20. Camera CA part # WV-S2571LN. This is not a valid part number. Please advise.
Answer. See TC101. Camera model is CA WV-S2572L
21. Camera CC part # WS-S4576LM. This is a transit model camera. Just want to make sure that’s what you are looking for?
Answer. See TC101. Camera model is CC WV-S4576L
22. Camera CK has no part# and has not used in the camera equipment schedule. There is 1 CK camera on the prints. Please advise on the part# you are looking for.
Answer. See TC110. Camera model is WV-X871N
23. Print E-200 has 25 pair copper from the guard tower 1 to maintenance. How do you want this hooked up?
Answer. Terminate on 66 blocks at each end.
24. Prints TC 107 and TC108. Note #2, can you please explain what you are looking for?
Answer. WE believe this is about Note 2 which references the As-built layout 1 drawing. This instructs the contractor to provide as builts for the rack layouts.
25. In the section below: How may computers and devices are required to have the Genetec viewing software installed?
SECTION 281000 – TECHNOLOGY OVERVIEW
1.02 DESCRIPTION OF PROJECT
B. Video Security System
6. Install viewing software on owner’s computers and devices
Answer. The same quantity as Computers and Laptops that are being provided
26. Is it your intent to replace all existing Genetec servers with new severs?
Answer. Yes
Sincerely, Bret Emerson
472/21301.JBB - Barraga Correctional Facility - VMS - Current Cameras
Camera ID Camera Name Model
AMF-0401 0401 - ZONE 11-C WV-SFV631L
AMF-0402 0402 - ZONE 11-B WV-SFV631L
AMF-0403 0403 - ZONE 11-A WV-SFV631L
AMF-0404 0404 - ZONE 10-A WV-SFV631L
AMF-0405 0405 - ZONE 9-B WV-SFV631L
AMF-0406 0406 - ZONE 9-A WV-SFV631L
AMF-0407 0407 - ZONE 8-B WV-SW598
AMF-0408 0408 - ZONE 8-A WV-SFV631L
AMF-0409 0409 - ZONE 7-E WV-SFV631L
AMF-0410 0410 - ZONE 7-D WV-SFV631L
AMF-0411 0411 - ZONE 7-C WV-SW598
AMF-0412 0412 - ZONE 7-B WV-SFV631L
AMF-0413 0413 - ZONE 7-A WV-SFV631L
AMF-0414 0414 - ZONE 6-B WV-SFV631L
AMF-0415 0415 - ZONE 6-A WV-SFV631L
AMF-0416 0416 - ZONE 5-C WV-SFV631L
AMF-0417 0417 - ZONE 5-B WV-SFV631L
AMF-0418 0418 - ZONE 5-A WV-X6531
AMF-0419 0419 - ZONE 4-B WV-SFV631L
AMF-0420 0420 - ZONE 4-A WV-SFV631L
AMF-0421 0421 - ZONE 3-A WV-SFV631L
AMF-0422 0422 - ZONE 2-B WV-SFV631L
AMF-0423 0423 - ZONE 2-A WV-SFV631L
AMF-0424 0424 - ZONE 1-C WV-SW598
AMF-0425 0425 - ZONE 1-B WV-SFV631L
AMF-0426 0426 - ZONE 1-A WV-X6531
AMF-0604 0604 - ZONE 1 U8-1-B WV-SFV631L
AMF-0605 0605 - ZONE 1 U8-1-C WV-SFV631L
AMF-0606 0606 - ZONE 2 U8-2-A WV-SFV631L
AMF-0607 0607 - ZONE 2 U8-2-B WV-SFV631L
AMF-0608 0608 - ZONE 3 U8-3-A WV-SFV631L
AMF-0609 0609 - ZONE 3 U8-3-B WV-SFV631L
AMF-1100 1100 - Gate 10 WV-SFV631L
AMF-1110 1110 - Lobby 1 WV-SFR311
AMF-1111 1111 - Lobby 2 WV-SFR311
AMF-1112 1112 - Visit 1 WV-SFR311
AMF-1113 1113 - Visiting Room PTZ#1 NEZ-4212-CPxW4
AMF-1114 1114 - Gates 5,8,9 WV-SW458
AMF-1115 1115 - Control Center WV-SW458
AMF-1116 1116 - Entry Control WV-SW458
AMF-1117 1117 - Visiting Room 360#1 WV-SFV481
AMF-1118 1118 - Visiting Room 360#2 WV-SFV481
Baraga Existing Camera Name & Location
Baraga Existing Camera Name & Location
AMF-1119 1119 - Visiting Room PTZ#2 NEZ-4212-CPxW4
AMF-1200 1200 - FS Back Dock (OUTSIDE) WV-SFV631L
AMF-1201 1201 - Property Entry (OUTSIDE) WV-SFV631L
AMF-1202 1202 - Health Care Entry (OUTSIDE) WV-SFV631L
AMF-1203 1203 - FS Front Door PTZ (OUTSIDE) WV-SW598
AMF-1204 1204 - FS Side Door (OUTSIDE) WV-SFV631L
AMF-1210 1210 - FS Back Dock WV-SFR311
AMF-1211 1211 - Dish Tank 1 WV-SFR311
AMF-1212 1212 - Dish Tank 2 WV-SFR311
AMF-1213 1213 - Dining 1 WV-SW458
AMF-1214 1214 - Dining 2 WV-SW458
AMF-1215 1215 - Serving Line WV-SFR311
AMF-1216 1216 - Food Prep WV-SFR311
AMF-1217 1217 - Freezer WV-SFV631L
AMF-1218 1218 - FS Back Hallway WV-SFR311
AMF-1219 1219 - Kettle/Ovens WV-SFR311
AMF-1220 1220 - HC Lobby WV-SW458
AMF-1221 1221 - HC Hallway 1 WV-SFR311
AMF-1222 1222 - HC Hallway 2 WV-SFR311
AMF-1223 1223 - HC Hallway 3 WV-SFR311
AMF-1224 1224 - HC Hallway 4 WV-SFR311
AMF-1225 1225 - HC Hallway 5 WV-SFR311
AMF-1226 1226 - Commissary WV-SFR311
AMF-1227 1227 - Tool room/Hall Entry WV-SFR311
AMF-1228 1228 - Laundry/Storage WV-SW458
AMF-1300 1300 - Sallyport (PTZ) WV-X6531
AMF-1301 1301 - Zone 8/Back Doors WV-SFV631L
AMF-1302 1302 - 6 & 7 Walkway (OUTSIDE) WV-SFV631L
AMF-1303 1303 - Front (PTZ) WV-SW598
AMF-1304 1304 - Front Entry (OUTSIDE) WV-SFV631L
AMF-1305 1305 - Side Gym Door (OUTSIDE) WV-SFV631L
AMF-1310 1310 - Classroom 3 WV-SW158
AMF-1311 1311 - Chapel WV-SW158
AMF-1312 1312 - Classroom 2 WV-SW158
AMF-1313 1313 - Law Library WV-SW158
AMF-1314 1314 - Library 2 WV-SW158
AMF-1315 1315 - Classroom 1 WV-SW158
AMF-1316 1316 - Back Entry WV-SW458
AMF-1317 1317 - Gym WV-SW458
AMF-1318 1318 - Weight Room WV-SW158
AMF-1319 1319 - Library 1 WV-SW158
AMF-1320 1320 - Front Entry WV-SW458
Baraga Existing Camera Name & Location
AMF-1321 1321 - Gym 2 WV-SFR311
AMF-0601 1500 - Level I Zone 4-A WV-SFV631L
AMF-0602 1501 - Level I Access Road WV-SFV631L
AMF-0603 1502 - Level I Zone 4-B WV-SFV631L
AMF-1510 1510 - Warehouse WV-SFR311
AMF-2100 2100 - Yard WV-SFV631L
AMF-2101 2101 - Zone 2 & 3 (PTZ) WV-SW598
AMF-2102 2102 - Front Door WV-SFV631L
AMF-2103 2103 - Walkway WV-SFV631L
AMF-2110 2110 - A Front WV-SFR311
AMF-2111 2111 - A Back WV-SFR311
AMF-2112 2112 - OBS WV-SW158
AMF-2113 2113 - C Back WV-SFR311
AMF-2114 2114 - C Front WV-SFR311
AMF-2115 2115 - B Front WV-SFR311
AMF-2116 2116 - B Back WV-SFR311
AMF-2117 2117 - D Back WV-SFR311
AMF-2118 2118 - D Front WV-SFR311
AMF-2119 2119 - Commons A/B WV-SW458
AMF-2120 2120 - Commons C/D WV-SW458
AMF-2121 2121 - HU-1 Entry WV-SFR311
AMF-2122 2122 - HU-1 Laundry WV-SW458
AMF-2200 2200 - Yard WV-SFV631L
AMF-2201 2201 - Walkway 1 WV-SFV631L
AMF-2202 2202 - Walkway 2 WV-SFV631L
AMF-2203 2203 - Front Door WV-SFV631L
AMF-2210 2210 - A Front WV-SFR311
AMF-2211 2211 - A Back WV-SFR311
AMF-2212 2212 - OBS WV-SW158
AMF-2213 2213 - C Back WV-SFR311
AMF-2214 2214 - C Front WV-SFR311
AMF-2215 2215 - B Front WV-SFR311
AMF-2216 2216 - B Back WV-SFR311
AMF-2217 2217 - D Back WV-SFR311
AMF-2218 2218 - D Front WV-SFR311
AMF-2219 2219 - Commons A/B WV-SW458
AMF-2220 2220 - Commons C/D WV-SW458
AMF-2222 2222 - HU-2 Entry WV-SFR311
AMF-2223 2223 - HU-2 Laundry WV-SW458
AMF-2300 2300 - Zone 5 (PTZ) WV-SW598
AMF-2301 2301 - Yard WV-SFV631L
AMF-2302 2302 - Zones 4&5 (PTZ) WV-SW598
Baraga Existing Camera Name & Location
AMF-2303 2303 - Front Door (OUTSIDE) WV-SFV631L
AMF-2304 2304 - 2,3,4, & 5 Commons (PTZ) WV-SW598
AMF-2310 2310 - A Front WV-SFR311
AMF-2311 2311 - A Back WV-SFR311
AMF-2312 2312 - C Front WV-SFR311
AMF-2313 2313 - C Back WV-SFR311
AMF-2314 2314 - B Back WV-SFR311
AMF-2315 2315 - B Front WV-SFR311
AMF-2316 2316 - OBS WV-SW158
AMF-2317 2317 - D Back WV-SFR311
AMF-2318 2318 - D Front WV-SFR311
AMF-2319 2319 - Commons A/B WV-SW458
AMF-2320 2320 - Commons C/D WV-SW458
AMF-2321 2321 - HU-3 Laundry WV-SW458
AMF-2322 2322 - HU-3 Entry WV-SFR311
AMF-2400 2400 - Yard WV-SFV631L
AMF-2401 2401 - Front Door (OUTSIDE) WV-SFV631L
AMF-2402 2402 - Walkway WV-SFV631L
AMF-2410 2410 - A Front WV-SFR311
AMF-2411 2411 - A Back WV-SFR311
AMF-2412 2412 - C Back WV-SFR311
AMF-2413 2413 - C Front WV-SFR311
AMF-2414 2414 - B Front WV-SFR311
AMF-2415 2415 - B Back WV-SFR311
AMF-2416 2416 - D Back WV-SFR311
AMF-2417 2417 - D Front WV-SFR311
AMF-2418 2418 - Laundry WV-SW158
AMF-2419 2419 - Commons A/B WV-SW458
AMF-2420 2420 - Commons C/D WV-SW458
AMF-2421 2421 - Chow Hall WV-SW458
AMF-2423 2423 - HU-4 Yard PTZ SNP-5321H
AMF-2424 2424 - HU-4 Entry WV-SFR311
AMF-2500 2500 - Yard WV-SFV631L
AMF-2501 2501 - Walkway WV-SFV631L
AMF-2502 2502 - Front Door (OUTSIDE) WV-SFV631L
AMF-2510 2510 - A Front WV-SFR311
AMF-2511 2511 - A Back WV-SFR311
AMF-2512 2512 - C Back WV-SFR311
AMF-2513 2513 - C Front WV-SFR311
AMF-2514 2514 - B Front WV-SFR311
AMF-2515 2515 - B Back WV-SFR311
AMF-2516 2516 - D Back WV-SFR311
Baraga Existing Camera Name & Location
AMF-2517 2517 - D Front WV-SFR311
AMF-2518 2518 - Laundry WV-SW158
AMF-2519 2519 - Commons A/B WV-SW458
AMF-2520 2520 - Commons C/D WV-SW458
AMF-2521 2521 - Chow Hall WV-SW458
AMF-2523 2523 - HU-5 Entry WV-SFR311
AMF-2600 2600 - Zone 7 (PTZ) WV-SW598
AMF-2601 2601 - Yard WV-SFV631L
AMF-2602 2602 - Front Door (OUTSIDE) WV-SFV631L
AMF-2610 2610 - A Front WV-SFR311
AMF-2611 2611 - A Back WV-SFR311
AMF-2612 2612 - C Back WV-SFR311
AMF-2613 2613 - C Front WV-SFR311
AMF-2614 2614 - B Front WV-SFR311
AMF-2615 2615 - B Back WV-SFR311
AMF-2616 2616 - D Back WV-SFR311
AMF-2617 2617 - D Front WV-SFR311
AMF-2618 2618 - Laundry WV-SW158
AMF-2619 2619 - Commons A/B WV-SW458
AMF-2620 2620 - Commons C/D WV-SW458
AMF-2621 2621 - ARUS Hallway WV-SFR311
AMF-2622 2622 - Study Hall WV-SW458
AMF-2623 2623 - HU-6 Yard PTZ SNP-5321H
AMF-2624 2624 - HU-6 Entry WV-SFR311
AMF-2700 2700 - Zones 7 & 8 (PTZ) WV-SW598
AMF-2701 2701 - Yard WV-SFV631L
AMF-2702 2702 - Front Door (OUTSIDE) WV-SFV631L
AMF-2710 2710 - A Front WV-SFR311
AMF-2711 2711 - A Back WV-SFR311
AMF-2712 2712 - C Back WV-SFR311
AMF-2713 2713 - C Front WV-SFR311
AMF-2714 2714 - B Front WV-SFR311
AMF-2715 2715 - B Back WV-SFR311
AMF-2716 2716 - D Back WV-SFR311
AMF-2717 2717 - D Front WV-SFR311
AMF-2718 2718 - Laundry WV-SW158
AMF-2719 2719 - Commons A/B WV-SW458
AMF-2720 2720 - Commons C/D WV-SW458
AMF-2721 2721 - ARUS Hallway WV-SFR311
AMF-2722 2722 - Chow Hall WV-SW458
AMF-2723 2723 - HU-7 Yard PTZ SNP-5321H
AMF-2724 2724 - HU-7 Entry WV-SFR311
Baraga Existing Camera Name & Location
AMF-2800 2800 - HU-8 Zone 4 PTZ WV-SW598
AMF-2801 2801 - HU-8 Front Gate WV-SFV631L
AMF-2802 2802 - HU-8 Zone 1 PTZ WV-SW598
AMF-2803 2803 - HU-8 Pole Barn WV-SFV631L
AMF-2804 2804 - ZONE 2 / Weights WV-SW598
AMF-2805 2805 - HU-8 Weight pit WV-SFV631L
AMF-2806 2806 - HU-8 Basketball Court WV-SFV631L
AMF-2807 2807 - HU-8 Horseshoe Pit WV-SFV631L
AMF-2810 2810 - HU-8 East A-2 WV-SFR311
AMF-2811 2811 - HU-8 East B-2 WV-SFR311
AMF-2812 2812 - HU-8 East B-1 WV-SFR311
AMF-2813 2813 - HU-8 East A-1 WV-SFR311
AMF-2814 2814 - HU-8 East Chow Hall WV-SW458
AMF-2815 2815 - HU-8 East Hallway 1 WV-SW458
AMF-2816 2816 - HU-8 East Hallway 2 WV-SFR311
AMF-2817 2817 - HU-8 East Commons WV-SW458
AMF-2818 2818 - HU-8 Food Service WV-SW458
AMF-2819 2819 - HU-8 Laundry WV-SFR311
AMF-2820 2820 - HU-8 West Chow Hall WV-SW458
AMF-2821 2821 - HU-8 West Hallway 1 WV-SW458
AMF-2822 2822 - HU-8 West Hallway 2 WV-SFR311
AMF-2823 2823 - HU-8 West Commons WV-SW458
AMF-2824 2824 - HU-8 West B-1 WV-SFR311
AMF-2825 2825 - HU-8 West A-1 WV-SFR311
AMF-2826 2826 - HU-8 West A-2 WV-SFR311
AMF-2827 2827 - HU-8 West B-2 WV-SFR311
AMF-2828 2828 - HU-8 West Classroom D WV-SF438
AMF-2829 2829 - HU-8 West Classroom C WV-SF438
AMF-2830 2830 - HU-8 East Classroom-B WV-SF438
AMF-2831 2831 - HU-8 East Classroom-A WV-SF438
AMF-3200 3200 - Sally Port WV-SW598
TC101
TYPICAL PERIMETER CAMERA CABLE LABELS
AT FACEPLATE & PATCH PANEL
TC101
FIBER OPTIC CABLE AT PERIMETER CABINETS
LABELING AT PATCH PANEL
TC101
COMMUNICATIONS GROUNDING DETAIL
TC101
FIBER OPTIC PANEL
LABELING DETAIL
TC101
UTP PATCH PANEL (TYP)
TC101
TYPICAL DATA CABLE LABELING
AT FACEPLATE AND PATCH PANEL
TC101
TYPICAL FACEPLATE LABELING
COMMUNICATION CABLE SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
NETWORK EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
SECURITY EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
SECURITY SYMBOL LEGEND
SYMBOL DESCRIPTION
COMMUNICATION EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO.
ABBREVIATIONS
ABBREV. DESCRIPTION ABBREV. DESCRIPTION
PC
CAMERA EQUIPMENT SCHEDULE
MARK DESCRIPTION MANUFACTURER PART NO. DROP CEILING HARD
CEILING/WALL
BUILDING
EXTERIOR
BUILDING
EXTERIOR
CORNER
POLE MOUNT
TC101
CABLING LEGENDS,
DETAILS AND
SCHEDULES
C om m te ch
D es ig n
C O
U R
TL
AN
D S
T.
, S
U
IT
E
R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t r ix
TC110
BARAGA SECURITY CAMERA
ONE LINE DIAGRAMS TC110
BARAGA SECURITY
CAMERA ONE LINE
DIAGRAMS
C om m te ch
D es ig n
C O
U R
TL
AN
D S
T.
, S
U
IT
E
R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t
TC111
BARAGA SECURITY CAMERA
ONE LINE DIAGRAMS
TC111
BARAGA SECURITY
CAMERA ONE LINE
DIAGRAMS
C om m te ch
D es ig n
C O
U R
TL
AN
D S
T.
, S
U
IT
E
R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t
TC112
BARAGA SECURITY CAMERA
ONE LINE DIAGRAMS TC112
BARAGA SECURITY
CAMERA ONE LINE
DIAGRAMS
C om m te ch
D es ig n
C O
U R
TL
AN
D S
T.
, S
U
IT
E
R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t
TC114
BARAGA SECURITY CAMERA
ONE LINE DIAGRAMS TC114
BARAGA SECURITY
CAMERA ONE LINE
DIAGRAMS
C om m te ch
D es ig n
C O
U R
TL
AN
D S
T.
, S
U
IT
E
R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t
PC-REP
PC-NEW
TC303
BARAGE EDUCATION BUILDING 300
FIRST FLOOR - NEW & REPLACEN
KEYED SECURITY NOTES
GENERAL SECURITY NOTES
EDUCATION BUILDING
300 FIRST FLOOR -
NEW & REPLACE
TC303
C om m te ch
D es ig n
C O
U R
TL
AN
D S
T.
, S
U
IT
E
R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t
TC320
200-SUPPORT SERVICES BUILDING
FIRST FLOOR - NEW & REPLACE
N
KEYED SECURITY NOTES
GENERAL SECURITY NOTES
200-SUPPORT SERVICES
BUILDING FIRST FLOOR
NEW & REPLACE
TC320
C om m te ch
D es ig n
C O
U R
TL
AN
D S
T.
, S
U
IT
E
R
O C
KF
O
R D
, M
IC
H
IG
AN
W W
W .C
O M
M
TE
C H
D
ES
IG
N
.C O
M
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O
F M
IC
H
IG
A
N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
M a t
Bidding and Contract Document (R 02/22) Project Name: VMS Upgrade – Phase 1 File No. 472/21301.JBB
00-21
SECTION 00800 SUPPLEMENTARY CONDITIONS
1. The following conditions must supplement the general conditions:
The provisions of this Section 00800 Supplementary Conditions amend or supplement Section 00700 General Conditions and those other provisions of the Contract Documents, as indicated below. All other provisions of the Contract Documents that are not so amended or supplemented remain in full force and effect.
Lien clearance must be completed and sent in before April 25, 2022, or contractor will not be allowed at facility. Allowance shall be a provisionally allowance as defined in specifications.
Prime contractor shall have a site superintendent who is an employee of the bidding contractor. They shall also be present at site During Construction. Subcontractors are not allowed to be site supervisor.
No subcontractor shall perform work on site without site superintendent on site.
Clarification: Daily reports are required each day.
Clarification: Contractor will be responsible for any additional lighting required to perform work.
Clarification: Preliminary schedule.
a. Bids due date: May 11, 2022
b. Pre-Bid Conference/walk thru: April 28, 2022, at 9:00 AM – Must arrive at site 30 minutes early for COVID testing. Masks are required at all inside locations.
c. Accepting Questions up to MAY 4, 2022, at 3 pm
d. Last Addendum issued: May 6, 2022
e. Pre-Construction meeting: week of June 27, 2022
Clarification: Contractors are required to furnish a preliminary schedule that includes the following items:
a. Crew size and number of crews.
b. The number of days per week that they will be onsite.
c. Provide dates and times for switch over.
Clarification: Escorts to be included for one location.
Clarification: Contractors will be allowed to work Monday – Friday 8:00am to 4:00pm
Clarification: There will be the following project meetings for each site.
a. Pre-Construction conference – Scheduled after contract is executed.
b. Progress Meetings – This will be determined at each Pre-Construction conference, minimum two per month.
c. Substantial completion and final completion meeting.
d. 11 Month Post Construction Meeting.
Clarification: contractors are to provide a spare parts list for all device and equipment with the following info:
a. Description
b. Manufacturer.
c. Part number
Contractor is required to create a project specific COVID19 Preparedness and Response Plan complying with all federal & state requirements and guidelines, including but not limited to, the most resent State of Michigan Executive Order, OSHA, MiOSHA and CDC Guidelines. This plan will need to be submitted and approved prior to commencing onsite work.