Addendum_05-18_Bid_Form.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Bill Keller Park Infield Renovations
Solicitation number
05-18
Issued by
Volusia County, Florida

About this file

This is a Bid Form Addendum for the City of DeBary's Bill Keller Park Infield Renovation Project (Bid No. 05-18), which involves the complete renovation of two youth-size baseball fields (Fields 1 and 3) currently used by Babe Ruth for the 46/60 and 50/70 divisions. The project scope includes stripping both infields to base grade, reworking irrigation zones, performing laser grading for clay and turf areas, incorporating new clay with conditioner, constructing a new pitcher's mound with mound clay, installing new pitching rubber, home plate, bases, and base stanchions, and installing new sod with rolling of all clay and turf areas. Equipment mobilization is scheduled for July 2, 2018, with project completion required by August 23, 2018, before the start of fall ball season. The addendum establishes additional bid line items for the project.

The bid form identifies two specific line items to be submitted by contractors: Item 18-11 for Full Size (18') Pitcher's Mound Construction as a lump sum bid, and Item 18-12 for Crimson Stone Warning Track Material priced per ton. Both items are marked as "Do not include in total bid amount," indicating they are separate pricing elements or may be optional specifications for contractor evaluation. The form requires bidders to provide written unit prices and calculate totals for each designated item.

View the file

Other files

File Type Posted
05-18_bid_tab.pdf PDF
Addendum_05-18__1__4-17-18.docx DOCX document
Addendum_Pay_Items.docx DOCX document
BID_05-18.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID FORM
CITY OF DEBARY
BILL KELLER PARK INFIELD RENNOVATION PROJECT (FIELDS 1&3)
BID NO. 05-18
ITEM NO.DESCRIPTIONQUANTITYUNITWRITTEN UNIT PRICEUNIT PRICETOTAL
18-11Full Size (18')Pitchers Mound Construction1Lump SumDo not include in total bid amount
18-12Crimson Stone Warning Track Material1Per TonDo not include in total bid amount

Prepared by Title & Date

END OF FORMS TO BE INCLUDED WITH ADDENDUM #1

Sheet2

Sheet3

File details come from the government source that posted it. Updated .