This document provides a code and criteria review for a federal contract opportunity to repair BE Admin and Shops buildings 4210 and 4211 for the Florida Air National Guard. The review identifies no required changes to previously submitted civil, structural, architectural, mechanical, plumbing, telecommunications, or electrical engineering documents. For fire protection engineering, the review recommends updating the reference to UFC 3-600-01 on sheet F-003 to reflect the current change. For electrical engineering, changes to lighting requirements and controls in some areas would be needed to comply with updated ASHRAE 90.1 and UFC 3-530-01.

The related federal contract opportunity is a solicitation set aside for small businesses to award a firm fixed price contract for repair services. The North American Industry Classification System code is 236220. The pre-bid conference will take place on January 26, 2024 and site visits will follow. The contract duration is 300 calendar days after notice to proceed and the magnitude of construction is estimated between $5,000,000 to $10,000,000.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Air National Guard

Camp Blanding Joint Training

Center 202 Red Horse Squadron

Repair BE Admin & Shops

Bldgs 4210 & 4211 Project Number: CYQL152003

Contract Number: W50S6Y-23-0004

12 December 2023

Code and Criteria Review Submittal

Prepared by:

Tetra Tech Project No.: 213-38546-24001

M&H Project No.: 4363500-171034.01

Code and Criteria Review

Project Number: CYQL152003 Repair BE Admin & Shops Bldg 4210 & 4211, Florida ANG

Code and Criteria Review Contract Number: W911YN-19-F-0059

The following Code and Criteria Review has been completed within conformance with the ANG Design

Objectives and Procedures (Tab C) dated April 16, 2010 for effort performed under work order

W911YN18F0019, dated 13 September 2018.

This review is the result of the research of ANG Engineering Technical Letters, Unified Facility Criteria, and building codes for updates and revisions relating to the project criteria and design project requirements since the competition of the Type B-3 Submittal, dated November 19, 2021.

The following codes and criteria were utilized in the development of the Type B-3 Submittal documents.

Those found to have experienced updates have been noted below at each occurrence:

DoD Design Requirements

Uniform Facility Requirements (UFC)

UFC 1-200-01 DoD Building Code (General Building Requirements); 01 December 2020 updated

Change 2, 01 July 2022

UFC 1-200-02 High Performance and Sustainable Building Requirements; 01 December 2020 Updated

Change 2, 01 June 2022

UFC 3-101-01 Architecture: 16 December 2020 Updated Change 2, 02 October 2023

UFC 3-110-03 Roofing; Change 5, 12 June 2020

UFC 3-120-01 Design: Sign Standards; Change 3, 12 December 2017 Updated Change 4, 01 February

UFC 3-120-10 Interior Design: 16 May 2018 Updated Change 2,15 June 2021

UFC 3-301-01 Structural Engineering: 1 October 2019 Updated Change 2 October 2023

UFC 3-400-02 Design: Engineering Weather Data; 20 September 2018

UFC 3-401-01 Mechanical Engineering; Change 1, 01 October 2015

UFC 3-420-01 Plumbing Systems: Change 11, 01 November 2019 updated 01 April 2021

UFC 3-501-01 Electrical Engineering; 01 November 2019

UFC 3-520-01 Interior Electrical Systems; 06 October 2015

UFC 3-530-01 Interior and Exterior Lighting Systems and Controls; Change 3, 01 June 2016 Updated 09

February 2023

UFC 3-550-01 Exterior Electrical Power Distribution: 01 September 2016 Updated Change 3, 01

November 2019

UFC 3-560-01 Electrical Safety, O&M; Change 5, 14 April 2015 Updated Change 3, 15 May 2023

UFC 3-580-01 Telecommunications Interior Infrastructure Planning and Design.

Change 1, 01 June 2016

UFC 3-600-01 Fire Protection Engineering for Facilities; Change 1, 28 November 2016, Change 4, 7

February 2020 updated Change 6, published 6 May 2021

UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings; Change 1, 19 August 2020 Updated

Change 2, 30 July 2022

Code and Criteria Review

Project Number: CYQL152003 Repair BE Admin & Shops

Public Law

Public Law 1095-58 Energy Policy Act (EPAct) of 2005; 08 August 2005

Accessibility for DoD Facilities

ABA ABA Accessibility Standard for Department of Defense Facilities; 31 October 2008

Air National Guard Requirements

Air National Guard Handbooks (ANGH)

ANGH 32-1084 Air National Guard Handbook, Facility Space Standards; 20 December 2015 updated 30 March 2022

ANGETL 15-01 Air National Guard Design Policy; 01 May 2015

Public Codes

International Code Council (ICC)

IBC International Building Code; 2018

IPC International Plumbing Code; 2018

IMC International Mechanical Code; 2018

IEC International Electrical Code; 2018

American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)

ASHRAE Standard 55 Thermal Environmental Conditions for Human Occupancy; 2013 2020

ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality; 2010 updated 2016

ASHRAE Standard 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings (IP);

2013 2022

National Fire Protection Association (NFPA)

NFPA 13 Standard for the Installation of Sprinkler Systems; 2013 2022

NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems; 2014 2023

NFPA 70 National Electrical Code; 2014 2023

NFPA 72 National Fire Alarm Code and Signaling Code; 2013 2022

NFPA 75 Standard for the Fire Protection of Information Technology Equipment; 2013

NFPA 90A Standard for the Installation of Air-Conditioning Ventilating Systems; 2015

NFPA 101 Life Safety Code; 2015 2024

NFPA 170 Standard for Fire Safety and Emergency Symbols; 2015 2024

NFPA 241 Standard for Safeguarding Construction, Alteration and Demolition

Operations; 2013 2022

NFPA 780 Standard for the Installation of Lightning Protection Systems; 2014 2023

Code and Criteria Review

Project Number: CYQL152003 Repair BE Admin & Shops

Civil Engineering Summary

We find there are no significant changes to the applicable current code and criteria requiring modifications to the Civil Engineering documents within the Type B-3 Submittal. The project is designed as compliant with current code and criteria.

Structural Engineering Summary

We find there are no significant changes to the applicable current code and criteria requiring modifications to the Structural Engineering documents within the Type B-3 Submittal. The project is designed as compliant with current code and criteria.

Architectural Summary

We find there are no significant changes to the applicable current code and criteria requiring modifications to the Architectural documents within the Type B-3 Submittal. The project is designed as compliant with current code and criteria.

Mechanical and Plumbing Engineering Summary

We find there are no significant changes to the applicable current code and criteria requiring modifications to the Mechanical and Plumbing Engineering documents within the Type B-3 Submittal. The project is designed as compliant with current code and criteria.

Fire Protection Engineering Summary

The following summarizes the Code and Criteria changes for Fire Protection Engineering:

UFC 3-600-01 Fire Protection Engineering for Facilities; Change 6, 6 May 2021.

Most changes are revisions in UFC 3-600-01 that address the authority over some fire protection features, scoping regarding branch-specific guidelines, and expanding definitions. UFC 3-600-01 Change

6 scopes in the latest editions of the NFPA standards. A notable change in NFPA 13 Chapter 19 moved away from the use of density/area curves for the standard occupancy classes to a single-point density option for new systems.

Per UFC 3-600-01, Change 6, the following list outlines the changes as they relate to the project:

• Included a new section 10-7 for Accessible Means of Egress

• Section 1-4.2.2 changes the authority over features in excess of the requirements in UFC from the “Authority Having Jurisdiction (AHJ)” to a Component Fire Protection Engineer (CFPE)” along with an expanded definition of a CFPE in Section 2-1.4.

• Section 1-4.2.5 notes that the Air Force issues specific technical guidelines (Air Force Guidance

Manual (AFGM)) that expand the requirements of the UFC.

• Section 2-1.2 provides the definition of “Ammunitions and Explosives.”

• Section 9-7.6.3 states that the Air Force permits the use of CPVC and other listed plastic sprinkler pipe in any occupancy in which an approved listing exists when installed in strict accordance with the approved listing.

Code and Criteria Review

Project Number: CYQL152003 Repair BE Admin & Shops

• Section 10-7 is a new section regarding the Accessible Means of egress – all exits of both buildings are considered accessible as they open to grade and the building is a single story. Both buildings are compliant.

The Type B-3 Submitted Code Sheet F-003 lists the project as complying with UFC 3-600-01 (Change 4, 7 February 2020). This standard has since been updated with to Change 6, published 6 May 2021. We recommend this reference be updated on this sheet. Other than this sheet, we find there are no significant changes in the building codes and NFPA standards requiring modifications to the Fire

Protection documents within the Type B-3 Submittal. The project is designed as compliant with current code and criteria.

Electrical Engineering Summary

The following summarizes the Code and Criteria changes for Electrical Engineering:

ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings (IP) 2022

UFC 3-530-01 Interior and Exterior Lighting Systems and Controls; Change 09 February 2023

The changes and updates to ASHRAE 90.1 & and UFC 3-530-01 do affect lighting requirements within the scope of this project. To be in compliance, lighting fixtures in some areas will require change. The lighting layout as designed would require reanalyzing. Lighting controls in some areas require change to provide additional AUTO&MANUAL-ON/AUTO&MANUAL-OFF controls.

Telecommunications Engineering Summary

We find there are no significant changes to the applicable current code and criteria requiring modifications to the Telecommunications documents within the Type B-3 Submittal. The project is designed as compliant with current code and criteria.

END OF REPORT.