This is Addendum No. 1 to the Invitation to Bid for the South Beach Loop Path Improvements Project issued by the City of Newport, Oregon on November 20, 2025. The addendum modifies the original contract documents for a comprehensive infrastructure project involving multi-use pathway construction, sidewalk improvements, and stormwater infrastructure across three primary locations: the Coastal Discovery Center at Camp Gray, SE 35th Street, and SE 40th Street. The original bid package was advertised on November 6, 2025, with bids due on November 24, 2025, at 2:00 p.m. at the Newport Planning Department. A non-mandatory pre-bid conference was held on November 13, 2025, at 11:00 a.m. at Newport City Hall. The contractor must achieve Substantial Completion within 105 days of the Notice to Proceed, with final payment due within 30 additional days.
The addendum includes significant modifications to the contract documents, with 21 plan sheet revisions addressing typical sections, slope information, retaining wall construction details, storm drain catch basin relocations, and driveway elevations. Specification changes include the addition of Juneteenth (June 19) as a paid holiday, revised traffic control plan submittal requirements with lane closure approval timelines, modifications to clearing and grubbing operations regarding vegetation salvage at 305 SE 35th Street, addition of Controlled Low Strength Materials (CLSM) as a new pay item measured in cubic yards, deletion of the Prefabricated Modular Retaining Walls section (00596B), and addition of Cast-in-Place Concrete Retaining Walls (00596C) as a replacement measured in exposed square feet of wall face. The bid form was completely reissued with adjusted quantities, including new bid items for CLSM Backfill, Retaining Wall Cast-in-Place Concrete, and Hydrant Extensions, while removing items for Prefabricated Modular Retaining Wall and Concrete Walks Thickened Edge. The City is responsible for obtaining all easements identified on the plans, with potential for scope removal without additional compensation if easements cannot be obtained timely.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Part 1 Contract Documents SB Loop Path Improvements~1.pdf | ||
| Bid Schedule _Addenda 1_CWE.docx | DOCX document | |
| Part 2 Specifications SB Loop Path Improvements.pdf | ||
| Part 3 Project Drawings SB Loop Pathway Improvements.pdf | ||
| Preliminary Bid Results~70.xlsx | XLSX spreadsheet | |
| SE 35th St Pothole Reports.zip | ZIP file | |
| South Beach Pathways Addenda 1 Plans 11-20-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1: ITB for South Beach Loop Path Improvements Project Page 1 of 5 November 20, 2025
CITY OF NEWPORT
169 SW COAST HWY
NEWPORT, OREGON 97365
phone: 541.574.0629 fax: 541.574.0644 http://newportoregon.gov
COAST GUARD CITY, USA
Mombetsu, Japan, Sister City
Date: November 20, 2025 Addendum No. 1
To: Plan Holders
Prepared By: Anna Iaukea, Urban Renewal Project Manager
Subject: South Beach Loop Path Improvements Project
The following changes, additions, and/or deletions are made to the Contract Documents:
DRAWINGS
All drawing sheets are being provided as part of the addendum for clarity and completeness.
Significant plan changes are listed on the following page. Other minor drafting revisions are included but do not alter design intent and are not itemized below.
Addendum No. 1: ITB for South Beach Loop Path Improvements Project Page 2 of 5
1. Sheet 1; ADD Sheet 4a Typical Sections to sheet index.
2. Sheet 3; ADD slope information to Typical Pathway Section #2 for SE 40th Street
3. Sheet 4; REPLACE sections on this sheet. Provide Typical Roadway Section for the width of SE 35th
Street. Section includes additional detail on pavement tapered grind/inlay, retaining wall construction, and station limits of items shown.
4. Sheet 4a; ADD this new sheet to provide a typical section for the shed portion of SE 35th Street.
5. Sheet 5; MODIFY Note #7: ‘SAWCUT 1' INTO EXISTING ASPHALT TO PROVIDE CLEAN, VERTICAL EDGE
AND REMOVE EXISTING ASPHALT.’
6. Sheet 6; MODIFY information related to storm drain catch basin SDCB-1 and adjoining storm pipe.
7. Sheet 6; ADD Construction Notes #24 ‘REMOVE AND RELOCATE EXISTING STOP AHEAD SIGN.
COORDINATE LOCATION WITH ENGINEER.’ and #25 ‘REMOVE EXISTING STOP BAR.’
8. Sheet 7; MODIFY Notes #11 and #12 to modify/adjust existing catch basins in place.
9. Sheet 8; ADD Note #18 “SALVAGE EXISTING HEDGE AND RELOCATE. SEE SPECIFICATIONS SECTION
00320 FOR MORE INFORMATION”. ADD Note #19 “REMOVE AND RELOCATE EXISTING MAILBOX.
COORDINATE LOCATION WITH ENGINEER.”
10. Sheet 9; ADD Note #19 “CONTRACTOR TO HAND EXCAVATE AROUND TREES. ROOTS LARGER THAN
2” DIAMETER SHALL REQUIRE CONTRACTOR TO OBTAIN LICENSED ARBORIST FOR REVIEW AND
APPROVAL PRIOR TO REMOVAL.”. MODIFY Notes #9 and #10 to install in-sidewalk curb inlet and provide Class E Backfill for storm pipe.
11. Sheet 10; MODIFY Note #10 to provide Class E Backfill for storm pipe.
12. Sheet 11; MODIFY Notes #8 and #9 to install in-sidewalk curb inlet and provide Class E Backfill for storm pipe. ADD Notes #18 and #19 to protect existing wall, remove asphalt, and restore area with ¾”-0” aggregate base. MODIFY driveway layout.
13. Sheet 12; Delete Note #8 and Note #9 and remove SDCB-6 and 8” C900 Storm pipe. Add Notes #8 and #9 to “ADJUST EXISTING HYDRANT TO MATCH FINISHED GRADE” and “PROTECT EXISTING
WALL”.
14. Sheet 13; MODIFY Note #8: ‘REMOVE EXISTING CURB TO EDGE OF RECONSTRUCTION LIMITS’.
MODIFY Note #14: ‘REMOVE EXISTING ASPHALT TO LIMITS SHOWN AND RESTORE ASPHALT PER CITY STD. DET. G-105.’ ADD Notes #17 and #18 to install in-sidewalk curb inlet and 8” C900 storm pipe.
15. Sheet 16; MODIFY elevations of driveway approach
16. Sheet 18; MODIFY spot elevations west of driveway
17. Sheet 26; MODIFY information related to storm drain catch basin SDCB-2, SDCB-3, adjoining storm pipes, and related existing storm structures.
18. Sheet 27; REPLACE Plan and Profile for SDCB-6 Storm Inlet with revised location on SE 40th Street.
MODIFY information related to storm drain catch basin SDCB-5 and adjoining storm pipe.
19. Sheet 28; REMOVE City Std. Det. G-101.
20. Sheet 29; ADD City Std. Det. D-330.
21. Sheet 32; REPLACE Retaining Wall Typical Section and Thickened Edge Sidewalk detail with
Monolithic Sidewalk with Wall Section.
Addendum No. 1: ITB for South Beach Loop Path Improvements Project Page 3 of 5
SPECIFICATIONS
1. 00220.40(e)(2)a. Holidays – ADD the following to the bulleted list:
• Juneteenth on June 19
2. 00221.06 Traffic Control Plan – ADD the following after the sentence beginning with ‘Submit the following, for approval 5 calendar…’:
Submittal of the traffic control plans shall not constitute approval. Contractor shall allow time for review, including potential resubmittals to correct errors/omissions, prior to date when traffic control is scheduled to be placed. Lane closures are only allowed when approved in writing by the City two weeks in advance of closure.
3. 00320 Clearing and Grubbing – REPLACE this standard section, except for the section number and title, as follows:
Comply with Section 00320 of the Standard Specifications modified as follows:
00320.42 Disposal of Matter - Replace this subsection with the following subsection:
00320.42 Ownership and Disposal of Matter - Vegetation and landscaping materials at or adjacent to 305 SE 35th Street designated for preservation and salvage are the property of the property owner. All other matter and debris accumulated from clearing and grubbing operations become the Contractor’s property at the place of origin. Dispose of all matter and debris according to 00290.20.
00320.90 Payment – Add the following paragraph to this subsection:
Removal, salvage, and replanting of landscaping materials at 305 SE 35th Street shall be considered incidental to this pay item.
4. 00442 Controlled Low Strength Materials – ADD this standard section in its entirety, modified as follows:
00442.80 Measurement – Replace this subsection with the following:
The quantities of CLSM will be measured on the cubic yard basis for furnished and placed material.
00442.90 Payment – Replace this subsection with the following:
Pay Item Unit of Measurement
(a) CLSM Backfill……………………………………………………………………………….....Cubic Yard
No separate or additional payment will be made for:
• Trench protection
• Excavation required to place CLSM
• Dewatering
• Material that is ordered, but not placed
Addendum No. 1: ITB for South Beach Loop Path Improvements Project Page 4 of 5
• Staging the work to maintain traffic
• Plating
• Traffic Control
5. 00596B – PREFABRICATED MODULAR RETAINING WALLS - DELETE this section in its entirety.
6. 00596C Cast-in-Place Concrete Retaining Walls – ADD this standard section in its entirety, modified as follows:
00596C.05 Submittals - REMOVE the 2nd and 3rd bulleted items.
00596C.80 Measurement – REPLACE this subsection, except for the subsection number and title with the following:
Retaining wall will be measured by exposed square foot of wall face (top back of curb at back of sidewalk to the bottom of the wall).
Buried portions of the wall in excess of 12 inches are not to be measured and will be considered incidental.
Contractor must provide the City 2 working days notice prior to backfill of walls to allow for inspection and measurement.
Excavation necessary to install the wall, including all appurtenances, to meet the typical detail wall construction, shall be considered incidental and not measured.
00596C.90 Measurement – REPLACE this subsection, except for the subsection number and title with the following:
The accepted quantities of removal Work performed on a separate item basis will be paid for at the Contract unit price, per unit of measurement, for the following items:
Pay Item Unit of Measurement
(a) Retaining Wall, Cast-in-Place Concrete………………………………………...Square Foot
Item (a) includes all labor, equipment, materials, and other incidentals and work necessary to excavate, form, reinforce, pour, finish, and backfill to meet the intent of the details shown on the plans. All other work related to the wall not listed shall be considered incidental.
7. 00220.40(e)(2)a. Holidays – ADD the following bullet
• Juneteenth on June 19
8. Appendix – ADD ‘Test Hole Report Sheets, complete by Vac-X on 11/13/2025’
Addendum No. 1: ITB for South Beach Loop Path Improvements Project Page 5 of 5
GENERAL NOTES
RESPONSES TO QUESTIONS (If applicable – I’ll look at my notes from the pre-bid, but I don’t think any questions were asked that need to be addressed here)
1. Q: The plans list ‘proposed easements’. Does the contractor need to obtain these easements or will the City?
A: The City is responsible for obtaining all easements identified on the plans and is in the process of obtaining said easements. Note that work within the limits of easements may be delayed and/or removed from the scope of the work if the easements cannot be obtained in a timely manner. In the event of removal of work from the scope of the project, no additional compensation will be made for the work removed.
CONTRACT DOCUMENTS
A complete reissue of the Bid Form is included with this addendum. Several bid item quantities have been adjusted; only new or deleted bid items are described below.
1. Bid Form Modifications
a. ADD Bid Item #12 CLSM Backfill (00442)
b. REMOVE Bid Item #19 Retaining Wall, Prefabricated Modular Gravity (00596B)
c. ADD Bid Item #20 Retaining Wall, Cast-in-Place Concrete (00596C)
d. REMOVE Bid Item #27 Concrete Walks, Thickened Edge (00759)
e. ADD Bid Item #46 Hydrant Extensions (01160)