This is Addendum #3 to RFB 2026-24 for the Public Safety Building Corridor Renovation project, issued by Madison County on July 2, 2026. The addendum modifies contract drawings and specifications for the renovation work at 138 North Court Street, Building 7, Wampsville, New York. The document provides technical clarifications and revisions to drawing A-104 (Door Schedule, Interior Elevations, and Details), specifically revising Door No. 301 in Detail C3 to Frame Type 2 and adding four keynotes to Detail A4 that define construction elements including a new concrete lintel, CMU jamb block details, masonry wall painting requirements, and a wall bumper door stop specification at 7 feet 6 inches above finished floor. All bid adjustments resulting from this addendum must account for the cost of materials and labor related to these modifications, and contractors are required to acknowledge receipt of this addendum on their proposal submission to avoid potential disqualification.
This addendum constitutes one of the contract documents under AIA A201 General Conditions of the Contract for Construction and is binding on all bidders. Contractors must ensure full understanding of the changes, interpretations, and clarifications to both drawings and specifications when preparing their bids. The addendum is one page with no attachments and was issued by Adam Bruce, AIA, Project Architect. Bidders should note this addendum in conjunction with other contract documents, including any previously issued addenda, to ensure complete compliance with all contract requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
178.033.001
RFB 2026-24 – PUBLIC SAFETY BUILDING CORRIDOR RENOVATION
MADISON COUNTY
138 NORTH COURT STREET, BUILDING 7
WAMPSVILLE, NEW YORK
ADDENDUM #3
JULY 2, 2026
To All Holders of Contract Documents:
Your attention is directed to the following interpretations of, changes in, and additions to the Contract
Documents for the above-referenced project. All bid adjustments caused by the content of the Addendum shall include the cost of materials and labor related to the items herein and for any subsequent adjustments to the contract documents to accommodate the work stated herein.
This Addendum is part of the Contract Documents in accordance with the provisions of AIA A201 –
General Conditions of the Contract for Construction. Contractors shall be responsible for the full context of changes, interpretations, and clarifications to both the drawings and specifications and shall take the same into consideration when preparing their bids. Indicate receipt of this Addendum in the space provided within the Proposal.
This addendum consists of 1 page(s) and 0 attachment(s).
IN THE PROJECT MANUAL – ATTACHMENT 1A
1. NONE
ON THE CONTRACT DRAWINGS – ATTACHMENT 1B
1. A-104 – DOOR SCHEDULE, INTERIOR ELEVATIONS, AND DETAILS
a. DETAIL C3 – REVISE Door No. 301 to be Frame Type 2
b. DETAIL A4 – ADD Keynote Legend as per below:
i. KEYNOTE 10 – NEW CONCRETE LINTEL.
ii. KEYNOTE 11 – TOOTH IN NEW CMU JAMB BLOCKS TO MATCH
ADJACENT.
iii. KEYNOTE 12 – PAINT CONCRETE MASONRY WALL.
iv. KEYNOTE 18 – WALL BUMPER DOOR STOP MOUNTED AT 7’-6”
AFF.
Adam Bruce, AIA
Project Architect
END OF ADDENDUM #3