This is Addendum 01 to the Invitation to Bid for Construction Services issued by the Connecticut Department of Administrative Services (DAS) Construction Services for the Solnit South Chiller Replacement project. The addendum, dated October 19, 2026, adds specification section 01 11 00 (Summary of Work) to the contract documents and modifies the original bid documents dated January 30, 2026. The project involves the complete removal and replacement of a 250-ton Dunham Bush chiller and associated mechanical systems at 915 River Road, Middletown, Connecticut (Project No. BI-YS-184). Work scope includes replacement of chilled water pumps, condenser water pumps, VFDs, expansion tank, air separator, piping systems, controls, supply fan, relief air louver with motorized damper, exhaust fan, BMS control panel with BACnet IP communication, and electrical infrastructure including a new 1000-amp disconnect switch. The original bid due date is November 24, 2026 at 10:00 a.m. EST. All prospective bidders must acknowledge receipt of the addendum on the bid proposal form or face disqualification. A mandatory pre-bid meeting and site tour will be conducted as the only official opportunity to examine existing site conditions. Questions regarding the project must be submitted by email to the consulting engineer (AI Engineers Inc.) with copies to the DAS/CS Project Managers.

The addendum establishes key project management and contractual requirements, designating DAS/CS Project Managers Rahul Abraham and Alan Ladson as the authorized representatives for the State of Connecticut Department of Administrative Services, while the user agency is the Department of Children and Family Services (DCF). The engineer of record is AI Engineers Inc., with engineers Anthony Punzalan and Omer Ahmetovic. The contractor must utilize Trimble Project Management Software for all project documentation and communications and is responsible for all construction means, methods, and procedures. The contract requires compliance with local working hour restrictions, maintenance of adequate egress during construction, protection of wetland areas, and confining operations within designated contract limits. The contractor must also compile and submit subcontractor performance evaluations for any subcontractors performing work valued over $1,000,000 at 50 percent completion and substantial completion milestones. The addendum incorporates references to Connecticut Department of Transportation Standard Specifications and requires bidders to attend the pre-bid meeting to become familiar with site conditions, with any failure to do so not relieving the contractor of responsibility for accurate cost estimation.

View the file

Other files

File Type Posted
2623BIYS184_Oct_30_26_solicitation_doc.pdf PDF
00 40 14 CertOfAuthority 20231001.docx DOCX document
RWR Womens Locker Room Bid Set 10-23-26.pdf PDF
2623BIYS184_Oct_20_26_solicitation_doc.pdf PDF
00 45 20 Named Sub Signature Page 20251001.docx DOCX document
00 11 16 DAS-CS Invitation to Bid.pdf PDF
00 41 00 DAS-CS Bid Proposal Form LOCKED 07.01.2026.docx DOCX document
2623BIYS184_Nov_3_26_solicitation_doc.pdf PDF
00 45 14 GC Bidder Qual Statement 20251001.docx DOCX document
2623BIYS184_Nov_19_26_solicitation_doc.pdf PDF
2623BIYS184_Oct_28_26_solicitation_doc.pdf PDF
2623BIYS184_Nov_4_26_solicitation_doc.pdf PDF
00 40 16 DAS Update Stmt Reqts 20251001.docx DOCX document
2623BIYS184_Nov_11_26_solicitation_doc.pdf PDF
00 40 15 DAS Prequal Cert Reqts 20251001.docx DOCX document
2623BIYS184_Nov_6_26_solicitation_doc.pdf PDF
2623BIYS184_Nov_12_26_solicitation_doc.pdf PDF
Drawings.pdf PDF
2623BIYS184_Nov_18_26_solicitation_doc.pdf PDF
Addendum 2..pdf PDF
2623BIYS184_Nov_17_26_solicitation_doc.pdf PDF
00 43 16 BidBond 20240924.docx DOCX document
2623BIYS184_Nov_5_26_solicitation_doc.pdf PDF
RFQ-RFP 2026-04 for Commissioning Agent Services - Bungay ES Project.pdf PDF
2623BIYS184_Nov_10_26_solicitation_doc.pdf PDF
2623BIYS184_Nov_13_26_solicitation_doc.pdf PDF
2623BIYS184_Oct_29_26_solicitation_doc.pdf PDF
2623BIYS184_Oct_15_26_solicitation_doc.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Connecticut Department of

Administrative Services

Bid Addendum

Addendum No.: 01 Date Of Addendum: 10/19/2026

CT DAS 6030 (Rev. 08.09.2024) 6000 Bid Phase Forms

CT DAS Construction Services Office of Legal Affairs, Policy, and Procurement Solnit South Chiller Replacement

915 River Road, Middletown, CT 06457

BI – YS – 184

Original Bid Due Date / Time: 11/24/2026 10:00 AM

Previous Addendums: None

TO: Prospective Bid Proposers:

This Addendum forms part of the “Contract Documents” and modifies or clarifies the original “Contract Documents” for this Project dated 1-30-2026. Prospective Bid Proposers shall acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form.

Failure to acknowledge receipt of the total number the Addenda issued for this Project on the space provided on Section 00 41 00 Bid Proposal Form shall subject Bid Proposers to disqualification.

The following clarifications are applicable to drawings and specifications for the project referenced above.

Item 1:

Added specification section 01 11 00 Summary of Work.

All questions must be emailed (not verbal or by phone) to the consulting Architect/Engineer (AI Engineers Inc, Email:

sahmetovic@aiengineers.com) with copies sent to the DAS/CS Project Manager (Alan Ladson, Email: Alan.Ladson@ct.gov and Rahul Abraham, Email: Rahul.Abraham@ct.gov)

End of Addendum 01

Alison Kulas Alison Kulas, Paralegal Specialist State of Connecticut Department of Administrative Services, Construction Services Office of Legal Affairs, Policy, and Procurement 450 Columbus Boulevard, Suite 1307 Hartford, CT 06103 mailto:Alan.Ladson@ct.gov

SECTION 01 11 00

SUMMARY OF WORK

CT DAS 5200 (Rev. 07.01.2025) PROJECT NO.: BI-YS-184

PART 1 – GENERAL

1.1 DEFINITIONS

A. Contractor:

Whenever the term "Contractor" is used in these Division 01 General Requirements and the Contract Documents, it may be understood to mean either the Design-Bid-Build (D-B-B) “General Contractor” or the Construction Manager at Risk ("CMR") as applicable to the specific Project.

B. Subcontractor:

Whenever the term "Subcontractor" is used, it may be understood to mean either a Subcontractor or a Supplier, as applicable to the specific Project.

C. Contract:

Whenever the term "Contract" is used in these Division 01 General Requirements and the Contract Documents, it may be understood to mean either the D-B-B General Contractor’s Contract Sum as stated in their Contract or the CMR’s Contract Sum as stated in their CMR Agreement, as applicable to the specific Project.

1.2 RELATED DOCUMENTS

A. The Contract Documents are defined in the D-B-B and CMR Division 00 General Conditions, as applicable to the specific Project.

B. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

Division 01 Specification Sections, apply to this Section.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Delivery Method:

1. Design-Bid-Build (DBB);

2. Construction Manager at Risk (CMR) B. Project Number: BI-YS-184.

C. Project Title: Solnit South Chiller Replacement D. Project Location: 915 River Road, Middletown, CT 06457.

E. The Project Description:

1. Remove and replace the 250-ton Dunham Bush Chiller, chiller housekeeping pad, associated components, which include, but not limited to, (2) chilled water pumps, (2) condenser water pumps, VFDs, shot feeder, expansion tank, air separator, piping, piping support, piping accessories, equipment support, controls and control wiring with support. Remove and replace existing in-line supply fan with support, controls and control wiring with support. Existing outdoor air louver with damper and relief air louver to remain. Prove low air leakage Type 1A motorized damper for relief air louver. The addition of exhaust fan with controls, with ductwork and accessories, and refrigerant sensor, EPO switches, horns, strobes and controls to meet the 2021 IMC ventilation requirements. Provide BMS Control panel, BACnet IP communication bus, server and interface to existing operator work station. Remove existing conduit with support, disconnect switches and wire to mechanical equipment being demoed. Tap into the existing switchboard and provide new 1000A disconnect switch for new chiller, new conduits, wiring, accessories, etc. to new mechanical equipment.

3. The Authorities Having Jurisdiction for Threshold Projects, Non-Threshold Projects, and/or Connecticut State University System (CSUS) 2020 Projects, as defined by the Connecticut General Statutes, are the Connecticut Department of Administrative Services (DAS) / Construction Services (CS) Office of State Building Inspector (OSBI) and Office of State Fire Marshal (OSFM).

F. Owner:

1. Owner’s Name: The Owner is the State of Connecticut, Department of Administrative Services.

2. Authorized Representative for the Owner: DAS/CS Project Manager Name: Rahul Abraham, Alan

Ladson.

a. DAS/CS Project Manager’s Location: The DAS/CS Project Manager is located at 450 Columbus

Blvd, Suite 1201, Hartford, CT, 06103.

b. Phone: 860-936-2710 (A. Ladson);

c. Fax: N/A;

d. Email(s): Alan.Ladson@ct.gov; Rahul.Abraham@ct.gov

3. Authority: The DAS/CS Project Manager is the only authorized representative for the Department of Administrative Services Commissioner to act in matters involving revoking, altering, enlarging or relaxing any requirement of the Contract Documents. The DAS/CS Project Manager is not empowered to revoke, alter, enlarge, or relax any requirements as detailed within the articles of Division 00 Section 00 72 13 General Conditions Of The Contract for Construction for Design-Bid-Build OR Division 00 Section 00 72 23 General Conditions Of The Contract for Construction for Construction Manager At Risk, as applicable.

a. Related Section: Article 25, All Work Subject To Control of the Commissioner, Division 00

General Conditions of the Contract for Construction.

G. Agency:

1. Agency Name: The Connecticut State (User) Agency is DCF.

2. Agency Representative Name and Title: Jason Szczesniak. The Agency Representative’s Title is Plant

Facilities Engineer 2.

a. Agency Representative Location: The Agency Representative is located at 505 Hudson Street, Hartford, CT 06106.

b. Phone: 959-255-0606;

c. Fax: N/A;

d. Email(s): Jason.Szczesniak@ct.gov

3. Authority: The Agency Representative has the administrative authority for the facility and or site where the work is being performed but does not have the authority to change the Contract Documents or direct the Contractor.

H. Architect and Engineer (A/E):

1. Engineer’s Name: The Engineers representing the firm for this project are Anthony Punzalan, Omer

Ahmetovic

a. Engineer’s Location: The Engineer is located at 919 Middle St., Middletown, CT 06457.

b. Phone: 860-635-7740;

c. Fax: 860-635-7312;

d. Email(s): apunzalan@aiengineers.com; oahmetovic@aiengineers.com

2. The Architect and Engineer (A/E) or their accredited representative is referred to in the Contract Documents as "Architect" or "Architects" or "Engineer" or "Engineers" or by pronouns which imply them.

As information for the Contractor, the Architect’s or Engineer's status is defined as follows:

a. The Architect and Engineer will not make interpretations or decisions directly to the Contractor. All interpretations or decisions will be conveyed through the Construction Administrator to the DAS/CS Project Manager.

b. As the authorized representative of the Department of Administrative Services Commissioner, the Architect and Engineer is responsible for review of shop drawings, materials, and equipment intended for the work, in accordance with the Division 00 "General Conditions" and "Supplementary Conditions”.

3. Wherever the Architect or Engineer is mentioned in the documents in connection with an administrative function, it shall include the Construction Administrator in that function except for shop drawings.

K. Work: The Work Includes but is not limited to the following:

1 Cast-in-Place Concrete;

2 Miscellaneous Steel Support;

3 Waterproofing, Insulation, Firestopping, Sheet metal, and Joint Sealants;

4 HVAC, and Controls;

5 Electrical and Fire Alarm

L. The Contractor will include in their bid, all items required in order to carry out the intent of the Work as described, shown and implied in the Contract Documents.

mailto:Alan.Ladson@ct.gov

M. It shall be the Contractor's responsibility upon discovery to immediately notify the Construction Administrator, in writing, of errors, omissions, discrepancies, and instances of noncompliance with applicable codes and regulations within the documents, and of any work which will not fit or properly function if installed as indicated on the Contract Documents. Any additional costs arising from the Contractor's failure to provide such notification shall be borne by the Contractor.

N. The Work will be constructed under the Contractor’s Contract as applicable to this Project.

1.4 CONTRACTOR’S USE OF PREMISES

A. General: During the construction period the Contractor shall have full use of the newly constructed premises for construction operations, including use of the site. The Contractor's use of the premises is limited only by the Owner's right to perform work or to retain other contractors on portions of the Project.

B. Use of the Site: Limit use of the premises to work in areas indicated. Confine operations to areas within contract limits indicated. Do not disturb portions of the site beyond the areas in which the Work is indicated.

1. Owner Occupancy: Allow for Owner occupancy and use by the public of the existing facility.

2. The Contractor shall confine his operations including storage of materials, supplies, equipment, and apparatus to the areas bounded by the contract limits indicated and as directed in the Contract Documents.

3. Existing roads, drives, walks, and parking areas which are not within the contract limit line are to be kept free and clear at all times. All deliveries for the project are to enter the property from Riverview Rd. The Contractor shall check all roadways for accessibility and clearances for deliveries of all large material and equipment. The Contractor shall inform the Construction Administrator (DAS PMs) at least seventy-two

(72) hours in advance of these deliveries so they can be coordinated with the Agency so appropriate traffic control, etc. can be provided. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

4. The Contractor shall be responsible for keeping the premises clean and shall pick up rubbish and debris and promptly remove from site.

5. Parking for the Contractor's employees will be limited to an area designated by the Construction Administrator, and the Contractor may be required to provide identification stickers for all employees' cars.

6. Special precautions shall be taken to protect all wetland areas designated to remain. Prevent any and all sediment, debris, or other materials from getting into these areas. Should any sediment, debris, or other materials get into these areas or if any damage occurs to the vegetation therein, the Contractor shall immediately contact the Construction Administrator for direction.

7. The Contractor shall comply with local working hour restrictions, unless specifically approved otherwise in writing by the Owner.

8. No signs, other than those approved by the Construction Administrator, will be visible on the premises.

C. Use of the Existing Building: Maintain the existing building in a weather-tight condition throughout the construction period. Repair damage caused by construction operations. Take all precautions necessary to protect the building and its occupants during the construction period. Note: Check with Agency special types of conditions. Contractor personnel are not allowed to use the Cafeteria or vending machines within the existing buildings unless authorized in writing by the agency.

1.5 OCCUPANCY REQUIREMENTS

A. Full Agency Occupancy During Construction: The Owner reserves the right to allow the Agency to occupy the site and existing building during the entire construction period. Cooperate with the Agency during construction operations to minimize conflicts and facilitate Agency usage. Perform the Work so as not to interfere with the Agency's operations.

1. Provide adequate building and fire code egress from the buildings during the renovation process and/or as indicated on the Contract Documents. The Contractor will be responsible to maintain and protect egress ways during the construction sequence as required and/or indicated in the Contract documents.

The Contractor shall be responsible for preparing egress plans for Owner approval and for DAS/CS Office of State Building Official and Office of State Fire Marshal for approval if required.

B. Partial Agency Occupancy: The Owner reserves the right to allow the Agency to occupy and to place and install equipment in completed areas of the building prior to Substantial Completion, provided such occupancy does not interfere with completion of the Work. Such placing of equipment and partial occupancy shall not constitute acceptance of the total Work.

1. Should it become necessary or advisable, as the work nears final completion, for the Agency to occupy a portion of the building prior to final acceptance, the Contractor shall cooperate in completing such areas and making same accessible.

2. The Construction Administrator will determine whether such occupancy or use is possible and, if so, will make arrangements for holding a job inspection with the DAS/CS Project Manager, Agency Representative, and Contractor.

3. A comprehensive list of items to be completed or corrected as issued by the Contractor, together with the status of completion and terms of occupancy, will be forwarded to the DAS/CS Project Manager by the Construction Administrator. A letter will be issued by the DAS/CS Project Manager and Contractor to Construction Administrator granting such occupancy and will state the terms and conditions of occupancy.

4. Prior to partial Agency occupancy, mechanical and electrical systems shall be fully operational. Required inspections and tests shall have been successfully completed. Upon occupancy, the Agency will operate and maintain mechanical and electrical systems serving occupied portions of the building.

5. The Architect will prepare a “Certificate of Substantial Completion” for each specific portion of the Work to be occupied prior to Agency occupancy. Use the “Certificate of Substantial Completion” form as required by the Owner and forward the Certificate to the DAS/CS Office of State Building Inspector for a Certificate of Occupancy and obtain the same after his review and approval.

6. The DAS/CS Project Manager will request a signed “Certificate of Compliance” from Commissioner of the Department of Administrative Services, Architect, and Contractor, if required.

7. A letter from the DAS/CS Project Manager to the Agency Representative with copy to the Contractor granting occupancy will state the terms and conditions of occupancy and that fire insurance coverage has been requested, the effective date of which will indicate to the Contractor that they may cancel fire insurance coverage for that portion of the project.

8. Upon occupancy, the Agency will assume responsibility for maintenance and custodial service for occupied portions of the building.

9. Work after Partial Agency Occupancy:

9.1 For all work to complete the area occupied, warranty work, the balancing and Commissioning

(Cx) of systems, repair of latent defects and adjustments after partial occupancy, the Contractor is responsible for all costs associated with working in occupied buildings.

C. Agency Occupancy:

1. The Construction Administrator will determine whether such occupancy is possible and, if so, will make arrangements for holding a job inspection with the DAS/CS Project Manager, Agency Representative, and Contractor.

2. A comprehensive list of items to be completed or corrected as issued by the Contractor, together with the status of completion and terms of occupancy, will be forwarded to the DAS/CS Project Manager and the Contractor by the Construction Administrator. A letter will be issued by the DAS/CS Project Manager and Contractor to Construction Administrator granting such occupancy and will state the terms and conditions of occupancy.

3. Prior to Agency occupancy, mechanical and electrical systems shall be fully operational. Required inspections and tests shall have been successfully completed. Upon occupancy, the Agency will operate and maintain mechanical and electrical systems serving occupied portions of the building.

4. The Architect will prepare a “Certificate of Substantial Completion” for the Work to be occupied prior to Agency occupancy. Use the “Certificate of Substantial Completion” form as required by the Owner.

5. The DAS/CS Project Manager will request a signed “Certificate of Compliance” from Commissioner of the Department of Administrative Services, Architect, and Contractor, if required.

6. A letter from the DAS/CS Project Manager to the Agency Representative with copy to the Contractor granting occupancy will state the terms and conditions of occupancy and that fire insurance coverage has been requested, the effective date of which will indicate to the Contractor that they may cancel fire insurance coverage for the project.

7. Upon occupancy, the Agency will assume responsibility for maintenance and custodial service for occupied portions of the building.

8. Work after Agency Occupancy:

8.1 For all work to complete the occupied building, warranty work, the balancing and commissioning of systems, repair of latent defects and adjustments after occupancy, the Contractor is responsible for all costs associated with working in occupied buildings.

1.6 MISCELLANEOUS PROVISIONS

A. Examination of Site:

1. It is not the intent of the Documents to show all existing conditions. All Contractors and Subcontractors are advised to attend the Pre-Bid Meeting prior to submitting their Bid Proposals. This is the only official opportunity to visit and examine the site with the Owner, Agency, Architect, Engineer and Construction Administrator.

2. The Contractor should investigate and satisfy himself as to the conditions affecting the work, including but not restricted to those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, uncertainties of weather, roads or similar physical conditions of the ground, the character of equipment, and facilities needed preliminary to and during the prosecution of the Work. The Contractor should further satisfy himself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, as well as from information presented by the Contract Documents. Any failure by the Contractor to acquaint himself with the available information shall not relieve him from the responsibility for estimating properly the difficulty and cost of successfully performing the Work.

3. If tests have been done for Asbestos Containing Material (ACM), Lead-Based Paint (LBP) Containing Material, Polychlorinated Biphenyls (PCBs) in Building Materials and/or Mold, then the results are referenced in Section 00 30 00 Available Information and provided in Division 50 00 00 Project- Specific Available Information.

4. If tests have been done for Work Involving Hazardous Materials, Wastes, and Items and Universal Wastes (Including Products Containing Persistent Bioaccumulative Toxic Chemicals” [PBTs] such as PCBs, Di- 2-ethylhexyl Phthalate [DEHP], and Mercury), the results are referenced in Section 00 30 00 Available Information and provided in Division 50 00 00 Project-Specific Available Information.

5. No attempt has been made to locate hazardous material associated with existing site utilities, though it is presumed that at least some asbestos may be discovered associated with underground piping during the course of site and site utilities work. If and when such materials appear, the Contractor shall notify the Owner, who shall direct additional work outside of this Contract to assist in cutting up and disposing of same. The Contractor shall assist the hazardous materials contractor(s) with excavating, heavy lifting, and the like at no additional cost to the Owner.

B. Pre-Bid Meeting:

1. A Pre-Bid Meeting and tour of the site will be conducted as scheduled in Division 00 Section 00 11 16

“Invitation to Bid”. This scheduled meeting is the only official opportunity for the bidders to tour the site with the Owner, Architect, Engineer, Construction Administrator, and Agency.

C. Project Documents:

1. The Specifications and Drawings are intended to describe and illustrate the materials and labor necessary for the work of this Project.

2. Throughout the Technical Specifications, the Connecticut Department of Transportation Standard

Specifications for Roads, Bridges, and Incidental Construction Form 818, current edition including any interim and supplemental specifications are referenced. Where so referenced the requirements set forth therein are applicable and made a part hereof. Copies of Form 818 are available from the Connecticut Department of Transportation at a nominal charge.

D. Site Logistics Plan(s): Site Logistics Plan(s) for this Project are in the Contract Documents. The Site Logistics Plan(s) describe in detail the proposed use of the Site and Building, both inside and outside the Contract Limit Area.

1. Related Section: Section 01 31 00 “Project Management and Coordination”, 1.5 Submittals, A, (4).

2. The Site Logistics Plan(s) include, but are not be limited to the following information:

a. proposed vehicle and equipment access routes;

b. locations of proposed staging/lay-down and storage areas;

c. office trailer and dumpster locations;

d. proposed building access points

E. Scope Review:

1. Prior to signing a Contract with the State, DAS/CS will conduct a full scope review with the apparent Low

Bidder to ensure that all of the requirements have been included within the bid. This scope review will highlight all of the specific requirements of the project, a review of the DAS/CS procedures and all of the Technical sections of the contract documents.

2. This process will ensure that all of the scope of work included in the contract documents has indeed been included.

F. Specifications, Drawings, and Electronic Data Storage Devices Furnished:

1. The Contractor shall receive one (1) set of Portable Document Format (PDF, latest version)

Conformed Bid Documents (incorporating all Addendum changes made to the Contract Documents during the official Bid Period) on Electronic Data Storage Devices on or about the time of execution of the Contract, free of charge from the Architect. If additional copies are wanted, they will be available at the direct additional cost of their reproduction, to the Contractor.

2. The Contractor shall receive one (1) set of AutoCAD compatible (latest version) Conformed Set of Floor Plans (incorporating all Addendum changes made to the Contract Documents during the official Bid Period) on Electronic Data Storage Devices at no cost on or about the time of execution of the Contract from the Architect. Additional sets of AutoCAD compatible (latest version) Floor Plans on Electronic Data Storage Devices from the Architect shall be available at the cost of their reproduction, to the Contractor.

G. Construction Responsibility:

1. The Contractor shall be responsible for his construction means, methods, techniques, sequences, and procedures employed in the performance of his work and shall have full responsibility for his failure to carry out any part of his work in accordance with the Contract Documents.

H. Overtime Requests:

1. The Contractor shall request approval from the Owner to work overtime. Said request shall be made forty eight (48) hours in advance. All costs for overtime are included in the Contract Sum as stated in Division 00 Section 00 41 00 "Bid Proposal Form."

I. Project Management Software:

1. DAS/CS is using Project Management Software (Trimble) for this project.

2. The Contractor is required to utilize the specified Project Management Software for the duration of this project and shall provide all project information via this Project Management Software. This includes, but is not limited to contracts, applications for payment, change orders, change order proposals, requests for information, etc.

3. The DAS/CS Project Manager shall arrange for training. This training is for the Contractor’s Staff, the DAS/CS Project Manager, the Construction Administrator, the A/E, and their representatives.

4. DAS/CS will be establishing a project specific email “file” address for this project. The Contractor shall send an electronic “file” copy of all project documents to this email address, to include but not limited to all project correspondence, project emails, forms, etc.

5. The Contractor is required to scan all documents that contain wet (ink) signatures and send a copy of those documents electronically to the DAS/CS Project Manager and the project specific email “file” address. The hard copy of the wet signature documents shall be transmitted as directed by the DAS/CS Project Manager. This includes, but is not limited to all contracts, change orders, applications for payment, closeout documentation, etc.

J. Subcontractor Performance Evaluations:

1. Pursuant to C.G.S. Sec. 4a-101, the Contractor shall compile evaluation information during the performance of the contract on each of its subcontractors who are performing work with a value in excess of one million dollars ($1,000,000.00). The Contractor shall complete and submit to DAS/CS evaluations of each such subcontractor upon fifty percent (50%) completion of the project and upon Substantial Completion of the project. The Contractor acknowledges that its failure to complete and submit these evaluations in a timely manner may, by statute, result in a delay in project funding and, consequently, payment to the Contractor. The Contractor agrees to indemnify and hold the State harmless from any loss, damage, or expense that results from or is caused by the Contractor’s failure to complete and submit the evaluations to DAS/CS in accordance with this provision.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 01 11 00

THIS PAGE INTENTIONALLY LEFT BLANK

BI-YS-184 Addendum 01_20261016
Item 1:
01 11 00 Summary Of Work
PART 1 – GENERAL
1.1 DEFINITIONS
A. Contractor:
Whenever the term "Contractor" is used in these Division 01 General Requirements and the Contract Documents, it may be understood to mean either the Design-Bid-Build (D-B-B) “General Contractor” or the Construction Manager at Risk ("CMR") as applicabl...
B. Subcontractor:
Whenever the term "Subcontractor" is used, it may be understood to mean either a Subcontractor or a Supplier, as applicable to the specific Project.
C. Contract:
Whenever the term "Contract" is used in these Division 01 General Requirements and the Contract Documents, it may be understood to mean either the D-B-B General Contractor’s Contract Sum as stated in their Contract or the CMR’s Contract Sum as stated ...
1.2 RELATED DOCUMENTS
A. The Contract Documents are defined in the D-B-B and CMR Division 00 General Conditions, as applicable to the specific Project.
B. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Delivery Method:
1. ( Design-Bid-Build (DBB);
2. ( Construction Manager at Risk (CMR)
B. Project Number: BI-YS-184.
C. Project Title: Solnit South Chiller Replacement
D. Project Location: 915 River Road, Middletown, CT 06457.
E. The Project Description:
1. Remove and replace the 250-ton Dunham Bush Chiller, chiller housekeeping pad, associated components, which include, but not limited to, (2) chilled water pumps, (2) condenser water pumps, VFDs, shot feeder, expansion tank, air separator, piping, pi...
3. The Authorities Having Jurisdiction for Threshold Projects, Non-Threshold Projects, and/or Connecticut State University System (CSUS) 2020 Projects, as defined by the Connecticut General Statutes, are the Connecticut Department of Administrative Se...
F. Owner:
1. Owner’s Name: The Owner is the State of Connecticut, Department of Administrative Services.
2. Authorized Representative for the Owner: DAS/CS Project Manager Name: Rahul Abraham, Alan Ladson.
a. DAS/CS Project Manager’s Location: The DAS/CS Project Manager is located at 450 Columbus Blvd, Suite 1201, Hartford, CT, 06103.
b. Phone: 860-936-2710 (A. Ladson);
c. Fax: N/A;
d. Email(s): Alan.Ladson@ct.gov; Rahul.Abraham@ct.gov
3. Authority: The DAS/CS Project Manager is the only authorized representative for the Department of Administrative Services Commissioner to act in matters involving revoking, altering, enlarging or relaxing any requirement of the Contract Documents. ...
a. Related Section: Article 25, All Work Subject To Control of the Commissioner, Division 00 General Conditions of the Contract for Construction.
G. Agency:
1. Agency Name: The Connecticut State (User) Agency is DCF.
2. Agency Representative Name and Title: Jason Szczesniak. The Agency Representative’s Title is Plant Facilities Engineer 2.
a. Agency Representative Location: The Agency Representative is located at 505 Hudson Street, Hartford, CT 06106.
b. Phone: 959-255-0606;
c. Fax: N/A;
d. Email(s): Jason.Szczesniak@ct.gov
H. Architect and Engineer (A/E):
1. Engineer’s Name: The Engineers representing the firm for this project are Anthony Punzalan, Omer Ahmetovic
a. Engineer’s Location: The Engineer is located at 919 Middle St., Middletown, CT 06457.
b. Phone: 860-635-7740;
c. Fax: 860-635-7312;
d. Email(s): apunzalan@aiengineers.com; oahmetovic@aiengineers.com
2. The Architect and Engineer (A/E) or their accredited representative is referred to in the Contract Documents as "Architect" or "Architects" or "Engineer" or "Engineers" or by pronouns which imply them. As information for the Contractor, the Archit...
a. The Architect and Engineer will not make interpretations or decisions directly to the Contractor. All interpretations or decisions will be conveyed through the Construction Administrator to the DAS/CS Project Manager.
b. As the authorized representative of the Department of Administrative Services Commissioner, the Architect and Engineer is responsible for review of shop drawings, materials, and equipment intended for the work, in accordance with the Division 00 "G...

3. Wherever the Architect or Engineer is mentioned in the documents in connection with an administrative function, it shall include the Construction Administrator in that function except for shop drawings.

K. Work: The Work Includes but is not limited to the following:
1 Cast-in-Place Concrete;
2 Miscellaneous Steel Support;
3 Waterproofing, Insulation, Firestopping, Sheet metal, and Joint Sealants;
4 HVAC, and Controls;
5 Electrical and Fire Alarm
L. The Contractor will include in their bid, all items required in order to carry out the intent of the Work as described, shown and implied in the Contract Documents.
M. It shall be the Contractor's responsibility upon discovery to immediately notify the Construction Administrator, in writing, of errors, omissions, discrepancies, and instances of noncompliance with applicable codes and regulations within the docum...
N. The Work will be constructed under the Contractor’s Contract as applicable to this Project.
1.4 CONTRACTOR’S USE OF PREMISES
A. General: During the construction period the Contractor shall have full use of the newly constructed premises for construction operations, including use of the site. The Contractor's use of the premises is limited only by the Owner's right to perf...
B. Use of the Site: Limit use of the premises to work in areas indicated. Confine operations to areas within contract limits indicated. Do not disturb portions of the site beyond the areas in which the Work is indicated.
1. Owner Occupancy: Allow for Owner occupancy and use by the public of the existing facility.
2. The Contractor shall confine his operations including storage of materials, supplies, equipment, and apparatus to the areas bounded by the contract limits indicated and as directed in the Contract Documents.
3. Existing roads, drives, walks, and parking areas which are not within the contract limit line are to be kept free and clear at all times. All deliveries for the project are to enter the property from Riverview Rd. The Contractor shall check all r...
4. The Contractor shall be responsible for keeping the premises clean and shall pick up rubbish and debris and promptly remove from site.
5. Parking for the Contractor's employees will be limited to an area designated by the Construction Administrator, and the Contractor may be required to provide identification stickers for all employees' cars.
6. Special precautions shall be taken to protect all wetland areas designated to remain. Prevent any and all sediment, debris, or other materials from getting into these areas. Should any sediment, debris, or other materials get into these areas or ...
7. The Contractor shall comply with local working hour restrictions, unless specifically approved otherwise in writing by the Owner.
8. No signs, other than those approved by the Construction Administrator, will be visible on the premises.

C. Use of the Existing Building: Maintain the existing building in a weather-tight condition throughout the construction period. Repair damage caused by construction operations. Take all precautions necessary to protect the building and its occupan...

1.5 OCCUPANCY REQUIREMENTS
A. Full Agency Occupancy During Construction: The Owner reserves the right to allow the Agency to occupy the site and existing building during the entire construction period. Cooperate with the Agency during construction operations to minimize confl...
1. Provide adequate building and fire code egress from the buildings during the renovation process and/or as indicated on the Contract Documents. The Contractor will be responsible to maintain and protect egress ways during the construction sequence ...
B. Partial Agency Occupancy: The Owner reserves the right to allow the Agency to occupy and to place and install equipment in completed areas of the building prior to Substantial Completion, provided such occupancy does not interfere with completion ...
1. Should it become necessary or advisable, as the work nears final completion, for the Agency to occupy a portion of the building prior to final acceptance, the Contractor shall cooperate in completing such areas and making same accessible.
2. The Construction Administrator will determine whether such occupancy or use is possible and, if so, will make arrangements for holding a job inspection with the DAS/CS Project Manager, Agency Representative, and Contractor.
3. A comprehensive list of items to be completed or corrected as issued by the Contractor, together with the status of completion and terms of occupancy, will be forwarded to the DAS/CS Project Manager by the Construction Administrator. A letter will...
4. Prior to partial Agency occupancy, mechanical and electrical systems shall be fully operational. Required inspections and tests shall have been successfully completed. Upon occupancy, the Agency will operate and maintain mechanical and electrical...
5. The Architect will prepare a “Certificate of Substantial Completion” for each specific portion of the Work to be occupied prior to Agency occupancy. Use the “Certificate of Substantial Completion” form as required by the Owner and forward the Cert...
6. The DAS/CS Project Manager will request a signed “Certificate of Compliance” from Commissioner of the Department of Administrative Services, Architect, and Contractor, if required.
7. A letter from the DAS/CS Project Manager to the Agency Representative with copy to the Contractor granting occupancy will state the terms and conditions of occupancy and that fire insurance coverage has been requested, the effective date of which w...
8. Upon occupancy, the Agency will assume responsibility for maintenance and custodial service for occupied portions of the building.
9. Work after Partial Agency Occupancy:
9.1 For all work to complete the area occupied, warranty work, the balancing and Commissioning (Cx) of systems, repair of latent defects and adjustments after partial occupancy, the Contractor is responsible for all costs associated with working in oc...
C. Agency Occupancy:
1. The Construction Administrator will determine whether such occupancy is possible and, if so, will make arrangements for holding a job inspection with the DAS/CS Project Manager, Agency Representative, and Contractor.
2. A comprehensive list of items to be completed or corrected as issued by the Contractor, together with the status of completion and terms of occupancy, will be forwarded to the DAS/CS Project Manager and the Contractor by the Construction Administra...
3. Prior to Agency occupancy, mechanical and electrical systems shall be fully operational. Required inspections and tests shall have been successfully completed. Upon occupancy, the Agency will operate and maintain mechanical and electrical systems...
4. The Architect will prepare a “Certificate of Substantial Completion” for the Work to be occupied prior to Agency occupancy. Use the “Certificate of Substantial Completion” form as required by the Owner.
5. The DAS/CS Project Manager will request a signed “Certificate of Compliance” from Commissioner of the Department of Administrative Services, Architect, and Contractor, if required.
6. A letter from the DAS/CS Project Manager to the Agency Representative with copy to the Contractor granting occupancy will state the terms and conditions of occupancy and that fire insurance coverage has been requested, the effective date of which w...
7. Upon occupancy, the Agency will assume responsibility for maintenance and custodial service for occupied portions of the building.
8. Work after Agency Occupancy:
8.1 For all work to complete the occupied building, warranty work, the balancing and commissioning of systems, repair of latent defects and adjustments after occupancy, the Contractor is responsible for all costs associated with working in occupied bu...
1.6 MISCELLANEOUS PROVISIONS
A. Examination of Site:
1. It is not the intent of the Documents to show all existing conditions. All Contractors and Subcontractors are advised to attend the Pre-Bid Meeting prior to submitting their Bid Proposals. This is the only official opportunity to visit and examin...
2. The Contractor should investigate and satisfy himself as to the conditions affecting the work, including but not restricted to those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric po...
3. If tests have been done for Asbestos Containing Material (ACM), Lead-Based Paint (LBP) Containing Material, Polychlorinated Biphenyls (PCBs) in Building Materials and/or Mold, then the results are referenced in Section 00 30 00 Available Informatio...
4. If tests have been done for Work Involving Hazardous Materials, Wastes, and Items and Universal Wastes (Including Products Containing Persistent Bioaccumulative Toxic Chemicals” [PBTs] such as PCBs, Di-2-ethylhexyl Phthalate [DEHP], and Mercury), t...
5. No attempt has been made to locate hazardous material associated with existing site utilities, though it is presumed that at least some asbestos may be discovered associated with underground piping during the course of site and site utilities work....
B. Pre-Bid Meeting:
1. A Pre-Bid Meeting and tour of the site will be conducted as scheduled in Division 00 Section 00 11 16 “Invitation to Bid”. This scheduled meeting is the only official opportunity for the bidders to tour the site with the Owner, Architect, Engineer...
C. Project Documents:
1. The Specifications and Drawings are intended to describe and illustrate the materials and labor necessary for the work of this Project.
2. Throughout the Technical Specifications, the Connecticut Department of Transportation Standard Specifications for Roads, Bridges, and Incidental Construction Form 818, current edition including any interim and supplemental specifications are refere...
D. Site Logistics Plan(s): Site Logistics Plan(s) for this Project are in the Contract Documents. The Site Logistics Plan(s) describe in detail the proposed use of the Site and Building, both inside and outside the Contract Limit Area.
E. Scope Review:
1. Prior to signing a Contract with the State, DAS/CS will conduct a full scope review with the apparent Low Bidder to ensure that all of the requirements have been included within the bid. This scope review will highlight all of the specific require...
2. This process will ensure that all of the scope of work included in the contract documents has indeed been included.
F. Specifications, Drawings, and Electronic Data Storage Devices Furnished:
1. The Contractor shall receive one (1) set of Portable Document Format (PDF, latest version) Conformed Bid Documents (incorporating all Addendum changes made to the Contract Documents during the official Bid Period) on Electronic Data Storage Devices...
2. The Contractor shall receive one (1) set of AutoCAD compatible (latest version) Conformed Set of Floor Plans (incorporating all Addendum changes made to the Contract Documents during the official Bid Period) on Electronic Data Storage Devices at no...
G. Construction Responsibility:
1. The Contractor shall be responsible for his construction means, methods, techniques, sequences, and procedures employed in the performance of his work and shall have full responsibility for his failure to carry out any part of his work in accordanc...
H. Overtime Requests:
1. The Contractor shall request approval from the Owner to work overtime. Said request shall be made forty eight (48) hours in advance. All costs for overtime are included in the Contract Sum as stated in Division 00 Section 00 41 00 "Bid Proposal F...
I. Project Management Software:
1. DAS/CS is using Project Management Software (Trimble) for this project.
5. The Contractor is required to scan all documents that contain wet (ink) signatures and send a copy of those documents electronically to the DAS/CS Project Manager and the project specific email “file” address. The hard copy of the wet signature do...
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)