00 45 20 Named Sub Signature Page 20251001.docx

DOCX document 86 KB Posted

Attached to
Invitation to Bid for Construction Services
Solicitation number
2623BIYS184
Issued by
Middlesex County, Connecticut

About this file

This is a Named Subcontractor Signature Page form issued by the Connecticut Department of Administrative Services (DAS) for the Solnit South - Replace Chiller project (BI-YS-184) located at 915 River Road, Middletown, Connecticut. The form implements Connecticut General Statutes Sections 4a-60g(d) and 4b-95(b)(3), as amended by Public Act 25-168 and effective October 1, 2025. Bidders must obtain and provide signed statements from each Named Subcontractor listed in Table 2.7 of Section 00 41 00 Bid Proposal Form, confirming that the Named Subcontractor has communicated directly with the bidder about the work to be performed. All signed statements must be uploaded to CTsource prior to the bid opening date and time. Failure to submit signed statements from each Named Subcontractor by the bid opening or within two business days thereafter will result in automatic bid rejection and will not be considered a minor irregularity.

The form requires each Named Subcontractor to enter the bidder's firm name, sign the document, and provide their title, name, date, and firm name as attestation that direct communication occurred regarding the project scope. This requirement applies specifically to Named HVAC subcontractors with proposed values exceeding $100,000, as identified in the contract opportunity specifications. The document serves as a regulatory compliance mechanism to ensure transparent and direct communication between general contractors and their named subcontractors prior to bid submission.

View the file

Other files

File Type Posted
2623BIYS184_Oct_30_26_solicitation_doc.pdf PDF
00 40 14 CertOfAuthority 20231001.docx DOCX document
RWR Womens Locker Room Bid Set 10-23-26.pdf PDF
2623BIYS184_Oct_20_26_solicitation_doc.pdf PDF
00 11 16 DAS-CS Invitation to Bid.pdf PDF
Addenda 1.pdf PDF
00 41 00 DAS-CS Bid Proposal Form LOCKED 07.01.2026.docx DOCX document
2623BIYS184_Nov_3_26_solicitation_doc.pdf PDF
00 45 14 GC Bidder Qual Statement 20251001.docx DOCX document
2623BIYS184_Nov_19_26_solicitation_doc.pdf PDF
2623BIYS184_Oct_28_26_solicitation_doc.pdf PDF
2623BIYS184_Nov_4_26_solicitation_doc.pdf PDF
00 40 16 DAS Update Stmt Reqts 20251001.docx DOCX document
2623BIYS184_Nov_11_26_solicitation_doc.pdf PDF
00 40 15 DAS Prequal Cert Reqts 20251001.docx DOCX document
2623BIYS184_Nov_6_26_solicitation_doc.pdf PDF
2623BIYS184_Nov_12_26_solicitation_doc.pdf PDF
Drawings.pdf PDF
2623BIYS184_Nov_18_26_solicitation_doc.pdf PDF
Addendum 2..pdf PDF
2623BIYS184_Nov_17_26_solicitation_doc.pdf PDF
00 43 16 BidBond 20240924.docx DOCX document
2623BIYS184_Nov_5_26_solicitation_doc.pdf PDF
RFQ-RFP 2026-04 for Commissioning Agent Services - Bungay ES Project.pdf PDF
2623BIYS184_Nov_10_26_solicitation_doc.pdf PDF
2623BIYS184_Nov_13_26_solicitation_doc.pdf PDF
2623BIYS184_Oct_29_26_solicitation_doc.pdf PDF
2623BIYS184_Oct_15_26_solicitation_doc.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00 45 20

NAMED SUBCONTRACTOR SIGNATURE PAGE

SECTION 00 45 20

NAMED SUBCONTRACTOR SIGNATURE PAGE

Named Subcontractor Signature Page

NAMED SUBCONTRACTOR(S) SIGNATURES:

In accordance with Connecticut General Statutes (C.G.S.) Sections (§§) 4a-60g(d) and 4b-95(b)(3), as amended by Public Act 25-168 and effective October 1, 2025, the Bidder shall provide a signed statement from each Named Subcontractor stating that the Named Subcontractor has communicated directly with the Bidder about the work to be performed on such contract.

See Table 2.7 of Section 00 41 00 Bid Proposal Form for applicability.

GENERAL INSTRUCTIONS:

INSTRUCTIONS TO BIDDERS: IF APPLICABLE TO THE PROJECT:

1. The Bidder must obtain and provide a signed statement from each Named Subcontractor listed in Table 2.7 of Section 00 41 00 Bid Proposal Form for the Project listed below.

2. The Bidder must upload all signed statements from all Named Subcontractors to the solicitation on CTsource prior to the date and time of the Bid Opening.

3. Failure of a Bidder to upload signed statements from each Named Subcontractor listed in Table 2.7 of this Project’s Bid Proposal Form to the solicitation on CTsource prior to the date and time of the Bid Opening or to submit signed statements within two (2) business days after the Bid Opening shall cause rejection of the bid and shall not be considered a minor irregularity under C.G.S. § 4b-95.

INSTRUCTIONS TO EACH NAMED SUBCONTRACTOR:

1. The Named Subcontractor must enter the firm name of the Bidder with whom they communicated about the Project listed below.

2. The Named Subcontractor must sign below, and enter their title, name, date, and firm name. By signing below, the Named Subcontractor is indicating that they have communicated directly with the Bidder about the work to be performed on the project listed below.

Project Title:
Solnit South - Replace Chiller
Project Number:
BI-YS-184

Firm Name of Bidder (General Contractor):

(Print Bidder/General Contractor’s Firm Name)

Signature of Named Subcontractor:

(Duly Authorized Signature)

(Title)

(Print Name)

(Date)

(Print Named Subcontractor’s Firm Name)

End of Section 00 45 20 Named Subcontractor Signature Page

CT DAS 5000 (Rev. 10.01.2025)
PROJECT NO. BI-YS-184
CT DAS 5000 (Rev. 10.01.2025)
STANDARD FORM FOR ALL PROJECTS

File details come from the government source that posted it. Updated .