Add1_Narrative-Attachments_MearsSPElecUpgrade_25207.pdf

PDF 3 MB Posted

Attached to
751/25207. HJD; Mears State Park - Electrical upgrades
Solicitation number
RFQ-171-260000000021-3
Issued by
Oscoda County, Michigan

About this file

This document is an addendum issued by Century A&E on behalf of the State of Michigan Department of Technology, Management and Budget (DTMB) and the Department of Natural Resources for electrical upgrades at Mears State Park's modern campground in Pentwater, Michigan. Addendum No. 1, dated November 6, 2025, modifies the original bidding documents issued October 15, 2025, and clarifies that the construction commencement date is October 3, 2022, as referenced in section 00800, Appendix I, item 7.2. The addendum requires contractors to acknowledge receipt in their bid forms, with failure to do so potentially resulting in bid disqualification. Two reissued drawings accompany this addendum: Drawing E1.0 (Electrical Site Plan) and Drawing E3.0 (Electrical Details), with all changes to the plans indicated through cloud markings. A pre-bid meeting was held on October 28, 2025, at 1:00 PM at Mears State Park Headquarters, with attendance documented in the included meeting record. The revised drawings depict additional scope requirements for relocating the replacement electrical panel in the beach area Restroom/Changing Building under Alternate 1, including Plan Note 4 describing lighting panel replacement requirements, a new Grounding Electrode Detail, and the proposed new panel location.

The addendum specifies that all work shall remain subject to previously provided plans and specifications. The reissued drawings include expanded technical details and installation requirements referenced across multiple sheets. Drawing E1.0 additions include the grounding electrode detail and Plan Note 4, while Drawing E3.0 adds a note referencing Sheet 1.0 for installation requirements related to the beach area Restroom/Changing Building. The pre-bid meeting attendance record lists representatives from DNR Mears State Park, DTMB Design and Construction Division, DNR Cadillac District, Century A&E project management, and multiple bidding contractors and electrical firms. Matthew A. Tipping serves as the PSC Project Manager for Century A&E. The addendum was distributed to all bidders and the project team.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

f:\projects\mis044\pm\issued for\2025-11-07 addendum no. 1\addendum no.1.docx

ADDENDUM NO. 1

November 6, 2025

RE: State of Michigan DTMB

Department of Natural Resources Mears State Park Modern Campground - Electrical Upgrades Pentwater, Michigan Century A&E Project No. MIS044 DTMB File No. 751/25207.HJD

TO: PROSPECTIVE BIDDERS

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated October 15, 2025. This addendum is to be initialed and submitted as part of Bidder's bid package; failure to do so may subject Bidder to disqualification.

This Addendum consists of:

One (1) typed page Two (2) reissued drawings, Sheets E1.0, E3.0

INSTRUCTIONS

1. All work covered in this addendum shall be subject to the Plans and Specifications previously provided.

2. The Contractor must acknowledge receipt of this addendum in the bid form(s).

PRE-BID MEETING

1. Attendance Record is attached

CHANGES AND/OR ADDITIONS

1. As a clarification, the date to commence construction onsite is October 3, 2022, as stated in section 00800, Appendix I, item 7.2.

2. Drawing Sheets are reissued and noted below. All changes to plan(s) have been clouded.

REVISED DRAWINGS

1. Drawing E1.0 – Electrical Site Plan (Re-issued)

a. Depicted additional scope required to relocate the replacement panel in the beach area Restroom / Changing Building (Alternate 1).

i. Added Plan Note 4 describing requirements to replace lighting panel.

ii. Added “Grounding Electrode Detail”.

iii. At building indicated proposed new location of lighting panel.

Mears State Park Modern Campground - Electrical Upgrades Addendum No. 1 November 6, 2025

2. Drawing E3.0 – Electrical Details (Re-issued)

a. Depicted additional scope required to relocate the replacement panel in the beach area Restroom / Changing Building (Alternate 1).

i. Added Note to beach area Restroom / Changing Building to reference Sheet 1.0 for installation requirements.

END OF ADDENDUM NO. 1

Respectfully submitted, Century A&E

Matthew A. Tipping PSC Project Manager

Distribution: All Bidders & Project Team

Know what's below.

before you dig.Call

R

SHEET NO.

PROJECT NO:

DWG. SCALE:

DESIGN BY:

DRAWN BY:

NO

DA

TE

RE

VI

SI

ON

S

BY

C ra he n

A ve nu e

N E

- G ra nd R ap id s, M

I 4

Te le ph on e:

(6

) 4

-5

F ax

6)

-5

W eb : w w w

.c en tu ry ae .c om

E N T U R Y

Fa ci lit ie s D es ig n C

A E

MIS044

IS

SU

ED

F

OR

R

EV

IE

W

MA

T

/26

/20

P L U R I B U E

S U N U M

C I R C U M S P I C E

S I QU ERE I S PE NI NSUL A M A MOEN A M

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE OF MICHIGAN

ADAM P. LACH, RA, DIRECTOR

FACILITIES AND BUSINESS SERVICES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

P E

N T

W A

T E

R , M

IC

H

IG

A

N M

O D

E R

N C

A M

P G

R O

U N

D E

LE

C

T R

IC

A

L U

P G

R A

D E

S

FI

LE

N

O . 7

/2

.H

JD

M E

A R

S S

T A

T E

P A

R K

IS

SU

ED

F

OR

C

ON

ST

RU

CT

IO

N

MA

T

/15 /20

K. THOMAS

M. TIPPING

E1.0

AS NOTED

EL

EC

TR

IC

AL

S

IT

E

PL

AN

IS

SU

ED

F

OR

A

DD

EN

DU

M

NO

. 1

MA

T

/06 /20

SHEET NO.

PROJECT NO:

DWG. SCALE:

DESIGN BY:

DRAWN BY:

NO

DA

TE

RE

VI

SI

ON

S

BY

C ra he n

A ve nu e

N E

- G ra nd R ap id s, M

I 4

Te le ph on e:

(6

) 4

-5

F ax

6)

-5

W eb : w w w

.c en tu ry ae .c om

E N T U R Y

Fa ci lit ie s D es ig n C

A E

MIS044

IS

SU

ED

F

OR

R

EV

IE

W

MA

T

/26

/20

P L U R I B U E

S U N U M

C I R C U M S P I C E

S I QU EREI S P EN I N SUL AM AMOE NA M

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE OF MICHIGAN

ADAM P. LACH, RA, DIRECTOR

FACILITIES AND BUSINESS SERVICES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

P E

N T

W A

T E

R , M

IC

H

IG

A

N M

O D

E R

N C

A M

P G

R O

U N

D E

LE

C

T R

IC

A

L U

P G

R A

D E

S

FI

LE

N

O . 7

/2

.H

JD

M E

A R

S S

T A

T E

P A

R K

IS

SU

ED

F

OR

C

ON

ST

RU

CT

IO

N

MA

T

/15 /20

K. THOMAS

M. TIPPING

E3.0

AS NOTED

EL

EC

TR

IC

AL

D

ET

AI

LS

IS

SU

ED

F

OR

A

DD

EN

DU

M

NO

. 1

MA

T

/06 /20

E1.0.pdf
Sheets and Views
E1.0
E3.0.pdf
Sheets and Views
E3.0

File details come from the government source that posted it. Updated .