20200218 Response to Draft CDRL Questions.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Request for Information: Gunnery Training Systems, Business Strategy
Solicitation number
ACC-ORL-18-GUNNERY-RFI
Issued by

About this file

This document contains a Request for Information from the U.S. Army regarding potential acquisition strategies for gunnery training systems. The Army is seeking recommendations on contracting vehicles and approaches to achieve efficiencies across programs for Abrams, Bradley, Stryker, Mobile Protected Firepower, and Next Generation Combat Vehicle training systems from fiscal years 2020 through 2027. Suggestions are requested on contract types including indefinite-delivery/indefinite-quantity contracts and cost-plus arrangements. Responses are due no later than 15 days after release and should not exceed 10 pages excluding the cover sheet. The Army intends to obligate between $100 million and $500 million over the life of the proposed contract.

View the file

Other files

File Type Posted
20200429 Response to Draft CDRL Questions.xlsx XLSX spreadsheet
20200429 Response to Draft SOW Questions.xlsx XLSX spreadsheet
USMC LAV-25 TECH REFRESH SOW - VER 1.5 6 April 20.docx DOCX document
LAV-25 AGTS Tech Refresh CDRL Report 6Apr2020.rtf RTF text file
20200214 Response to Draft SOW Questions.xlsx XLSX spreadsheet
20200214 Response to Draft SOW Questions.xlsx XLSX spreadsheet
DRAFT_GTS_Abrams_CDRL_Report 7 Jan 2020.pdf PDF
DRAFT_GTS_BASE_CDRL_Report.pdf PDF
DRAFT_GTS_Bradley_COFT_CDRL_Report 7 Jan 2020.pdf PDF
DRAFT_GTS_Stryker_MGS_AGTS_CDRL_Report 7 Jan 2020.pdf PDF
Gunnery Tech Refresh_Overarching_Statement_Of_Work 25 November 19.docx DOCX document
Stryker MGS AGTS GunManUpg Rev K B001.pdf PDF
US Army M1A2 SEP PIDS Rev N 17Dec18.pdf PDF
US Army M1A1 C-AGTS SS Rev F 17Dec18.pdf PDF
PRF-PT-00514_revJ_Bradley-COFT System Spec.pdf PDF
Abrams_Tech_Refresh_Statement_Of_Work_9 October 19 JTB.docx DOCX document
Stryker_MGS_Tech_Refresh_SOW 9 Oct 19 JTB.docx DOCX document
Bradley_COFT_Tech_Refresh_SOW_9 October 19 JTB.docx DOCX document
Directions_to_Cp_Pendleton_Virtual_Trainers.pdf PDF
Direction_to_Ft_Benning_Virtual_Trainers.pptx PPTX presentation
Industry_Day_Schedule_20190717_Pendleton.docx DOCX document
Contractor_Security_Vetting_v1_052418.pdf PDF
Industry_Day_Schedule_20190717_Benning.docx DOCX document
Contractor_Security_Vetting_v1_052418.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Doc ReferenceCDRL ReferenceSOW ReferenceDID ReferenceReference Text (if applicable)QuestionGovernment Response
Draft - Abrams, Bradley, & Stryker CDRL ReportsA00G, A00HSOW 3.5DI-NDTI-80603A
DI-NDTI-80809BIPAT/PQT/OSATIs it the governments intent to require all 3 Test Procedures (IPAT and PQT seem to be similar test procedures)?Yes. The PQT is a functional test of production systems, which is a separate event from the IPAT of new upgrades or systems. The PQT has been removed from the Bradley CDRLs since there are no production systems as part of that effort.
Draft - Abrams, Bradley, & Stryker CDRL ReportsA00GSOW 3.5DI-NDTI-80603A
BLOCK 12: SHALL BE DUE 20 DAYS PRIOR TO THE TEST READINESS REVIEW.Is the due date (20 days prior to TRR) the same for both IPAT and OSAT ATP?Yes. OSAT procedures are a subset of the IPAT procedures.
Draft - Abrams, Bradley, & Stryker CDRL ReportsA00I, A00L, B00ASOW 3.6.1DI-FACR-80966

DI-MGMT-80441C

DI-ADMN-80925AIs Contractor Format acceptable for these CDRLS?Contractor format is not acceptable per the DIDs.
Draft - Abrams, Bradley, & Stryker CDRL ReportsC004SOW 3.3.2.3DI-TMSS-80527CCOTS MANUALS SHALL BE INCLUDED AS A VOLUME OF THE SMM.Can the Government clarify if the intent for COTS manuals is to submit in both this and the SMM?COTS Manuals will be submitted as a separate CDRL. The SMM DD1423s have been updated to remove the reference to the COTS Manuals.
Draft - Stryker CDRL ReportC002SOW 3.3.2.2DI-ADMN-80925ACan the Government provide an example of what would initiate an update to the Stryker Training Material for a tech refresh with no training courses.For example: different power up procedures.
Draft - Abrams, Bradley, & Stryker CDRL ReportsA001, A002, A003SOW 3.1

SOW 3.1.2

SOW 3.1.3 DI-MGMT-80227

DI-MGMT-81861A

DI-MGMT-81651Can the Government verify the correct classification for distribution was selected? Contractor believes this should be either B, E, or F.The Government has verified this is the correct distribution.
Draft - Bradley CDRL ReportA009SOW 3.1.8
SOW 3.2.7DI-MGMT-81605Can the Government provide the APP code? Contractor believes this should be listed as either A or N/A.The DD1423 has been updated to reflect the App Code.
Draft - Base CDRL ReportA001, A002, A003, A004SOW 3.1 & 3.7

SOW 3.1.2

SOW 3.1.3

SOW 3.1.3 DI-MGMT-80227

DI-MGMT-81861A

DI-MGMT-81468

DI-MGMT-81651Can the Government verify the correct classification for distribution was selected? Contractor believes this should be either B, E, or F.The Government has verified this is the correct distribution.
Draft - Base CDRL ReportA006, A00U, A00AH, A00AI, C006SOW 3.1.5DI-SESS-80858CCan the Government provide SOW references for the associated CDRLs?The DD1423s have been updated to reflect the SOW references.
Draft - Base CDRL ReportB00DSOW 3.2.3.2DI-IPSC-81442ABlock 9 is empty. Can the government clarify if this should be Distribution D?The DD1423 has been updated to reflect Distribution D.
Draft - Base, Abrams & Stryker CDRL ReportsA004, A007SOW 3.1.5.8DI-SESS-81022DConfiguration Audit Summary Report and CertificationQuestion: Will the government provide the LT portal guides as a document provided during the proposal so that contractors have an opportunity to access the repository in order to assess the level of effort to produce the requested plan?No, LT2 documentation can be accessed by obtaining an account and logging in to the LT2 website at https://www.lt2portal.mil/
Draft - Base, Abrams & Stryker CDRL ReportsA004, A007SOW 3.1.5.8DI-SESS-81022DConfiguration Audit Summary Report and CertificationQuestion: In Physical Configuration Audit (PCA) in paragraph a. it states that the IUID data shall be entered into the central registry for accountability/visibility. Is data entry into the registry the responsibility of the contractor, or will the contractor provide the information to the government for a government representative to enter?It is the responsibility of the contractor to enter the IUID data into the registry.
Draft - Base CDRL ReportA008SOW 3.1.5.8 and 3.2.1.4DI-SESS-81646BConfiguration Audit PlanQuestion: The government expects the contractor to use an automated internal configuration management process to monitor, update and control all configuration documentation, physical media, and physical parts representing or comprising the system configuration items (CIs). Will the government provide more criteria about this expectation?See SOW Section 3.1.5
Draft - Base CDRL ReportA008SOW 3.1.5.8 and 3.2.1.4DI-SESS-81646BConfiguration Audit PlanQuestion: Does the government intend to have access to the contractors automated system?See SOW Paragraph 3.1.5.4
Draft - Base CDRL ReportA008SOW 3.1.5.8 and 3.2.1.4DI-SESS-81646BConfiguration Audit PlanQuestion: Would it be acceptable for the contractor to produce one overall AGTS configuration management plan that addresses all variants within one combined document? This document could reference all CDRL identifiers.Yes
Draft - Bradley & Abrams CDRL ReportsB009,B00CSOW 3.3.1DI-SESS-81759A,
DI-SESS-81758ALogistics Product Data Summaries, Logistics Product DataQuestion: Is the contractor expected to focus the LPD on just the upgraded/added components, or on the entire system?The LPD is required for all new systems or upgraded/new components of existing systems.
Draft - Abrams & Bradley CDRL ReportsB009,B00CSOW 3.3.1DI-SESS-81759A,
DI-SESS-81758ALogistics Product Data Summaries, Logistics Product DataQuestion: Since contractor format is not acceptable but deliverable must be submitted in Excel, it is assumed that the existing structure shall be reused by the contractor. Will the government provide, as part of the proposal, existing LPD for contractor assessment of format, and structure?Format required is Excel. There is no existing structure. The Contractor is free to tailor the structure of the Excel product so long as the minimum data elements are provided to complete and process the LSA-030, Indentured Parts List, LSA-040, Authorization List Summary Report, and LSA-080 Bill of Materiels.
Draft - Abrams & Bradley CDRL ReportsB009,B00CSOW 3.3.1DI-SESS-81759A,
DI-SESS-81758ALogistics Product Data Summaries, Logistics Product DataQuestion: The DD1423-1 references specific minimum data elements required. Will the government provide the list of those specific data elements as part of the proposal, so that the contractor may make a fair estimate of the scope of effort to satisfy this requirement?The minimum data elements needed, for each report, are found in industry standard TA-HB-0007-1, Logistics Product Data Reports Handbook. The Government will not provide a copy of this standard with the RFP. The Contractor may purchase a copy at https://www.sae.org/standards/content/tahb0007_1/

The Contractor can also find additional information regarding each of the LPD elements contained in the reports using GEIA-STD-0007B, Logistics Product Data and GEIA-HB-0007B, Logistics Product Data Handbook. The Government will not provide a copy of these standards with the RFP. The Contractor may purchase a copy at https://www.sae.org/standards

Draft - Abrams CDRL ReportB00DSOW 3.3.1DI-SESS-81759ALogistics Product Data SummariesQuestion: Is the contractor expected to focus the LPD Summaries on just the upgraded/added components, or on the entire system?The LPD Summaries are requried for all new systems or upgraded/new components of existing systems.
Draft - Abrams CDRL ReportB00DSOW 3.3.1DI-SESS-81759ALogistics Product Data SummariesQuestion: Since contractor format is not acceptable but the CDRL must be delivered in Excel format, it is assumed that the government has a specific structure that should be utilized. Will the government provide, as part of the proposal, the existing Summaries for contractor assessment of format and structure?Format required is Excel. There is no existing structure. The Contractor is free to tailor the structure of the Excel product so long as the minimum data elements are provided to complete and process the LSA-030, Indentured Parts List, LSA-040, Authorization List Summary Report, and LSA-080 Bill of Materiels.
Draft - Abrams CDRL ReportB00DSOW 3.3.1DI-SESS-81759ALogistics Product Data SummariesQuestion: is there additional information or expected criteria that the government can provide concerning the LSA-030, the LSA-040 and the LSA-080?The Government will not provide any additional information concerning the LPD Summaries. The expected criteria for each report are found in industry standard TA-HB-0007-1, Logistics Product Data Reports Handbook. The Government will not provide a copy of this standard with the RFP. The Contractor may purchase a copy at https://www.sae.org/standards/content/tahb0007_1/

The Contractor can also find additional information regarding each of the LPD elements contained in the reports using GEIA-STD-0007B, Logistics Product Data and GEIA-HB-0007B, Logistics Product Data Handbook. The Government will not provide a copy of these standards with the RFP. The Contractor may purchase copies at https://www.sae.org/standards Draft - Bradley CDRL Report C001 SOW 3.3.3.2 DI-ADMN-80925A Revisions to Existing Govt Docs - System Maint. Manual Bradley COFT M/I Question also applies to:

GTS Bradley COFT - CDRL C002, C003, C005, C006, C007, C008 GTS Abrams - CDRL C001, C002, C003 GTS Base - CDRL C001, C002, C003, C004, C006 GTS Stryker - CDRL C001, C002

Question: Will the government provide all current manuals as part of the proposal so that the contractor may assess the current format and structure, in order to better define the scope of the changes to these existing documents?Existing program reference documents will be provided as part of the draft RFP. There are no existing manuals associated with the base SOW.
Draft - Bradley CDRL ReportC001SOW 3.3.3.2DI-ADMN-80925ARevisions to Existing Govt Docs - System Maint. Manual Bradley COFT M/IQuestion also applies to:

GTS Bradley COFT - CDRL C002, C003, C005, C006, C007, C008 GTS Abrams - CDRL C001, C002, C003 GTS Base - CDRL C001, C002, C003, C004, C006 GTS Stryker - CDRL C001, C002

Question: Will the government provide all current manuals and training materials as part of the proposal so that the contractor may assess the current format and structure, in order to better define the scope of the changes to these existing documents?Existing program reference documents will be provided as part of the draft RFP. There are no existing manuals associated with the base SOW.
Draft - Bradley CDRL ReportC001SOW 3.3.3.2DI-ADMN-80925ARevisions to Existing Govt Docs - System Maint. Manual Bradley COFT M/IQuestion also applies to:

GTS Bradley COFT - CDRL C002, C003, C005, C006, C007, C008 GTS Abrams - CDRL C001, C002, C003 GTS Base - CDRL C001, C002, C003, C004, C006 GTS Stryker - CDRL C001, C002

Question: There is an identified CDRL for revisions to training materials at the GTS Base and Stryker levels. There is no identified separate CDRL for Bradley or Abrams. Is this an oversight, or should the contractor plan to incorporate updates for Abrams and Bradley training into the GTS Base CDRL?For the initial Delivery Orders, the only training material updates to be performed are for Stryker Operator Training Materials (Stryker CDRL C002), Bradley Maintenance Training Materials (Bradley CDRL C005), and USMC Operator Training Materials (CDRLs TBD).
Draft - Base CDRL ReportA00QSOW 3.2.6.2DI-SESS-81497AReliability and Maintainability Predictions ReportQuestion: Is the contractor expected to perform RAM on just the upgraded/added components, or on the entire system?The RAM predictions reports are requried for all new systems or upgraded/new components of existing systems.
Draft - Base CDRL ReportA00QSOW 3.2.6.2DI-SESS-81497AReliability and Maintainability Predictions ReportQuestion: Will the government provide, as part of the proposal, existing RAM data for contractor assessment of format, and structure?No
Draft - Base CDRL ReportA002SOW 3.1.2DI-MGMT-80227Integrated Program Management Report (IPMR) - Format 6What is Format 6 for DI-MGMT-80227? Says Contractor Format is acceptable in Box 16, #6. Can Government provide more detailed description of "Format 6?"DID DI-MGMT-80277 is associated with CDRL A001 not A002. There is no Format 6 called out for CDRL A001.
Draft - Base CDRL ReportA005SOW 3.1DI-MGMT-81861AIntegrated Program Management Report (IPMR) - Format 6What is Format 1 for DI-MGMT-81861A? Says Contractor Format is acceptable in Box 16, #6. Can Government provide more detailed description of "Format 6?"Check DID DI-MGMT-81861A, section 1.1.6 and 3.7. Format 6 defines and contains the contractor's Integrated Master Schedule.
Draft - Base CDRL ReportB001SOW 3.2.1.1, 3.2.2.1 & 3.2.3.1DI-ADMN-80925ARevisions to Existing Government Documents (System Specs)Question also applies to:

GTS Base - CDRL B002, B003 GTS Abrams - CDRL B001, B002, B003 GTS Bradley - CDRL B001, B002 GTS Stryker - CDRL B001, B002

Question: What version of DOORS is going to be used? Is there a preferred data format/file for data import?As of this response, the Government is using DOORS version 9.6. The preferred data file format is .dma
Draft - Base CDRL ReportB006SOW 3.2.3.2DI-ADMN-80925ARevisions to Existing Government Documents (SW Documentation)Please clarify box 16, #3. Due 10 Days Before? 10 Days After? At OSAT?The DD1423 has been updated.
Draft - Base CDRL ReportB00ISOW 3.2.8DI-SDMP-81493AProgram-Unique Specification DocumentsSOW states, "The Contractor shall create new documents when required data documents were not included in the GFI." Will the Government provide a list of the data documents that are required for this effort, but will not be provided for update as a part of this effort?This statement refers to the situation where the contractor has to produce new documentation for system upgrades or new development. The SOW has been updated to clarify.
Draft - Abrams CDRL ReportC003SOW 3.3.2.1DI-ADMN-80925ARevision to Existing Government Documents (M1A2 Training System Utilization Handbook)Question also applied to Bradley CDRL C003.
For the copy of the TSUH being delivered to the system, will this version be delivered with or without change tracking?The hard copies delivered to the systems do not require change tracking. The DD1423s have been updated to clarify this.
Draft - Bradley CDRL ReportA003SOW 3.1.3DI-MGMT-81651Technical Report-Study/ServicesSame question for Stryker CDRL A003
The Title for the DI doesn't align with the SOW reference 3.1.3 Financial Management. Please clarifyThe DD 1423s have been updated to reflect the title: Contractor Invoicing & Payment Report.
Draft - Bradley CDRL ReportA00ISOW 3.3.1.1DI-PSSS-80134BProposed Spare Parts ListWhy is the due date for this CDRL 20 days prior to FIPR, but 20 days prior to CDR for the Abrams version of this CDRL?

Similar questions regarding:

Bradley CDRL B005, B006, B007, B008, B009

Stryker CDRL A00IAbrams, Bradley, and Stryker CDRLs all state 20 days prior to FIPR.
Draft - Stryker CDRL ReportB003SOW 3.2.3.2DI-ADMN-80925ARevision to Existing Government Documents (Stryker MGS SW Product End Items)Why are the Stryker/Abrams SW Product End Item due at OSAT, but the Bradley equivalent (SVD) due 5 days prior to TRR?The SVD combines both the requirements for the CSPEI and CRISD (Abrams/Stryker). The software installation instructions are due 5 days prior to TRR so the instructions can be verified during testing. This is the same due date as the CRISDs.

_x000D__x000D_

_x000D__x000D_

_x000D__x000D_

_x000D__x000D_

_x000D__x000D_

_x000D__x000D_

File details come from the government source that posted it. Updated .