Part_7_Corrigenda-July17.pdf

PDF 18 KB Posted

Attached to
Drydock Repair Services in the Hawaii Region
Solicitation number
AB-133M-17-RQ-0857
Issued by

About this file

14

View the file

Other files

File Type Posted
Combined_Synopsis_Solicitation_V4.pdf PDF
Amendment_0006.pdf PDF
Document_3,_Statement_of_Work_for_Task_Order_0001_Sette_Drydock_V1.pdf PDF
Amendment_0005.pdf PDF
AD-574-001_A-Frame_Strl_Arr_&_Dets_01_Rev_-.DWG DWG drawing
AD-574-001_A-Frame_Strl_Arr_&_Dets_03_Rev_-.DWG DWG drawing
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_02_Rev_-.DWG DWG drawing
HI-574-001_Rev_A_Deck_Machinery_A-Frame_Arrgt_Dtls.pdf PDF
HI-574-002_2.TIF TIF image
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_04_Rev_-.DWG DWG drawing
HI_575_01_Electric_Drive_Oceanographic_Winch.pdf PDF
HI-574-002_4.TIF TIF image
HI-574-002_3.TIF TIF image
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_06_Rev_-.DWG DWG drawing
HI-574-002_5.TIF TIF image
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_03_Rev_-.DWG DWG drawing
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_05_Rev_-.DWG DWG drawing
Amendment_0004.pdf PDF
GU_KA_581_02_MAN_ANCHOR_WINDLASS_AND_CAPSTAN.pdf PDF
HI-574-001_1.TIF TIF image
HI-574-002_Rev_A_Deck_Machinery_J-Frame_Arrgt_Dtls.pdf PDF
AD-574-001_A-Frame_Strl_Arr_&_Dets_02_Rev_-.DWG DWG drawing
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_01_Rev_-.DWG DWG drawing
Part_7_e-July17.pdf PDF
Part_7_Guide_to_Colors.pdf PDF
243-6233870.pdf PDF
OS_556_01_CENTRAL_HYDRAULICS_SYSTEM_INSTALLATION.pdf PDF
OS-163-623356_1.pdf PDF
HI_243_02_Stern_Tube_Bearings_&_Seals.pdf PDF
s2906_VESSEL_ARC_WELDING.pdf PDF
Part_1_Ships_e-Apr17.pdf PDF
OS-528-6233824_4.pdf PDF
S2603A_GROUND_TACKLE.pdf PDF
HI_243_01_Shafting_Details.pdf PDF
Part_7_Corrigenda-July17.pdf PDF
CFR-2005-title46-vol4-chapI-subchapJ.pdf PDF
Part_2_e-Jan17.pdf PDF
SVR_Part_5A&B_e-July17.pdf PDF
Part_1_Ships_Guide_to_Colors.pdf PDF
436-6233675_2.pdf PDF
SVR_Guide_to_Colors.pdf PDF
OS-528-6233824_2.pdf PDF
CFR-2012-title46-vol2-chapI-subchapF.pdf PDF
OS-085-002.pdf PDF
OS-163-6233563_2.pdf PDF
AMC-000-3C_GENERAL_REQUIREMENTS_FOR_SMALL_CONTRACT_SHIP_REPAIRS.pdf PDF
IMPLEMENTATION_AND_CONDUCT_OF_CHECK_POINTS.pdf PDF
635-2_THERMAL_INSULATION_FOR_COMPARTMENTS.pdf PDF
S1402_TERRAZZO_DECK_COVERING_INSTALLATION.pdf PDF
Part_7_Notice_1.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RULES FOR

SURVEY AFTER CONSTRUCTION

CORRIGENDA/EDITORIALS – 1 February 2017 CORRIGENDA/EDITORIALS – 1 July 2017

Page No. Paragraph Comments Part 7 Rules for Survey After Construction Chapter 3 Hull Surveys Section 1 Requirements for Internal Examinations of All Vessels

34 7-3-1/13 Notation “SH, SHCM” to read “SH, SHCM”.

Part 7 Rules for Survey After Construction Chapter 3 Hull Surveys Section 2 Vessels for Unrestricted Service

79 7-3-2/5.7.3(b) Reference “7-3-2/5.1.7(d)” to read “7-3-2/5.1.7(e)”.

Part 7 Rules for Survey After Construction Appendix Section 2 Surveys of Voyage Repairs to Hull Structure

285 7-A-1/3.1 Renumber second instance of “3.1.8” as “3.1.9”.

Part 7 Rules for Survey After Construction Appendix Section 15 Report on Thickness Measurement of Bulk Carriers – Double Skin (CSR and Non-CSR Vessels)

608 7-A-15/Figure 4 Title of table for Items 36 to 40 to read “REPORT ON TM6-DSBC”.

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2017 1

File details come from the government source that posted it. Updated .