Document_3,_Statement_of_Work_for_Task_Order_0001_Sette_Drydock_V1.pdf

PDF 2 MB Posted

Attached to
Drydock Repair Services in the Hawaii Region
Solicitation number
AB-133M-17-RQ-0857
Issued by

About this file

Document 3, Statement of Work for Task Order 0001 Sette Drydock V1

View the file

Other files

File Type Posted
Combined_Synopsis_Solicitation_V4.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
AD-574-001_A-Frame_Strl_Arr_&_Dets_01_Rev_-.DWG DWG drawing
AD-574-001_A-Frame_Strl_Arr_&_Dets_03_Rev_-.DWG DWG drawing
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_02_Rev_-.DWG DWG drawing
HI-574-001_Rev_A_Deck_Machinery_A-Frame_Arrgt_Dtls.pdf PDF
HI-574-002_2.TIF TIF image
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_04_Rev_-.DWG DWG drawing
HI_575_01_Electric_Drive_Oceanographic_Winch.pdf PDF
HI-574-002_4.TIF TIF image
HI-574-002_3.TIF TIF image
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_06_Rev_-.DWG DWG drawing
HI-574-002_5.TIF TIF image
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_03_Rev_-.DWG DWG drawing
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_05_Rev_-.DWG DWG drawing
Amendment_0004.pdf PDF
GU_KA_581_02_MAN_ANCHOR_WINDLASS_AND_CAPSTAN.pdf PDF
HI-574-001_1.TIF TIF image
HI-574-002_Rev_A_Deck_Machinery_J-Frame_Arrgt_Dtls.pdf PDF
AD-574-001_A-Frame_Strl_Arr_&_Dets_02_Rev_-.DWG DWG drawing
AD-574-002_Deck_Machinery_J-Frame_Arr_&_Dets_01_Rev_-.DWG DWG drawing
Part_7_e-July17.pdf PDF
Part_7_Guide_to_Colors.pdf PDF
243-6233870.pdf PDF
OS_556_01_CENTRAL_HYDRAULICS_SYSTEM_INSTALLATION.pdf PDF
OS-163-623356_1.pdf PDF
HI_243_02_Stern_Tube_Bearings_&_Seals.pdf PDF
s2906_VESSEL_ARC_WELDING.pdf PDF
Part_1_Ships_e-Apr17.pdf PDF
OS-528-6233824_4.pdf PDF
S2603A_GROUND_TACKLE.pdf PDF
HI_243_01_Shafting_Details.pdf PDF
Part_7_Corrigenda-July17.pdf PDF
CFR-2005-title46-vol4-chapI-subchapJ.pdf PDF
Part_2_e-Jan17.pdf PDF
SVR_Part_5A&B_e-July17.pdf PDF
Part_1_Ships_Guide_to_Colors.pdf PDF
436-6233675_2.pdf PDF
SVR_Guide_to_Colors.pdf PDF
OS-528-6233824_2.pdf PDF
CFR-2012-title46-vol2-chapI-subchapF.pdf PDF
OS-085-002.pdf PDF
OS-163-6233563_2.pdf PDF
AMC-000-3C_GENERAL_REQUIREMENTS_FOR_SMALL_CONTRACT_SHIP_REPAIRS.pdf PDF
IMPLEMENTATION_AND_CONDUCT_OF_CHECK_POINTS.pdf PDF
635-2_THERMAL_INSULATION_FOR_COMPARTMENTS.pdf PDF
S1402_TERRAZZO_DECK_COVERING_INSTALLATION.pdf PDF
Part_7_Notice_1.pdf PDF
Part_1_Ships_e-May17.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA SHIP OSCAR ELTON SETTE

SPECIFICATION FOR DRYDOCK REPAIRS

FY2018

Developed By: Kenn Asato

(Rev-0, 4 August 2017)

NOAA SHIP OSCAR ELTON SETTE DRYDOCK AVAILABILITY FY2018

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ...................................................................................................................................................... iii Critical Inspection Items Guidence ........................................................................................................................... v Principal Characteristics .......................................................................................................................................... ivi General Requirements WORK ITEM 1: Drydocking WORK ITEM 2: Temporary Services WORK ITEM 3: Sea/Dock Trials; Perform WORK ITEM 4: Propellers; Remove, Inspect/Service, & Reinstall WORK ITEM 5: Rudders; Remove, Inspect/Service, & Reinstall WORK ITEM 6: Protective Coverings; Install & Remove WORK ITEM 7: Weight Control; Perform WORK ITEM 8: ADCP Transducer; Install WORK ITEM 9: Lodging; Provide WORK ITEM 10: Underwater Body Preservation WORK ITEM 11: Underwater Body Inspection and Repairs WORK ITEM 12: ABS Inspection WORK ITEM 13: Freeboard Preservation WORK ITEM 14: Replace Hull Annodes WORK ITEM 15: Service Elinca System WORK ITEM 16: Inspect Ground Tackle WORK ITEM 17: Overhaul Anchor Windlass WORK ITEM 18: Clean Oily Waste Tank WORK ITEM 19: Clean and Inspect Tanks WORK ITEM 20: Miscellaneous Steel Repairs WORK ITEM 21: Miscellaneous Piping Repairs WORK ITEM 22: Open and Inspect Pumps WORK ITEM 23: Overhaul Pumps WORK ITEM 24: Main Motor Thrust Bearings, Inspect, Clean, & Oil Change WORK ITEM 25: Bow Thruster Inspection WORK ITEM 26: Fuel Oil Purifier Installation WORK ITEM 27: Evaporator Installation WORK ITEM 28: TSG Piping Renew WORK ITEM 29: J-Frame Overhaul WORK ITEM 30: J-Frame Controller Installation WORK ITEM 31: A-Frame Overhaul WORK ITEM 32: Galley Drain Piping Renew WORK ITEM 33: Forward Mess Decking Renew WORK ITEM 34: Aft Working Deck, Non Skid WORK ITEM 35: Longline Pit Overhead Preservation WORK ITEM 36: Install Fire Detection System WORK ITEM 37: Transducer Maintenance WORK ITEM 38: Crane Boom Replacement WORK ITEM 39: Stuffing Tubes WORK ITEM 40: Main Control Doors WORK ITEM 41: Trawl House Railings and Engine Mounts Renew WORK ITEM 42: Trawl Winches & Net Reel Overhaul WORK ITEM 43: Bunk Conversion iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

*Government-loaned property, which shall be returned to the Port Engineer upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or EEB v (Rev-0)

CRITICAL INSPECTION ITEMS (CHECKPOINTS) GUIDENCE

Critical Inspection reports shall be completed within the first 25% of the availability contract period. Submit all CIRs and CFRs for routine inspections and tests within 24 hours after completing the specified inspections and tests. Submit CFRs for unexpected conditions within 24 hours of discovery.

Report contents. Include the following details, at a minimum, in each report, to facilitate the contract-change process for CIR’s and CFR’s:

• Sequential number to indicate order of submission.

• CLIN and title to which the condition-found report relates

• A clear statement, definition, and description of the condition found, including but not limited to frame numbers, part numbers, materials, and dimensions as appropriate.

• A proposed or recommended repair to correct the defective condition, including but not limited to frame numbers, part numbers, materials, and dimensions as appropriate.

• When measurements are taken the Contractor shall, at a minimum, list the measurements taken, list the allowable tolerances and dimensions, and perform the required calculations (e.g., running clearances, interference fit tolerance, etc…), and provide a PASS/FAIL determination for each measurement along with a repair recommendation.

• Indication whether the report requires NOAA action or if it is provided “For Information Only”. If action is required, indicate the time and date when the NOAA response is required in order to complete the action within the specified contract performance period. If the action cannot be completed within the specified contract period, so state.

• When NOAA action is required, indicate the response time needed to avoid a contract extension and how many additional days past the scheduled completion date the added work will require.

• • Space on the form for the NOAA designated representative to make comments.

• Signature of the Contractor Ship Superintendent, including date of signature and condition found report submission.

vi (Rev-0)

PRINCIPAL CHARACTERISTICS

T-AGOS

PHYSICAL CHARACTERISTICS

Length Overall 224'

Length between Perpendiculars 194'

Maximum Draft 15'-1"

Maximum Beam 44'-11”

Height of Mast ABV 15’-1” WL 72'-2”

Full Load Displacement 2298 long tons

Displacement, Light Ship 1493 long tons

MACHINERY CHARACTERISTICS

Main Propulsion Four Caterpillar Model D398B, 2 General Electric Model DL58X170535 w/ SCR drive

Bow Thruster 550 HP

Propulsion Shaft Two

Ship's Emergency Generator 250 KW Kato / 3408 Caterpillar

1 (Rev-0)

Specific General Requirements (See MOC-000-1G for more Information)

1. SCOPE

1.1 Intent. This specification invokes general requirements for conducting vessel repairs performed by commercial contractors for NOAA vessels. These general requirements apply to all work items contained in the original contract and all modifications issued by the Contracting Officer.

2. REFERENCES

NOAA DRAWINGS

None

NOAA PUBLICATIONS

NOAA Standard Specification S2906, Arc Welding of Waterborne Vessels NOAA Std. Spec S4800-2, Piping Systems, General Requirements

OTHER REFERENCES

American Bureau of Shipping "Rules for Building and Classing Steel Vessels” Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health

Standards U.S. Coast Guard "Subchapter F - Marine Engineering,” 46 CFR 50 through 46 CFR 64 U.S. Coast Guard "Subchapter J - Electrical Engineering,” 46 CFR 110 through 46 CFR 113 IEEE Std. 45-1998, "IEEE Recommended Practice for Electric Installations on Shipboard” 40 CFR 61, Subpart M, sections 61.140 through 61.157

29 CFR 1915.1001

DEFINITIONS

Wherever used in this specification and in all other work items in this contract, the following definitions of terms apply:

Inspect. Visually evaluate the specified surface, item, part, or component for evidence of contamination, damage excessive wear, scoring, and any other condition which could interfere with the proper operation or functioning of the surface, item, part or component.

Install. Place the specified item in position for service and make all connections needed to insure proper use, service, appearance, and operation. Except as may otherwise be specified, this shall include the following:

• Provide new or modify existing foundations. Securely mount equipment and components using new fasteners. Align connected equipment and components to meet manufacturers’ specifications.

• Make all electrical connections. Provide new electric cable runs between controllers and motors of new equipment. Existing cables may be reused in other applications, except where the existing cables are too

2 (Rev-0) short to make connections. Renew cables, which are too short and less than 20 feet long. Junction boxes may be used to increase the cable run length where the existing cable runs are longer than 20 feet.

• Modify new piping to suit the new equipment, including the rerouting of existing piping and adding of new piping as needed to properly connect equipment and components. Piping modifications greater than five feet from the equipment are not required. New piping is required only to the extent necessary to accommodate modifications of existing piping.

Piping. A system of pipe, tube, elbows, tees, valves, couplings, and other pipe fittings. Unless otherwise specified in the detailed item description, all piping systems and components shall comply with material and installation requirements of reference 2.8.

Rebuild. Disassemble, clean, inspect, repair (including renewal of all parts needed), reassemble, test, and calibrate the specified part, component, system, or machine to restore it to a condition of reliability equivalent to a new part, component, system, or machine. Components and parts shall meet the manufacturer's applicable rebuild specifications.

Reinstall. Return the same item, which was previously removed, to its previous configuration and location.

Renew. Provide and install a new item as replacement for an existing item previously removed or to be removed.

The new item must be the same as or comparable in material, performance and configuration to the item removed.

Replace. Same as "renew,” defined above.

Touch-Up. Preservation operations on cumulative surface areas less than 10 percent of the total area (e.g., bilge, tank, space, etc.) being preserved, with no individual area greater than 10 square feet. Included under touch-up operations are new and disturbed surfaces of less than 10 square feet. Except for potable water, reserve feedwater, or freshwater drain collecting tanks, the documentation requirements for critical-coated surfaces are waived for these touch-up areas, and the requirements for cleanliness, surface preparation, surface profile, conductivity/chloride measurement, and coating inspection consisting of dry film thickness (DFT), holidays, and cleanliness shall be verified by the accomplishing activity prior to paint applications.

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with MOC-631-2D unless otherwise specified by the COR.

3.3.1 Brand name approval. See COR for guidance.

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with MOC-631-2D unless otherwise specified by the COR.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with S2906 unless otherwise specified by the COR.

3 (Rev-0)

3.5 HW disposal. The Contractor shall be considered the generator of all hazardous wastes, and shall manage hazardous wastes in accordance with its management plans, policies, and instructions. Handle all hazardous wastes generated during the execution of this contract in accordance with all Federal, state, and local regulations.

Notify the ship’s hazardous waste coordinator prior to any transfers of hazardous wastes from ship to shore.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required are to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

4.2 Maintain a Quality Control (QC) TEST AND INSPECTION PLAN applicable to all work items, including all additional work items which are authorized by the Contracting Officer. Update QA TEST AND INSPECTION PLAN weekly and provide a copy to the COR 24-hours prior to the scheduled weekly progress meeting. Include the following minimum information for each work item and additional work item:

4.2.1 Specification item and paragraph number

4.2.2 Component/Equipment name

4.2.3 Test or Inspection description

4.2.4 Acceptance Criteria

4.2.5 Quality Control Inspection Report

4.2.6. Maintain a separate Test Schedule. Update Test Schedule weekly and provide a copy to the COR 24-hours prior to the scheduled weekly progress meetings.

4.3. Daily Safety and Housekeeping Inspection

4.3.1 Conduct a daily safety and housekeeping inspection of all spaces affected by Contractor work.

4.3.2 The inspection shall be conducted by the Contractor's Safety Officer and the COR.

4.3.3 Within 4 hours after the inspection, submit a written report to the COR documenting all discrepancies and corrective action to be taken.

4.4 Provide Monthly Report showing EPA compliance.

4 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name Hull # Work Item # Work Item Title

Location of Work (incl. frame #’s) Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.

threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector Signature Cert. # Date / Time

5 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE &

TIME

ACTIVITY

(Surface preparation, primer coat, barrier coat, top coat, etc…)

LOCATION

(Frame & Deck, relation to equipment, etc.)

TEMPERATURE

% REL.

HUMID-

ITY DEW

PT. SURFACE AMBIENT

ΔT

| DP -

Surface |

6 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Location of Work (Frame References) Area (sqft)

SURFACE PREPARATION METHOD

PROFILE ACHIEVED (mils) Min Max Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________

7 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

SURFACE PREPARATION METHOD

PROFILE ACHIEVED (mils) Min Max Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils

Reading: _____ mils _____ mils _____ mils _____ mils _____ mils Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):

_____ mils _____ mils _____ mils _____ mils _____ mils

8 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15

DATE TEST LOCATIONS CONDUCTIVITY

(microsiemens/cm)

9 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Coating Mfg Product Name Batch # Induction Time

Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL

READING (BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5

Overall Avg. DFT

ADJUSTMENTS

1 Avg. BMR Deviation 3 Before

Adjustments After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled) Average DFT

10 (Rev-0)

WORK ITEM 1: Drydocking; Perform

1.1 Intent. This work item describes the requirements for the Contractor to drydock and undock the cutter and perform various drydocking-related tasks.

1.2 Government-furnished property.

None.

2. REFERENCES

NOAA DRAWINGS

Ship’s Drawing OS-085-002; Docking Drawing

NOAA PUBLICATIONS

NOAA Standard Form S0700; Docking Report NOAA Standard Specification S0700-3; Drydock Standards for NOAA Ship

Availabilities NOAA Standard Specification 0100; Conduct of Checkpoints

OTHER REFERENCES

American Bureau of Shipping, Rules for Building and Classing Steel Vessels

3. REQUIREMENTS

3.1 General.

3.1.1 Checkpoint. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective

11 (Rev-0) material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall remove all interferences in way of specified work, as necessary, without regard to whether interferences are listed in this statement of work; restore all removed interferences upon completion of the specified work. The Contractor may exercise the discretion to work around certain interferences, when possible, so long as the specified work is successfully accomplished.

3.2 Docking requirements. The Contractor shall drydock and undock the vessel, in accordance with listed ref OS-085-002 for guidance.

3.2.1 Vessel Conditions. The Contractor shall use the Condition, listed below for purposes of performing Pre-Award calculations as required.

• Displacement (LT): 2124.21

• VCG (FT ABL): 17.98

• LCG (FT aft of FWD Perpendicular): 100.1

3.2.2 Blocking position. The Contractor shall arrange keel and side blocks, as shown on the vessel's docking plan, to facilitate docking of the vessel in blocking position 2. Ensure that the minimum keel block height is 48 inches above the docking facility deck.

3.2.3 Block Inspection. Upon completion of block construction and placment, inspect blocking system with the COR. Present the COR with a list of blocks left out with justafication.

Demonstrate the marking of the Stern Reference Point and the centering devices. Prove the distance from the Stern Reference Point to the first keel block. Demonstrate that all blocks in the list of blocks to be left out are, indeed, not present. Inspect blocks for height.

3.3 Immediate work. The Contractor shall perform the docking on the day of arrival in order to perform work as quickly as possible. A pre arrival/docking conference will be held within 48 hours of arrival.

3.4 Within twenty four hours after docking. The Contractor shall begin the following:

3.4.1 Underwater body cleaning - removal of marine growth. The Contractor shall start cleaning the hull within four hours after the vessel has been docked, as specified below, to facilitate marine growth removal. Complete the hull cleaning before marine growth hardens.

3.4.2 Hull cleaning. Remove all marine growth and oxidized coatings from the entire underwater hull from the upper edge of the boot top down, including sea chest strainer plates, sea chest interiors, fairwaters, rope guards, rudder, shaft strut, sea chest, z-drive, and thruster tunnel, and zinc anodes, as applicable by water-jetting to a “WJ-4” visual surface condition, in accordance with SSPC-SP 12/NACE No. 5. Cleaning shall be supplemented with stiff bristle brushes and scrapers as necessary, to remove all visible marine growth, loose rust, loose mill scale, and loose coatings. Do not use chemical additives in the freshwater wash or scrapers on bearing surfaces or transducer faces. Take extreme care to avoid damaging or removing existing intact underwater body coating.

12 (Rev-0)

3.4.3 Protective measures. As soon as practicable after drydocking, underwater body surface cleaning, and in conjunction with work package items that involve the appendage, the Contractor shall do the following:

• Install protective covering over transducers, zinc anodes, propeller blade seals, rudder bearings, stern tube and strut bearings, spool pieces, spud wells, fin stabilizer seals and bow thrusters, as applicable.

NOTE: Transducer cover plate(s) may be provided as GFP – see Section 1.2 (Government-furnished property) of the work item in the specification package.

• Wrap all bearings and seals, and insert soft caulking material into the open ends of rudder and shaft stave bearings to prevent entry of foreign materials during surface preparation and painting procedures.

• Place drain channels in overboard discharges in use to direct discharges away from the hull. Provide and install wooden plugs or coverings in sea chest spool pieces and overboard discharges not in use to prevent entry of sandblast grit or paint.

CAUTION!: Do not remove protective covers during the drydock period except to accomplish specific work items or for inspection.

3.4.4 Interferences. The contractor shall identify interferences to the hull openings or appendages by the blocking and/or cribbing, e.g. the skeg plug location identified on the docking plan at 6 inches forward of the end of skeg, after docking it’s found to be 18 inches aft and a block cap has landed on it. Submit a CFR, including red line markup of the docking plan detailing the interference. The COR shall review CFR and provide guidance to the Contractor for any removal of blocking or caps that is required to complete production work.

3.5 Inspection requirements. Immediately following completion of hull cleaning, a joint inspection shall be performed by the Contractor and COR, the Contractor shall submit a CFR of findings within 24 hours. The CFR shall include, but not be limited too; conditions such as hull damage, coating system failure, failed welds, evidence of grounding, plating deformation, structural member deformation, zinc conditions

3.6 Fluid offload, disposal, & storage. The Contractor shall adjust tanks in order to fulfill the drydock requirements if required. Dispose of all fluids in accordance with Federal, State, and local regulations unless instructed to store the fluid by the COR.

3.7 Undocking. The dock shall be flooded or the railway lowered, as the case may be, until as many underwater openings as possible are covered without lifting the ship off the blocks. All efforts shall be made to ensure the vessel is in as similar a loading condition when docked as reasonably possible. An adequate watch shall be posted to check for leaks. If no leaks are found, and upon permission of the COR, the undocking may continue. Bow and centerline sighting marks shall be provided so that the ship may be re-landed if necessary.

3.7.1 After the ship is undocked, the contractor must submit a docking report in accordance with reference 2.2. The contractor is advised that, although the report is not required until after undocking, the information necessary to complete the report must be gathered while the ship is in drydock.

13 (Rev-0)

4. QUALITY ASSURANCE

3.3 Operational Testing. Accomplish an operational check of all new sensors and call boxes upon completion of instillation in accordance with the manufacture’s technical representative and section 095 of part. Submit a written report of the results of the all testing and inspections required by this item. The report must contain the date, time, results, and names of the witnesses.

5. NOTES

5.1 Arrival conditions. The COR will advise the Contractor of the actual tank and draft readings at the docking conference if they differ from this document, and will discuss with the Contractor any liquid loading changes necessary.

14 (Rev-0)

WORK ITEM 2: Temporary Services; Provide

1.1 Intent. This work item describes the requirements for the Contractor to provide temporary services.

1.2 Government-furnished property.

None.

2. REFERENCES

NOAA DRAWINGS

None.

NOAA PUBLICATIONS

None.

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 Checkpoints. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

15 (Rev-0)

3.1.4 Interferences. The Contractor shall remove all interferences in way of specified work, as necessary, without regard to whether interferences are listed in this statement of work; restore all removed interferences upon completion of the specified work. The Contractor may exercise the discretion to work around certain interferences, when possible, so long as the specified work is successfully accomplished.

3.2 Requirements. Except as otherwise required, provide all facilities and services required by this specification for the entire period that the ship is at the contractor’s facility. Provide all cables, hoses, fittings, and equipment needed to provide the services to the ship. After completion of all other contract work and immediately before the ship departs the Contractor's facility, disconnect all temporary services and remove all related cables, hoses, fittings, and equipment.

Make all connections and provide all services within two hours after the ship arrives at the facility. The services are to be disconnected only when necessary to shift the ship or upon satisfactory completion of all authorized items of the contract. When the ship is shifted, dry docked, or refloated, the services are to be restored for normal use within one hour after completion of the shifting, dry docking, or refloating operation. Whenever water, air or steam service is required, provide a pressure regulator and a pressure gage at the deck connection to monitor and regulate the pressure

3.3 Moring Utility/Services Requirements

3.3.1 Provide a pier space for the ship when not in drydock.

3.3.2 Potable Water - Provide 1000 GPD of potable water at 50 PSIG at the ship's riser. The contractor shall provide hoses as required.

3.3.3 Electrical Power - Provide 440 VAC, 3 phase electrical power cables capable of delivering 300 AMPs. Ship has an international plug on the shore power cable. The contractor shall be responsible for matching the ship's plug or fabricating a pig-tail connection. Before departure, the contractor must return the shore power cable to its original configuration.

3.3.4 Sewage Disposal - Provide disposal of the ships grey and black water sewage. The ship has a single deck connection for sewage. The contractor shall provide hoses as required.

3.3.5 Trash Disposal - Provide a dumpster for disposal of the ships trash. Empty the dumpster whenever it is full. This dumpster must be within 100' of the ship's gangway. It is acceptable to place the dumpster on the after working deck.

3.3.6 Gangway Mooring Lines - Provide a suitable, lit gangway for the ship while at the contractor's facility. The gangway must have safety nets and hand rails. Provide suitable mooring lines while dockside.

3.3.7 Parking - Provide parking for 4 ship's vehicles within a 5 minute walk of the ship's gangway. Provide parking for an additional 5 vehicles within a 15 minute walk of the ship's gangway. Provide temporary passes for as many of these parking spaces as are within the shipyard's security perimeter. These parking spaces must be reserved for use of ship's personnel only.

3.4 Drydock Utility/Services Requirements

16 (Rev-0)

3.4.1 Electrical Power - Provide one 440 VAC, 3 phase electrical power and cables capable of delivering 200 AMPS. Ship has an international plug on the shore power cable. The contractor shall be responsible for matching the ship's plug or fabricating a pig-tail connection. Before departure, the contractor must return the shore power cable to its original configuration.

3.4.2 Sewage - Provide three portable toilets for ships personnel only on the fantail. Service these units as necessary.

3.4.3 Parking - Provide parking for 4 ship's vehicles within a 5 minute walk of the drydocks gangway. Provide parking for an additional 5 vehicles within a 15 minute walk of the ship's gangway. Provide temporary passes for as many of these parking spaces as are within the shipyard's security perimeter. These parking spaces must be reserved for use of ship's personnel only.

3.4.4 Gangway - Provide a suitable, lit gangway for the ship while in the drydock. The gangway must have safety nets and hand rails.

3.4.5 Fire Protection - Provide 500 GPM of fire fighting water at 100 PSI to the ship's riser.

Provide a fire alarm at the ship's gangway that is independent of the ship's power and communications. This alarm must sound at the yard security service or firefighting service.

3.5 Crane Service - While in drydock or while the ship is moored so that the ship's cranes cannot reach the pier, the contractor shall provide 8 hours of crane services as needed for loading stores or other items too heavy to carry.

3.6 Shore Based Space Utility/Service Requirements

3.6.1 Provide one 20 ft. container for storage. Only the ship shall have keys to this storage area.

This area will be used for storage of items that the crew removes from the ship. This container must be accessible 24 hours a day.

3.6.2 Provide 250 square feet of office space that can be secured by the ship's personnel. The space must have air conditioning and heating to maintain the temperature between 70 and 80 degrees Fahrenheit year round. It shall be furnished with 4 desks, 6 chairs, 2 book case, 1 four drawer legal filing cabinet, one long table and a small refrigerator. The space must have 115 VAC, 30 amp electrical service. This space must be accessible 24 hours a day.

3.6.2.1 The space must have 3 telephone lines with toll free access the local area and to 1-800 numbers. Long distance charges, if incurred, should be billed directly to the ship.

3.6.2.2 The space must have high speed Internet access such as Hawaiiantel.

3.6.3 Parking - Provide parking for 4 ship's vehicles within a 5 minute walk of the ship's offices. Provide parking for an additional 5 vehicles within a 15 minute walk of the ship's offices. Provide temporary passes for as many of these parking spaces as are within the shipyard's security perimeter. These parking spaces must be reserved for use of ship's personnel only.

17 (Rev-0)

3.7 Security Service – Provide security service during all periods that no contract work is being performed on the ship.

3.7.1 A guard shall inspect all unlocked compartments at least once every hours or part thereof, while work is not being performed. The guard shall be equipped with a Detex watch clock, or equivalent, during the compartment inspections and shall record their inspections on the clocks key stations.

3.7.2 The number of key stations required shall be determined by dividing the ship’s overall length in feet by 40. One key station shall be provided for each 40ft section per deck. The exact location for installing the key stations shall be specified by the COR. A Copy of the watch clock shall be available for inspection by the COTR at all times.

4. QUALITY ASSURANCE

This section is not applicable to this work item.

5. NOTES

5.1 The ship will be uninhabited during the entire availability. The Contractor shall refer to work item 009 for guidance.

18 (Rev-0)

WORK ITEM 3: Sea/Dock Trials; Perform

1.1 Intent. This work item describes the requirements for the Contractor to conduct sea and dock trials of affected equipment.

.1.2 Government-furnished property.

None.

2. REFERENCES

NOAA DRAWINGS

None.

NOAA PUBLICATIONS

None.

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 Checkpoints. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the original condition of cleanliness.

19 (Rev-0)

3.1.4 Interferences. The Contractor shall remove all interferences in way of specified work, as necessary, without regard to whether interferences are listed in this statement of work; restore all removed interferences upon completion of the specified work. The Contractor may exercise the discretion to work around certain interferences, when possible, so long as the specified work is successfully accomplished.

3.2 Dock Trials. The Contractor shall complete a full test as designated by the COR of all equipment affected by the docking. A CFR shall be submitted summarizing all deficiencies and successful equipment operations

3.2.1 All work must be complete prior to dock trials.

3.2.2 Prior to Dock Trials, disconnect all services from the ship. Upon completion of Dock Trials, reconnect all services as required.

3.2.3 During dock trials, the ship’s crew will run all equipment worked on by the contractor as though they were at sea. The brow will be closed to traffic. The contractor may have personnel aboard to correct deficiencies noted during trials. A list of Dock Trial Deficiencies will be generated and used to create the CFR required by section 3.2.

3.3 Sea Trials. The Contractor shall ensure all deficiencies noted during dock trials have been corrected prior to conducting sea trials. Upon completion of sea trials the contractor shall submit one CFR illustrating deficiency’s noted during sea trials.

3.3.1 Sea trials may be completed in less than 8 hours but may last up to 24 hours.

3.3.2 The contractor must provide a minimum of one supervisor and one mechanic to ride the ship during Sea Trials. The contractor may bring people from all trades and may bring subcontractors on Sea Trials as they sees fit. A list of contractor and subcontractor people riding the ship must be submitted to the ship one day before Sea Trials. Immediately before Sea Trials the contractor will be asked to muster his people and update the list of people riding the ship.

3.3.3 The contractor shall provide all tugs and barges as required to move the ship from the pier to the fairway of the contractor’s facility upon departure. Provide the same services to return the ship to the pier upon return from Sea Trials.

3.3.4 During Sea Trials, the ship will actually put out to sea. The crew will run all equipment worked on by the contractor.

4. QUALITY ASSURANCE

None.

5. NOTES

None.

20 (Rev-0)

WORK ITEM 4: Propellers; Remove, Inspect/Service & Reinstall

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to remove and inspect/service both starboard and port propellers to ensure proper functionality.

1.2 Government-furnished property.

None.

2. REFERENCES

NOAA DRAWINGS

Propeller drawing classified by USN.

NOAA PUBLICATIONS

NOAA Standard Specification 0100; Conduct of Checkpoints

OTHER REFERENCES

International Organization for Standardization (ISO) 484/2, 1981, Shipbuilding - Ship

Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive

ASTM International (ASTM), D3951, Re-approved 2004, Standard Practice for Commercial Packaging

3. REQUIREMENTS

3.1 General. The Contractor shall remove each propeller from its associated shaft. Thoroughly clean the propeller, hub, and shaft interface free of all marine growth, dirt, and all other foreign substances.

CAUTION!

Do not use a foreign object as an anti-torque device against the propeller blade(s) while removing the propellers. The application of force to the propeller blade will result in knocking the propeller blade out of 'rake' and affecting the overall 'track' of the propeller blades.

The use of a non-marring shaft locking device is recommended.

3.1.1 Checkpoint. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

21 (Rev-0)

• 3.2 Inspections.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall remove all interferences in way of specified work, as necessary, without regard to whether interferences are listed in this statement of work; restore all removed interferences upon completion of the specified work. The Contractor may exercise the discretion to work around certain interferences, when possible, so long as the specified work is successfully accomplished.

3.2 Inspections. The Contractor shall perform the following inspections:

3.2.1 Visual. Visually inspect the following, for evidence of damage and defects:

• Each shaft interface, threads, propeller, propeller hub bore, and adjacent areas.

• The entire trailing edge of the propeller blades and the surface around the blade roots in the area of the anti-cavitation holes.

• The hub of the propellers, propeller nut, and the propeller fairing cones (if applicable).

3.2.2 Measurement. Measure and record the following for each propeller:

• Propeller diameter.

• Blade thickness.

• Blade pitch.

• Rake.

• Track.

• Anti-cavitation holes.

• Anti-singing edges.

3.3 Report. The Contractor shall submit a CIR for the completed inspections.

3.4 Polishing. After resolution of any noted defects, the Contractor shall polish all surfaces of the propellers to a uniform finish, conforming to the Class S standard in ISO 484/2.

3.4.1 To avoid singing, it is important the trailing edge of the propeller blades be sharp. Sharpen the trailing edge of the propeller blade. Although the angle isn’t critical, it must be consistent, the same on all blades and should be to sharp edge similar to the Figure 320-1. A curled edge is not allowed. Viewing the blades from the aft side facing forward:

22 (Rev-0)

3.4.1.1 On the right hand blade, start sharpening the blade at the top at about the 11:00 o’clock position and continue down to approximately the 1/3 radius

3.4.1.2On the left hand blade, start sharpening the blade at the top at approximately the 1:00 o’clock position and continue down to approximately the 1/3 radius

Figure 320-1

3.5 Reinstallation. The Contractor shall reinstall the propellers in accordance with references.

Completely cover the propellers for the remainder of the drydock period to protect from dirt and paint overspray.

4. QUALITY ASSURANCE

None.

5. NOTES

5.1 Propeller Data: Cast Manganese Bronze, 4 blades per propeller, 8 ft. Diameter, and surface area of 64 ft. squared each.

5.2 The T-AGOS class ships have a demonstrated problem with singing propellers which requires special care during cleaning and polishing. The propellers feature a chisel cut anti-singing edge and a knuckle on the suction face of the blades. The radius of this knuckle is 0.015 inches and can be easily polished off causing the propellers to sing. The knuckle and chisel area should be cleaned by hand with a medium, (red) 3M hand pad fixed to a flat piece of wood and used like a flat file to keep the chisel flat and the knuckle sharp. Provide the ABS Surveyor with prior notice and the opportunity to inspect any or all portions of ongoing work ordered by this item.

5.3 A suggested technical representative for grooming and inspection of these propellers is:

Sound Propeller Systems LLC

9130 15th Place So Suite A Seattle, WA 98108

(206) 392-0021

23 (Rev-0)

WORK ITEM 5: Rudders; Remove, Inspect/Service, & Reinstall

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to remove, inspect/service, and reinstall both port and starboard rudders.

1.2 Government-furnished property.

None.

2. REFERENCES

NOAA DRAWINGS

NOAA Ship Drawing OS-562-6233911, Rev. E. “Rudder Stock Carrier and Bearing

Arrgt and Details” OS-561-6233894, “Steer Gear Arrgt”

NOAA PUBLICATIONS

NOAA Standard Specification 0100; Conduct of Checkpoints

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 Checkpoints. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

• 3.2 (Post haul-out inspection).

• 3.4 (Inspections).

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon

24 (Rev-0) completion of work, the Contractor shall remove all installed protective measures, inspect for the original condition of cleanliness. The Contractor shall accomplish the following:

• Maintain existing hydraulic system cleanliness; take all necessary precautions to prevent the introduction of contaminants into the hydraulic system.

• When the hydraulic system is disassembled, install temporary threaded isolation caps on both sides of the separated fitting to prevent contamination. Temporary caps may be plastic or metal and must match both the threads type and size, and employ the same sealing technique (JIC, BSPP, SAE-Boss) of the ports they are fitted to so as to prevent mechanical injury to the seal surfaces or threaded ports.

• Provide suitable covering to protect all exposed rudder and vessel components against contamination during the performance of the work specified herein.

• Ensure that rudder stock/shaft surfaces are supported in a minimum of two locations, at all times, until reinstallation.

3.1.4 Interferences. The Contractor shall remove all interferences in way of specified work, as necessary, without regard to whether interferences are listed in this statement of work; restore all removed interferences upon completion of the specified work. The Contractor may exercise the discretion to work around certain interferences, when possible, so long as the specified work is successfully accomplished.

3.2 Post haul-out inspection. After the vessel has been dry-docked, the Contractor shall perform the following inspection before disassembling the rudder assemblies. Submit a CIR detailing the results of the inspection and the recommendations to return the rudder configuration to the configuration detailed in the applicable reference drawings and Tech Pubs.

• Within 24-hours of dry-docking the vessel, remove the countersunk threaded plugs from the bottom of the rudder blades and note the type, volume, and color of any effluent. Capture, contain and dispose of all effluents in accordance with local, state, and federal requirements.

• Operate the rudders from the helm control over the full range of motion, taking note of and documenting the port and starboard stop points (in degrees), the relationship between the hard mechanical tiller stops (in inches of gap), and if the rudder stopped due to an over-stroke and subsequent motor controller over-run shutdown or from a properly terminated rudder command at the requested rudder position.