A9_IA_Form_C113_Progress_Schedule.pdf

PDF 206 KB Posted

Attached to
CON Chain Link Fence Federal contract opportunity
Solicitation number
140A2326Q0280
Issued by
Department of the Interior Bureau of Indian Affairs Bureau of Indian Education

About this file

This is a Contract Progress Schedule form (IA-C113) used by the Department of the Interior, Indian Affairs to track contractor performance on federal contracts. The form is a template requiring contractors to submit three copies to the contracting officer at times specified in their contract. Contractors must complete blocks identifying the contract number, starting date, completion date, purchase request number, project number, actual starting date, actual completion date, project title, and contractor information including name, address, and authorized signature.

The form requires contractors to identify major work elements in logical sequence (such as excavation, concrete work, carpentry, or engineering) and assign a percentage of total job completion to each element, with percentages totaling 100%. Contractors must then use columns D through Q to indicate planned periodic progress across contract weeks, entering percentages showing when each work element will be accomplished. Line 12 totals planned work at each interval to create a baseline schedule. If contract modifications alter the original schedule, contractors must submit a revised schedule noting changes in completion dates, added or deleted work, or modified progress. Contractors must also submit progress reports (IA-C713) at intervals established by the contracting officer, documenting actual percentage of work accomplished for each element. These reports are used for contract administration and to support approval of partial payments.

View the file

Other files for this federal contract opportunity

Other files attached to CON Chain Link Fence, newest first.
File Type Posted
Sol_140A2326Q0280_Amd_0001.pdf PDF
REVISED_SOW_Chain_Link_Fence_Lake_Valley_Navajo_School_0001.pdf PDF
A4_-_IA_-_IEE_Representation_Form.pdf PDF
A7_SF25A_Payment_Bond.pdf PDF
A5_IA_Form_3000_Material_Approval_Submittal.pdf PDF
A6_-__RFQ_Questions_and_Answers_Log.xlsx XLSX spreadsheet
A6_SF25_Performance_Bond.pdf PDF
A04_-_SOW_Chain_Link_Fence_Lake_Valley_Navajo_School.pdf PDF
B03_-_Wage_Rates.pdf PDF
A5_SF24_Bid_Bond.pdf PDF
Sol_140A2326Q0280.pdf PDF
A3_-__-_DIAR_1452_280-2_Supplement.docx DOCX document
A8_SF1413_Statement_and_Acknowledgement.pdf PDF
A10_IA_Form_C713_Progress_Report.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of the Interior, Indian Affairs

CONTRACT PROGRESS SCHEDULE

(See Contractor's Instructions on Reverse)

1. CONTRACT NO. 8. PROJECT TITLE 10. APPROVAL RECOMMENDED BY:

DATE SIGNED PROJECT ENGINEER / COR SIGNATURE

2. STARTING DATE

3. COMPLETION DATE 9. SUBMITTED BY:

4. PURCHASE REQUEST NO. DATE SIGNED CONTRACTOR'S NAME (Last, First, Middle Initial) ADDRESS (Street, City, State, Zip Code)

CONTRACTOR'S SIGNATURE 11. APPROVED BY:

5. PROJECT NO. DATE CONTRACTING OFFICER'S SIGNATURE

6. ACTUAL STARTING DATE

7. ACTUAL COMPLETION

LINE

NO

A

WORK ELEMENTS

B

C

WEEKS

D E F G H I J K L M N O P Q

FORM IA-C113

Page 1 of ____

INSTRUCTIONS TO CONTRACTORS

1. Prepare three copies of this form IA-C113, in accordance with these instructions, and submit to the contracting officer at the time stated in the contract or as established by the contracting officer.

2. Blocks 1, 2, and 3. Enter the contract number, starting date, and completion date as shown on the contract.

3. Block 8. Enter the title of the project as shown on the contract.

4. Block 9. Enter name and address of your firm. The three copies submitted to the contracting officer must be dated and signed by the contractor or an authorized representative of the firm.

5. Lines 1 through 12. Major elements of work (whether unit price or lump sum contract) such as excavation, concrete work, carpentry, engineering, installation of communication electronic facilities, etc., will be shown in Column B in logical sequence and in sufficient detail to identify the element. If the contract calls for more than 11 work elements, additional copies of this may be used as a continuation for the work elements.

6. The percentage of each listed work element to the complete job will be shown opposite each element in Column C. As an example, if 3 work elements are shown: excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these percentages will be shown opposite each element. The total must equal 100%.

7. Columns D through Q will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only the top half of the space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for performance is 8 weeks, and it is planned to accomplish 10% of the excavation work the 1st week and 20%each week until excavation is complete, 10 would be shown in the upper half of Line 1 under Column D, 20 under Column E, and 20 under Column F for a total of 50%. If it is planned to accomplish the concrete work during the 4th, 5th, and 6th weeks in equal amounts, 10 would be entered under Columns G, H, and I on Line 2. Assuming the backfill will be accomplished during the 7th and 8th weeks, 10 would be entered under Columns J and K on Line 3. If the contract extends beyond 14 weeks, additional copies of this form may be used as a continuation of performance record.

8. Total amount of work planned at intervals as shown in Columns D through Q will be totaled and entered in the top half of the space under the appropriate column of Line 12. Again, using the example cited above, the totals under Columns D through K would read 10, 20, 20, 10, 10, 10, 10, 10 for a total of 100%. These totals will be used to plot an overlay graph using Lines 4 through 11, beginning with Column D and extending to the right the number of columns (weeks) authorized by the contract for performance time.

9. In the event the contract is modified by the contracting officer under terms of the contract, changing the progress of work as originally scheduled, adding or deleting work or changing the original completion date, a revised progress schedule will be prepared and submitted to the contracting officer for approval. In preparing the revised schedule, the amount of work completed will be considered, together with the changed new completion date set forth in the contract modification. Considering these factors, the work under the contract will be rescheduled over the new total performance time in the same manner that the original schedule was prepared. The new completion date will be entered in Block 3. "First Revised Schedule," "Second Revised Schedule," etc., will be entered to the left of the form title. Time of submission of the revised schedule will be determined by the contracting officer.

10. At such intervals as may be established by the contracting officer, the contractor will submit to the contracting officer the IA-C713 "Contract Progress Report," indicating the percentage of work accomplished for each work element during the established reporting period. Accurate reports are of the utmost importance to the contractor and to the Government, since the percentage of completion, or progress, thus reported is used in administration of the contract and may be used in connection with approval of partial payments under the contract. Care should be taken to plan the work in such manner that it can be accomplished as stated in this schedule. If, for any reason, it becomes known that any part of the progress under this contract will be delayed, this fact should be reported to the contracting officer immediately.