A6+-+Asbestos+Abatement+Phasing+Schedule.pdf
PDF 4 MB Posted
- Solicitation number
- 303-25-003
- Issued by
- Pembina County, North Dakota
About this file
This is an Asbestos Abatement Phasing Schedule prepared by Environmental Consulting for Devils Lake Central Middle School in North Dakota, in coordination with the North Dakota Department of Environmental Quality (NDDEQ). The document outlines a multi-phase approach to asbestos abatement at the school facility located at 325 7th Street NE, Devils Lake, ND 58301. The phasing schedule prioritizes the removal of furnishings and abatement work across multiple floors and areas of the building, with first priority areas requiring furnishings removal by May 26 and second priority areas requiring furnishings removal by June 4. The schedule specifically identifies the first floor, second floor, and lower level areas for abatement work, with notation that the music room on the first floor should have furnishings removed by May 18 if possible.
The document serves as a planning tool for sequencing the abatement activities to minimize disruption to school operations. The phasing approach allows for staged removal of furnishings and completion of abatement work in designated priority areas, with coordination required between Environmental Consulting and the school district. No specific pricing, budget amounts, contract terms, or award information is contained within this phasing schedule document, which functions as a supplementary planning exhibit to the primary asbestos abatement solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A4+-+Building+Diagrams+of+Asbestos+Locations.pdf | ||
| A1+-+AHERA+Project+Design+Manual.pdf | ||
| A11+-+Technical+Proposal+Evaluation+Worksheet.xlsx | XLSX spreadsheet | |
| A10+-+Contract_PSA.docx | DOCX document | |
| A7+-Guidline+12+Asbestos+Landfill+Disposal.pdf | ||
| A8+-+SFN17987.pdf | ||
| A2+-+AHERA+3+Year+Reinspection+Nov2024.pdf | ||
| A9+-+BSRP+QAPP.pdf | ||
| A5+-+Asbestos+Locations+and+Quantities.pdf | ||
| A3+-+Site+Photographs.pdf | ||
| Asbestos+Abatement+at+Devils+Lake+CMS+RFP.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E=t
Environnientql tlng 133 Moln Ave, Sulte 201 Vest Forgo, ND 58078
Poger 1 of 5
Schoot 325 7th st NE Devils Lake, ND 58301
.rcgt
IECII ED
adan ]ffi-r l:l gsftEg
Gttmlglux ffi ffi
.-.8
EI
qiiagl
EIaar
EI
m
EI
H 2nd Priority
(Furnishings removed by 6la)
EI
I ffi 1st Priority (Furnishings removed by 5126)dE ffi ffiffi ffi finst FIoon
1st Priority (Furnishings removed by 5/26
Amy Cannon Line
Amy Cannon Line
Amy Cannon Line o Envlronrrentot Consuttlng Mqln Ave, Sulte 201
Forgo, NI 58078
Poger 2 o€ 5
Devlts Lake, ND 5S301
Centrqt Mlddte 325 7th St NE c
EEEEE
ETEEEE
TEEEBEEIEP
ETTgETEEE
BEEEIEE
@IIEEEE
ETIEIBEF
E
EE
E
-lug
{t l rl
I
2nd Priority (Furnishings removed by 614) u4ffi
1st Priority (Furnishings removed by 5126)
€cD I!ilRCE q
Second floon
Trlo Envlronnentot Consultlng 133 Mqln Ave, Sulte 201 Vest Forgo, ND 58078
Centrot Mlddte Schoot 3a5 7th st NE' Ilevlls Lqke, ND 58301
Poger 3 of 5
.AA,L' {"j
3tqAGC ffi
TABMY
mtrl rTi'-] mg 1st Priority (Furnishings removed by 5126.
| 5/18 for Music Room if possible)
1st Priority (Furnishings removed by 5126) Lcwer l-ev"l
File details come from the government source that posted it. Updated .