A3+-+Site+Photographs.pdf
PDF 5 MB Posted
- Solicitation number
- 303-25-003
- Issued by
- Pembina County, North Dakota
About this file
This file is a site photograph document for the Asbestos Abatement at Devils Lake Central Middle School project, prepared for the North Dakota Department of Environmental Quality (NDDEQ). The photographs document the location and extent of asbestos-containing thermal system insulation (TSI) identified throughout Central Middle School in Devils Lake, North Dakota. The images show asbestos TSI materials present in multiple areas of the facility, including the water meter room (A004), rooms A002, A003, and A005, basement areas including the band room (A011), hallway A012, and steam tunnel entrances. The photographs also depict building access points, including the main entrance facing south and contractor entrance door 6 facing north, which provide context for project work scope and logistics planning.
The photographic documentation serves as a visual reference for contractors preparing proposals for asbestos abatement work. The images establish baseline conditions and identify specific locations requiring remediation, enabling contractors to assess the scope of work, plan containment and removal procedures, and develop accurate cost estimates. This supporting exhibit provides essential information for bidders to understand the project requirements and site conditions prior to submitting proposals for the NDDEQ's asbestos abatement solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A6+-+Asbestos+Abatement+Phasing+Schedule.pdf | ||
| A4+-+Building+Diagrams+of+Asbestos+Locations.pdf | ||
| A5+-+Asbestos+Locations+and+Quantities.pdf | ||
| Asbestos+Abatement+at+Devils+Lake+CMS+RFP.docx | DOCX document | |
| A1+-+AHERA+Project+Design+Manual.pdf | ||
| A11+-+Technical+Proposal+Evaluation+Worksheet.xlsx | XLSX spreadsheet | |
| A10+-+Contract_PSA.docx | DOCX document | |
| A7+-Guidline+12+Asbestos+Landfill+Disposal.pdf | ||
| A8+-+SFN17987.pdf | ||
| A2+-+AHERA+3+Year+Reinspection+Nov2024.pdf | ||
| A9+-+BSRP+QAPP.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Central Middle School-Devils Lake Asbestos TSI Building Photos
Main entrance (facing South)
Contractor entrance door 6 (facing North)
Water meter room A004 (asbestos TSI)
Water meter room A004 (asbestos TSI in ceiling)
Water meter room A004 (asbestos TSI)
Water meter room A004 (SW steam tunnel entrance)
Room A002 (asbestos TSI in ceiling)
Room A003 (asbestos TSI in ceiling)
Room A005 (asbestos TSI in ceiling)
Room A005 (asbestos TSI in ceiling)
Basement main hallway
Basement band room (A011) asbestos TSI in ceiling
Basement band room (A011) Southeast steam tunnel entrance
Hallway A012 (asbestos TSI in ceiling)
File details come from the government source that posted it. Updated .