COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
NORTHERN REGIONAL OFFICE
13901 Crown Court, Woodbridge, Virginia 22193
(703) 583-3800 Fax (703) 583-3821 www.deq.virginia.gov
Douglas W. Domenech Secretary of Natural Resources
David K. Paylor Director
Thomas A. Faha Regional Director
July 11, 2013
Mr. Kent Carson SENT VIA E-MAIL Arlington National Cemetery RECEIPT CONFIRMATION REQUESTED 1 Memorial Drive, AD Building Arlington, Virginia22211-5003
RE: Virginia Water Protection (VWP) General Permit No. WP4-13-0872 Arlington National Cemetery Millennium Project, Arlington County, Virginia Notice of Authorization to Proceed with Project Permanently Impacting up to 0.10 acre of Wetlands and/or 300 linear feet of Stream Channel
Dear Mr. Carson:
The Virginia Department of Environmental Quality (DEQ) has reviewed your application dated and received on June 3, 2013. Based on DEQ’s review, the proposed “Arlington National Cemetery Millennium Project” project qualifies for the VWP General Permit Number WP4 in accordance with 9 VAC 25-690-10 et seq. The enclosed VWP general permit contains the applicable limits, reporting requirements, and other conditions for authorization.
This authorization expires seven years from the Authorization Effective Date. Please note that this authorization may be extended at the State Water Control Board's discretion and as per the VWP permit regulations. If the authorized activity has not been completed and you wish to obtain an extension, in accordance with the general permit conditions, you must request this extension no less than 60 days prior to the expiration date of the VWP general permit authorization, for the Board's decision, otherwise coverage will expire on the original date.
Please note that you are responsible for complying with the Part I and Part III conditions that are applicable to your project. Additionally, in accordance with Part III.K, when all permitted activities have been completed, you shall submit a notice of termination by consent. Should the project’s surface water impacts exceed 0.10 acre of wetlands and/or 300 linear feet of stream channels, you shall be responsible for contacting DEQ to revise the authorization, including provisions for compensatory mitigation for all permanent surface water impacts.
Arlington National Cemetery
WP4-13-0872
July 11, 2013
The work authorized by this permit satisfies the terms and conditions contained in the Norfolk District, Corps of Engineers’ State Program General Permit (12- SPGP-01) and the special conditions, if any, attached to 12-SPGP-01. No additional authorization from the Corps is required. Your 12-SPGP-01 authorization is effective as of the date on this letter and remains effective until May 31, 2017.
Please contact Margaret Quigley at (703) 583-3892 or Margaret.Quigley@deq.virginia.gov with questions concerning the above information.
Respectfully, Trisha M. Beasley Regional VWPP Program Manager
Enclosures: VWP General Permit Cover Page, Part I – Special Conditions, Part III - Conditions Applicable to All VWP Permits, 12-SPGP-01 cc: Mr. Frank Graziano, Wetland Studies and Solutions, Inc. – VIA EMAIL Ms. Regena Bronson, U.S. Army Corps of Engineers, Fredericksburg Field Office – VIA EMAIL
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
VWP General Permit No. WP4 VWP General Permit Authorization No. WP4-13-0872
Authorization Effective date: July 11, 2013 Authorization Expiration date: July 10, 2020
VWP GENERAL PERMIT FOR IMPACTS FROM DEVELOPMENT AND CERTAIN MINING
ACTIVITIES UNDER THE VIRGINIA WATER PROTECTION PERMIT AND THE VIRGINIA STATE
WATER CONTROL LAW
Based upon an examination of the information submitted by the applicant and in compliance with § 401 of the Clean Water Act as amended (33 USC 1341) and the State Water Control Law and regulations adopted pursuant thereto, the board has determined that there is a reasonable assurance that the activity authorized by this VWP general permit, if conducted in accordance with the conditions set forth herein, will protect instream beneficial uses and will not violate applicable water quality standards. The board finds that the effect of the impact, together with other existing or proposed impacts to wetlands, will not cause or contribute to a significant impairment of state waters or fish and wildlife resources.
Subject to the provisions of the Clean Water Act, as amended, and pursuant to the State Water Control Law and regulations adopted pursuant to it, the permittee is authorized to permanently or temporarily impact up to two acres of nontidal wetlands or open water and up to 1,500 linear feet of nontidal stream bed. While this general permit authorized impacts up to two acres nontidal wetlands or open water and up to 1,500 linear feet of nontidal streambed, this coverage only authorizes impacts as presented in the Activity Description below.
Permittee: Arlington National Cemetery
Address: 1 Memorial Drive, AD Building, Arlington, Virginia 22211-5003
Activity Location: The project site is located in the northwest portion of the Arlington National Cemetery in the former picnic grounds of Joint Base Myer-Henderson Hall in Arlington County, Virginia.
Activity Description: The permittee proposes to expand the Arlington National Cemetery in order to provide additional interment space in a project known as “Arlington National Cemetery Millennium Project.” This permit authorizes the total permanent impact of 0.015 acre (115 linear feet) of stream channels. Permitted activities shall be as described in the Joint Permit Application dated and received June 3, 2013. Compensation is not required as the total permanent surface water impacts are within the reporting-only thresholds.
The work authorized by this permit also satisfies the terms and conditions contained in the Norfolk District, U.S.
Army Corps of Engineers’ (USACE) State Program General Permit (12-SPGP-01) and no additional authorization from the USACE is required. The permittee is responsible for following all special conditions contained within the 12-SPGP-01 (attached) that are pertinent to the project.
The authorized activity shall be in accordance with this cover page, Part I - Special Conditions and Part III - Conditions Applicable to All VWP General Permits, as set forth herein.
____________________________________________________________ July 11, 2013 Regional VWPP Program Manager, Department of Environmental Quality Date
VWP General Permit WP4 Part I
PART I – SPECIAL CONDITIONS
A. Authorized Activities
1. This permit authorizes permanent or temporary impacts of up to two acres of nontidal wetlands or open water and up to 1,500 linear feet of nontidal stream bed according to the information provided in the approved and complete application.
2. Any changes to the authorized permanent impacts to surface waters associated with this project shall require either a notice of planned change in accordance with 9 VAC 25-690-80, or another VWP permit application.
3. Any changes to the authorized temporary impacts to surface waters associated with this project shall require written notification to DEQ and restoration to preexisting conditions in accordance with the conditions of this permit authorization.
4. Modification to compensation requirements may be approved at the request of the permittee when a decrease in the amount of authorized surface waters impacts occurs, provided that the adjusted compensation meets the initial authorization compensation goals.
5. The activities authorized for coverage under this VWP general permit must commence and be completed within seven years of the date of this authorization.
B. Continuation of Coverage
Reapplication for continuation of coverage under this VWP general permit or a new VWP permit may be necessary if any portion of the authorized activities or any VWP general permit requirement (including compensation) has not been completed within seven years of the date of authorization.
Notwithstanding any other provision, a request for continuation of coverage under a VWP general permit in order to complete monitoring requirements shall not be considered a new application, and no application fee will be charged. The request for continuation of coverage must be made no less than 60 days prior to the expiration date of this VWP general permit authorization, at which time the board will determine if continuation of the VWP general permit authorization is necessary.
C. Overall Project Conditions
1. The activities authorized by this VWP general permit shall be executed in a manner so as to minimize adverse impacts on instream beneficial uses as defined in § 62.1-10 (b) of the Code of Virginia.
2. No activity may substantially disrupt the movement of aquatic life indigenous to the water body, including those species which normally migrate through the area, unless the primary purpose of the activity is to impound water. Culverts placed in streams must be installed to maintain low flow conditions. The requirement to countersink does no apply to extensions or maintenance of existing culverts that are not countersunk, floodplain culverts being placed above ordinary high water, culverts being placed on bedrock, or culverts required to be placed on slopes 5.0% or greater. No activity may cause more than minimal adverse effect on navigation. Furthermore the activity must not impede the passage of normal or expected high flows and the structure or discharge must withstand expected high flows.
3. Wet or uncured concrete shall be prohibited from entry into flowing surface waters. Excess or waste concrete shall not be disposed of in flowing surface waters or washed into flowing surface waters.
4. All fill material shall be clean and free of contaminants in toxic concentrations or amounts in accordance with all applicable laws and regulations.
5. Erosion and sedimentation controls shall be designed in accordance with the Virginia Erosion and Sediment Control Handbook, Third Edition, 1992, or for mining activities covered by this general permit, the standards issued by the Virginia Department of Mines, Minerals and Energy that are effective as those in the Virginia Erosion and Sediment Control Handbook, Third Edition, 1992.
These controls shall be placed prior to clearing and grading and maintained in good working order to minimize impacts to state waters. These controls shall remain in place until the area is stabilized and shall then be removed.
6. Exposed slopes and streambanks shall be stabilized immediately upon completion of work in each permitted impact area. All denuded areas shall be properly stabilized in accordance with the Virginia Erosion and Sediment Control Handbook, Third Edition, 1992.
7. All construction, construction access (e.g., cofferdams, sheetpiling, and causeways) and demolition activities associated with this project shall be accomplished in a manner that minimizes construction or waste materials from entering surface waters to the maximum extent practicable, unless authorized by this VWP general permit.
8. No machinery may enter flowing waters, unless authorized by this VWP general permit.
9. Heavy equipment in temporarily-impacted wetland areas shall be placed on mats, geotextile fabric, or other suitable material to minimize soil disturbance to the maximum extent practicable.
Equipment and materials shall be removed immediately upon completion of work.
10. All nonimpacted surface waters and compensatory mitigation areas within 50 feet of permitted activities and within the project or right-of-way limits shall be clearly flagged or marked for the life of the construction activity at that location to preclude unauthorized disturbances to these surface waters and compensatory mitigation areas during construction. The permittee shall notify contractors that no activities are to occur in these marked surface waters.
11. Temporary disturbances to surface waters during construction shall be avoided and minimized to the maximum extent practicable. All temporarily disturbed wetland areas shall be restored to preexisting conditions within 30 days of completing work at each respective temporary impact area, which shall include reestablishing preconstruction contours, and planting or seeding with appropriate wetland vegetation according to cover type (emergent, scrub/shrub, or forested). The permittee shall take all appropriate measures to promote and maintain revegetation of temporarily disturbed wetland areas with wetland vegetation through the second year post-disturbance. All temporarily impacted streams and streambanks shall be restored to their original contours within
30 days following the construction at that stream segment, and the banks seeded or planted with the same vegetation cover type originally present along the streamsbanks, including supplemental erosion control grasses if necessary, except for invasive species identified on DCR's Invasive Alien Plant Species of Virginia list.
12. Materials (including fill, construction debris, and excavated and woody materials) temporarily stockpiled in wetlands shall be placed on mats or geotextile fabric, immediately stabilized to prevent entry into state waters, managed such that leachate does not enter state waters, and completely removed within 30 days following completion of that construction activity. Disturbed areas shall be returned to original contours, restored within 30 days following removal of the stockpile, and restored with the same vegetation cover type originally present, including supplemental erosion control grasses if necessary, except for invasive species identified on DCR's Invasive Alien Plant Species of Virginia list.
13. Continuous flow of perennial springs shall be maintained by the installation of spring boxes, french drains, or other similar structures.
14. The permittee shall employ measures to prevent spills of fuels or lubricants into state waters.
15. The permittee shall conduct activities in accordance with the time-of-year restrictions recommended by the Virginia Department of Game and Inland Fisheries, the Virginia Marine Resources Commission, or other interested and affected agencies and shall ensure that all contractors are aware of the time-of-year restrictions imposed.
16. Water quality standards shall not be violated as a result of the construction activities, unless allowed by this permit authorization.
17. If stream channelization or relocation is required, all work in surface waters shall be done in the dry, unless authorized by this VWP general permit, and all flows shall be diverted around the channelization or relocation area until the new channel is stabilized. This work shall be accomplished by leaving a plug at the inlet and outlet ends of the new channel during excavation.
Once the new channel has been stabilized, flow shall be routed into the new channel by first removing the downstream plug and then the upstream plug. The rerouted stream flow must be fully established before construction activities in the old stream channel can begin.
D. Road Crossings
1. Access roads and associated bridges or culverts shall be constructed to minimize the adverse effects on surface waters to the maximum extent practicable. Access roads constructed above preconstruction contours and elevations in surface waters must be bridged or culverted to maintain surface flows.
2. Installation of road crossings shall occur in the dry via the implementation of cofferdams, sheetpiling, stream diversions, or similar structures.
E. Utility Lines
1. All utility line work in surface waters shall be performed in a manner that minimizes disturbance, and the area must be returned to its original contours and restored within 30 days of completing work in the area, unless otherwise authorized by this VWP general permit. Restoration shall be the seeding of planting of the same vegetation cover type originally present, including supplemental erosion control grasses if necessary, except for invasive specifies identified on DCR's Invasive Alien Plant Species of Virginia list.
2. Material resulting from trench excavation may be temporarily sidecast into wetlands not to exceed a total of 90 days, provided the material is not placed in a manner such that it is dispersed by currents or other forces.
3. The trench for a utility line cannot be constructed in a manner that drains wetlands (e.g., backfilling with extensive gravel layers creating a french drain effect.). For example, utility lines may be backfilled with clay blocks to ensure that the trench does not drain surface waters through which the utility line is installed.
F. Stream Modification and Stream Bank Protection
1. Riprap bank stabilization shall be of an appropriate size and design in accordance with the Virginia Erosion and Sediment Control Handbook, Third Edition, 1992.
2. Riprap apron for all outfalls shall be designed in accordance with the Virginia Erosion and Sediment Control Handbook, Third Edition, 1992.
3. For stream bank protection activities, the structure and backfill shall be placed as close to the stream bank as practicable. No material shall be placed in excess of the minimum necessary for erosion protection.
4. All stream bank protection structures shall be located to eliminate or minimize impacts to vegetated wetlands to the maximum extent practicable.
5. Asphalt and materials containing asphalt or other toxic substances shall not be used in the construction of submerged sills or breakwaters.
6. Redistribution of existing stream substrate for the purpose of erosion control is prohibited.
7. No material removed from the stream bottom shall be disposed of in surface waters, unless authorized by this permit.
G. Dredging
1. Dredging depths shall be determined and authorized according to the proposed use and controlling depths outside the area to be dredged.
2. Dredging shall be accomplished in a manner that minimizes disturbance of the bottom and minimizes turbidity levels in the water column.
3. If evidence of impaired water quality, such as a fish kill, is observed during the dredging, dredging operations shall cease and the DEQ shall be notified immediately.
4. Barges used for the transportation of dredge material shall be filled in such a manner to prevent the overflow of dredged materials.
5. Double handling of dredged material in state waters shall not be permitted.
6. For navigation channels the following shall apply:
a. A buffer of four times the depth of the dredge cut shall be maintained between the bottom edge of the design channel and the channelward limit of wetlands, or a buffer of 15 feet shall be maintained from the dredged cut and the channelward edge of wetlands, whichever is greater.
This landward limit of buffer shall be flagged and inspected prior to construction.
b. Side slope cuts of the dredging area shall not exceed a two-horizontal-to-one-vertical slope to prevent slumping of material into the dredged area.
7. A dredged material management plan for the designated upland disposal site shall be submitted and approved 30 days prior to initial dredging activity.
8. Pipeline outfalls and spillways shall be located at opposite ends of the dewatering area to allow for maximum retention and settling time. Filter fabric shall be used to line the dewatering area and to cover the outfall pipe to further reduce sedimentation to state waters.
9. The dredge material dewatering area shall be of adequate size to contain the dredge material and to allow for adequate dewatering and settling out of sediment prior to discharge back into state waters.
10. The dredge material dewatering area shall utilize an earthen berm or straw bales covered with filter fabric along the edge of the area to contain the dredged material, and shall be properly stabilized prior to placing the dredged material within the containment area.
11. Overtopping of the dredge material containment berms with dredge materials shall be strictly prohibited.
H. Stormwater Management Facilities
1. Stormwater management facilities shall be installed in accordance with best management practices and watershed protection techniques (e.g., vegetated buffers, siting considerations to minimize adverse effects to aquatic resources, bioengineering methods incorporated into the facility design to benefit water quality and minimize adverse effects to aquatic resources) that provide for long-term aquatic resources protection and enhancement, to the maximum extent practicable.
2. Compensation for unavoidable impacts shall not be allowed within maintenance areas of stormwater management facilities.
3. Maintenance activities within stormwater management facilities shall not require additional permit authorization or compensation, provided that the maintenance activities do not exceed the original contours of the facility, as approved and constructed, and is accomplished in designated maintenance areas as indicated in the facility maintenance or design plan.
Part III
PART III – CONDITIONS APPLICABLE TO ALL VWP GENERAL PERMITS
A. Duty to Comply
The permittee shall comply with all conditions of the VWP general permit. Nothing in this VWP general permit shall be construed to relieve the permittee of the duty to comply with all applicable federal and state statutes, regulations, and toxic standards and prohibitions. VWP general permit noncompliance is a violation of the Clean Water Act and State Water Control Law, and is grounds for enforcement action, VWP general permit authorization termination for cause, VWP general permit authorization revocation, or denial of a continuation of coverage request.
B. Duty to Mitigate
The permittee shall take all reasonable steps to minimize or prevent impacts in violation of the VWP general permit which may have a reasonable likelihood of adversely affecting human health or the environment.
C. Reopener
This VWP general permit authorization may be reopened to modify its conditions when the circumstances on which the previous VWP general permit authorization was based have materially and substantially changed, or special studies conducted by the board or the permittee show material and substantial change since the time the VWP general permit authorization was issued and thereby constitute cause for VWP general permit authorization revocation and reissuance.
D. Compliance with State and Federal Law
Compliance with this VWP general permit constitutes compliance with the VWP permit requirements of the State Water Control Law. Nothing in this VWP general permit shall be construed to preclude the institution of any legal action under or relieve the permittee from any responsibilities, liabilities, or other penalties established pursuant to any other state law or regulation or under the authority preserved by § 510 of the Clean Water Act.
E. Property Rights
The issuance of this VWP general permit does not convey property rights in either real or personal property, or exclusive privileges, nor does it authorize injury to private property or invasion of personal property rights, nor infringement of federal, state or local laws or regulations.
F. Severability
The provisions of this VWP general permit authorization are severable.
G. Right of Entry
The permittee shall allow the board or its agents, upon the presentation of credentials, at reasonable times and under reasonable circumstances to enter the permittee's property, public or private, and have access to, inspect and copy records that must be kept as part of the VWP general permit conditions; to inspect facilities, operations or practices (including monitoring and control equipment) regulated or required under the VWP general permit; and to sample or monitor any substance, parameter or activity for the purpose of assuring compliance with the conditions of the VWP general permit or as otherwise authorized by law. For the purpose of this section, the time for inspection shall be deemed reasonable during regular business hours. Nothing contained herein shall make an inspection time unreasonable during an emergency.
H. Transferability of VWP General Permit Authorization
This VWP general permit authorization may be transferred to another person by a permittee when all of the criteria listed below are met. On the date of the VWP general permit authorization transfer, the transferred VWP general permit authorization shall be as fully effective as if it had been issued directly to the new permittee.
1. The current permittee notifies the board of the transfer of the title to the facility or property.
2. The notice to the board includes a written agreement between the current and new permittees containing a specific date of transfer of VWP general permit authorization responsibility, coverage and liability to the new permittee, or that the current permittee will retain such responsibility, coverage or liability, including liability for compliance with the requirements of enforcement activities related to the permitted activity.
3. The board does not notify the current and new permittees of its intent to modify or revoke and reissue the VWP general permit authorization within 15 days.
I. Notice of Planned Change
Authorization under the VWP general permit may be modified subsequent to issuance in one or more of the cases listed below. A notice of planned change is not required if the project results in additional temporary impacts to surface waters, provided that DEQ is notified in writing, the additional temporary impacts are restored to preexisting conditions in accordance with Part I C 11 of this general permit, and the additional temporary impacts do not exceed the general permit threshold for use. The permittee shall notify the board in advance of the planned change, and the planned change request will be reviewed according to all provisions of this regulation.
1. The permittee determines that additional permanent wetland, open water, or stream impacts are necessary, provided that the additional impacts are associated with the previously authorized activities in authorized locations within the same phase of development, the cumulative increase in acreage of wetland or open water impacts is not greater than 1/4 acre, the cumulative increase in stream bed impacts is not greater than 100 linear feet, and the additional impacts are fully compensated.
2. The project results in less wetland or stream impacts, in which case, compensation requirements may be modified in relation to the adjusted impacts at the request of the permittee, provided that the adjusted compensation meets the initial authorization compensation goals.
3. There is a change in the project plans that does not result in a change in project impacts.
4. There is a change in the mitigation bank at which credits are purchased or used, provided that the same amount of credits are purchased or used and all criteria for use are met, as detailed in 9 VAC 25-210-116 E.
5. Typographical errors need to be corrected.
J. VWP General Permit Authorization Termination for Cause
This VWP general permit authorization is subject to termination for cause by the board after public notice and opportunity for a hearing. Reasons for termination for cause are as follows:
1. Noncompliance by the permittee with any condition of the VWP general permit authorization;
2. The permittee's failure in the application or during the VWP general permit authorization issuance process to disclose fully all relevant facts or the permittee's misrepresentation of any relevant facts at any time;
3. The permittee's violation of a special or judicial order; and
4. A determination that the permitted activity endangers human health or the environment and can be regulated to acceptable levels by a VWP general permit authorization planned change or termination for cause.
K. VWP General Permit Authorization Termination by Consent
This VWP general permit authorization may be terminated by consent when all permitted activities requiring notification under 9 VAC 25-690-50 A and all compensatory mitigation have been completed or when the authorized impacts will not occur. The permittee shall submit a request for termination by consent within 30 days of project completion or project cancellation. When submitted for project completion, the termination by consent shall constitute a notice of completion in accordance with 9 VAC 25-210-130. The director may accept this termination of authorization on behalf of the board. The request for termination by consent shall contain the following information:
1. Name, mailing address and telephone number of the permittee;
2. Name and location of the activity;
3. The VWP permit authorization number; and
4. One of the following certifications:
a. For project completion:
"I certify under penalty of law that all activities and any required compensatory mitigation authorized by a VWP general permit have been completed. I understand that by submitting this notice of termination I am no longer authorized to perform activities in surface waters in accordance with the VWP general permit, and that performing activities in surface waters is unlawful where the activity is not authorized by a VWP permit. I also understand that the submittal of this notice does not release me from liability for any violations of this VWP general permit authorization."
b. For project cancellation:
"I certify under penalty of law that the activities and any required compensatory mitigation authorized by this VWP general permit will not occur. I understand that by submitting this notice of termination I am no longer authorized to perform activities in surface waters in accordance with the VWP general permit, and that performing activities in surface waters is unlawful where the activity is not authorized by a VWP permit. I also understand that the submittal of this notice does not release me from liability for any violations of this VWP general permit authorization, nor does it allow me to resume the permitted activities without reapplication and reauthorization."
c. For events beyond permittee control, the permittee shall provide a detailed explanation of the events, to be approved by DEQ, and the following certification statement:
"I certify under penalty of law that the activities or the required compensatory mitigation authorized by a VWP general permit have changed as the result of events beyond my control (see attached). I understand that by submitting this notice of termination I am no longer authorized to perform activities in surface waters in accordance with the VWP general permit, and that performing activities in surface waters is unlawful where the activity is not authorized by a VWP permit. I also understand that the submittal of this notice does not release me from liability for any violations of this VWP general permit authorization, nor does it allow me to resume the permitted activities without reapplication and reauthorization."
L. Civil and Criminal Liability
Nothing in this VWP general permit shall be construed to relieve the permittee from civil and criminal penalties for noncompliance.
M. Oil and Hazardous Substance Liability
Nothing in this VWP general permit shall be construed to preclude the institution of legal action or relieve the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be subject under § 311 of the Clean Water Act or §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law.
N. Duty to Cease or Confine Activity
It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the activity for which a VWP permit has been granted in order to maintain compliance with the conditions of the VWP permit.
O. Duty to Provide Information
1. The permittee shall furnish to the board any information which the board may request to determine whether cause exists for modifying, revoking and reissuing and terminating the VWP permit authorization, or to determine compliance with the VWP permit authorization. The permittee shall also furnish to the board, upon request, copies of records required to be kept by the permittee.
2. Plans, maps, conceptual reports and other relevant information shall be submitted as required by the board prior to commencing construction.
P. Monitoring and Records Requirements
1. Monitoring of parameters, other than pollutants, shall be conducted according to approved analytical methods as specified in the VWP permit. Analysis of pollutants will be conducted according to 40 CFR Part 136 (2000), Guidelines Establishing Test Procedures for the Analysis of Pollutants.
2. Samples and measurements taken for the purpose of monitoring shall be representative of the monitored activity.
3. The permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart or electronic recordings for continuous monitoring instrumentation, copies of all reports required by the VWP permit, and records of all data used to complete the application for the VWP permit, for a period of at least three years from the date of the expiration of a granted VWP permit. This period may be extended by request of the board at any time.
4. Records of monitoring information shall include, as appropriate:
a. The date, exact place and time of sampling or measurements;
b. The name of the individuals who performed the sampling or measurements;
c. The date and time the analyses were performed;
d. The name of the individuals who performed the analyses;
e. The analytical techniques or methods supporting the information such as observations, readings, calculations and bench data used;
f. The results of such analyses; and
g. Chain of custody documentation.
Q. Unauthorized Discharge of Pollutants
Except in compliance with this VWP general permit, it shall be unlawful for the permittee to:
1. Discharge into state waters sewage, industrial wastes, other wastes, or any noxious or deleterious substances;
2. Excavate in a wetland;
3. Otherwise alter the physical, chemical, or biological properties of state waters and make them detrimental to the public health, to animal or aquatic life, to the uses of such waters for domestic or industrial consumption, for recreation, or for other uses; or
4. On and after October 1, 2001, conduct the following activities in a wetland:
a. New activities to cause draining that significantly alters or degrades existing wetland acreage or functions;
b. Filling or dumping;
c. Permanent flooding or impounding; or
d. New activities that cause significant alteration or degradation of existing wetland acreage or functions.
DEPARTMENT OF THE ARMY
NORFOLK DISTRICT CORPS OF ENGINEERS
FORT NORFOLK 803 FRONT STREET
NORFOLK, VIRGINIA 23510-1096
CENAO-WRR
REGIONAL PROGRAMATIC GENERAL PERMIT
12-SPGP-01
Effective Date: May 31, 2012
Expiration Date: May 31, 2017
I. AUTHORITIES: 12-SPGP-01 authorizes the discharge of dredged or fill material in nontidal waters, of the United States, including wetlands, associated with certain residential, commercial, and institutional developments and linear transportation projects within the geographical limits of the Commonwealth of Virginia and under the regulatory jurisdiction of the U.S. Army Corps of Engineers, Norfolk District (Corps or Norfolk District). These projects must have no more than minimal individual and cumulative impacts and must meet all the terms and conditions outlined herein. The use of 12-SPGP-01 is restricted to those projects that have avoided and minimized impacts to waters of the U.S., including wetlands, to the maximum extent practicable.
The people of the Commonwealth of Virginia (Virginia or "the Commonwealth") are hereby authorized by the Secretary of the Army and the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. § 403) and Section 404 of the CWA (33 U.S.C. § 1344), to perform the aforementioned work in nontidal waters and wetlands of the Commonwealth as described herein. The Corps' authority and guidance to develop general permits is contained in 33 U.S.C. § 1344(e) and 33 C.F.R. § 325.2(e)(2), 33 C.F.R. § 325.3(b), and Corps Regulatory Guidance Letter 83-7.
II. PROCEDURES:
A. Delineation Confirmations: Prior to the submission of an application for any Residential, Commercial, or Institutional Development Activity or Linear Transportation Activity covered by 12-SPGP-01, a proponent must first obtain a confirmed delineation of all waters of the U.S., including wetlands, and Virginia state surface waters on the property. The applicant will contact the Corps to obtain a delineation confirmation. A confirmed delineation is not required for Virginia Department of Transportation (VDOT) linear transportation projects (these projects must adhere to separate, but similar, procedures). When appropriate a delineation confirmation may also be required from the Environmental Protection Agency (EPA).
B. Application: Applicants must use the newest version of Joint Permit Applications (JPAs) and submit these applications to the Virginia Marine Resources Commission (VMRC).
The applicable Virginia Water Protection (VWP) permit regulations define the information required for a complete VWP permit application (see 9 VAC 25-210-80, 9 VAC 25-660-50, 9 VAC 25-670-50, 9 VAC 25-680-50, and 9 VAC 25-690-50). This information, plus a confirmed delineation from the Corps with associated map(s) and data sheets, will be required to render an application complete for 12-SPGP-01 purposes. VDOT will submit the Inter-Agency Coordination Meeting JPA or the VDOT Reporting Only Spreadsheet. A joint permit application may be obtained through the following link:
http://www.nao.usace.army.mil/Regulatory Branch/JPA.asp
C. State Approvals: In order for 12-SPGP-01 to be valid, permittees must obtain the following state approvals prior to commencement of work in waters of the U.S.:
1. Virginia Department of Environmental Quality (VDEQ) VWP permit and
2. VMRC permit, when required
For the purpose of resolving non-compliance and/or enforcement actions the 12-SPGP-01 may be issued or modified in conjunction with a VDEQ informal resolution, letter of agreement, executive compliance agreement or consent order. Authorizations under 12-SPGP-01 also require that permittees ensure that their projects are designed and constructed in a manner consistent with all state and local requirements pursuant to the Chesapeake Bay Preservation Act (Virginia Code 10.1-2100 et seq.) and the Chesapeake Bay Preservation Area Designation and Management Regulations (9 VAC 10-20-10 et seq.), the Virginia Erosion and Sediment Control Regulations (4 VAC 30-50-10 et seq.), and the Virginia Stormwater Management Program (VSMP) Permit Regulation (4 VAC 50-60-10 et seq.). Authorizations under 12-SPGP-01 do not supersede state or local government authority or responsibilities pursuant to the Act.
D. Defmitions:
a. For purposes of 12-SPGP-01, "loss" of waters of the U.S., including wetlands, shall be defined as filling (including placement of pipes or other water conveyances in waters) and other permanent adverse effects, including mechanized landclearing, permanent conversion, excavation (including channelization), flooding, draining, etc. The acreage/linear footage of loss of waters of the U.S. is the threshold measurement of the impact to existing waters, including wetlands, for determining whether a project may qualify for 12-SPGP-01; it is not a net threshold that is calculated after considering compensatory mitigation that may be used to offset losses of aquatic functions and values.
b. For purposes of 12-SPGP-01, "natural stream design" means that the channel should mimic the dimension, pattern, and profile of a representative reference stream reach.
c. For purposes of 12-SPGP-01, VDEQ is the state agency responsible for ensuring permit applications meet the informational and technical requirements of the 12-SPGP-01 and for issuance of 12-SPGP-01 authorizations for qualifying Residential, Commercial, Institutional and Linear Transportation projects.
d. For purposes of 12-SPGP-01, the "permittee" will be the responsible party in receipt of the 12-SPGP-01 authorization from the VDEQ. The permittee will be the responsible party for complying with all 12-SPGP-01 general conditions as well as any additional special conditions required of each project.
e. For purposes of 12-SPGP-01, "lateral encroachment" is when a road, utility or other project encroaches into waters of the U.S., including wetlands, but does not cross the resource perpendicularly or diagonally.
III. AUTHORIZED ACTIVITIES
A. Residential, Commercial, and Institutional Development Activities:
a. Eligibility Criteria:
i. Activities are subject to Corps jurisdiction;
ii. Activity involves the discharge of dredged or fill material associated with residential, commercial, and institutional projects causing the permanent loss of not more than one acre of nontidal wetlands or open waters or the permanent loss of not more than 2,000 linear feet of stream channel, unless otherwise excluded by 12-SPGP-01;
iii. Activity meets the general conditions of 12-SPGP-01 listed on pages 7-14 and any special conditions required of each project-specific authorization;
iv. Compensatory mitigation is provided in accordance with the mitigation standards and general conditions on pages 10 -11; and
v. Discharges associated with residential, commercial, and institutional development activities include those outlined in the VDEQ's General Permits (see 9 VAC 25-660 et seq., 9 VAC 25-670 et seq., 9 VAC 25-680 et seq., and 9 VAC 25-690 et seq.) and are associated with the construction or expansion of residential, commercial, or institutional building foundations, building pads, and attendant features that are necessary for the use and maintenance of the structures. Attendant features may include, but are not limited to, roads, parking lots, garages, yards, utility lines, stormwater management facilities, and recreational facilities such as playgrounds, playing fields, and golf courses (provided the golf course is an integral part of the residential development). Residential developments include multiple and single unit developments. Commercial developments include retail stores, industrial facilities, restaurants, business parks, and shopping centers. Institutional developments include schools, fire stations, government office buildings, judicial buildings, public works buildings, libraries, hospitals, and places of worship. For residential, commercial, and institutional developments, the aggregate permanent loss of waters of the U.S. cannot exceed one acre of nontidal wetlands or open water;
or 2,000 linear feet of stream.
vi. Residential, commercial, or institutional developments are consistent with the Corps' subdivision guidance dated March 15, 1993 and June 2, 1999, the Corps' and VDEQs' joint subdivision guidance dated June, 2007 and/or any subsequent guidance that supersedes or supplements those documents.
b. Federal Screening Procedures:
i. All residential, commercial, and institutional development activities that will cause or result in impacts to tidal waters, including wetlands, and/or permanent impacts that exceed i/2 acre of non-tidal wetlands or open waters and/or exceed 300 linear feet of stream channel will be coordinated with the Corps, the U.S. Environmental Protection Agency (EPA), and the U.S. Fish and Wildlife Service (FWS) for federal review.
ii. If EPA or FWS determines that there are project-specific concerns regarding avoidance and/or minimization of impacts to the aquatic environment or concerns regarding the amount and/or type of compensatory mitigation being proposed, the applicant will be required to address those concerns. If the concerns are not addressed to the satisfaction of the objecting agency(ies), the Corps District Commander may exert his/her discretionary authority to require the project to be processed under the Corps' individual permit process.
iii. Any Corps' concerns shall be relayed to the VDEQ and addressed during the VDEQ permitting process. If concerns are not satisfied through that process, the Corps District Commander may exert his/her discretionary authority to require the project to be processed under an alternate Corps permitting process, possibly as an individual permit.
B. Linear Transportation Activities:
a. Eligibility Criteria:
i. Activities are subject to Corps jurisdiction;
ii. Activities involve the discharge of dredged or fill material associated with the construction, expansion, modification, or improvement of linear transportation projects not causing the permanent loss of more than 1/3 acre of waters of the U.S., including wetlands, at any single impact site with independent utility, unless otherwise excluded by 12-SPGP-01;
iii. Activity meets all general conditions of 12-SPGP-01 listed on pages 7-14 and any special conditions required of each project-specific authorization;
iv. Compensatory mitigation is provided for all unavoidable impacts to wetlands;
v. Compensatory mitigation is provided for all unavoidable stream impacts where total permanent impacts exceed 300 linear feet of stream channel (or mitigation for any lower level of impact if it is determined that it is necessary to ensure that a project's impacts are minimal in nature) in accordance with the mitigation standards general condition on pages 10-11.
Stream relocation using natural stream design may be considered self-mitigating, as determined on a case-by-case basis;
vi. Lateral encroachments may be authorized by the 12-SPGP-01 if the project meets the following criteria:
1. Impacts due to all project lateral encroachments, including stream relocations, do not exceed 1/3 acre of waters of the United States or 2,000 linear feet of stream channel;
2. Total project lateral encroachments do not cause the permanent loss of more than 300 linear feet of stream channel due to the installation of piping, riprap, concrete, etc;
3. All project lateral encroachments exceeding 300 linear feet of stream channel are performed using natural stream design (unless waived in writing); and
4. Impacts due to lateral encroachment(s), new alignment projects and/or projects that impact the same aquatic resources multiple times will be considered cumulative for the entire project regardless of whether segments of that project may have independent utility;
vii. Discharges associated with linear transportation projects include the construction, expansion, modification, or improvement of highways, roads, railways, trails, and airport runways and taxiways. Construction and/or relocation of utility lines within the right-of-way/easements of the project and performed in direct relation with the project are covered under this activity, with impacts counting toward permit thresholds.
b. Federal Screening Procedures:
i. All linear transportation activities involving permanent impacts that exceed 300 linear feet of stream channel at any single impact area OR containing multiple single and complete impact areas on the same project that additively exceed 1/3 acre of impact to waters of the United States, including wetlands and/or exceed 300 linear feet of stream channel (lateral or crossing impact) will be reviewed by the Corps, the EPA, and the FWS.
ii. If EPA or FWS determines that there are project specific concerns regarding avoidance and/or minimization of impacts to the aquatic environment or the amount and/or type of compensatory mitigation being proposed, the applicant will be required to address those concerns. If the concerns are not addressed to the satisfaction of the objecting agency(ies), the Corps District Commander may exert his/her discretionary authority to require the project to be processed under the Corps' individual permit process.
iii. Any Corps' concerns shall be relayed to the VDEQ and addressed during the VDEQ permitting process. If concerns are not satisfied through that process, the Corps District Commander may exert his/her discretionary authority to require the project to be processed under an alternate Corps permitting process.
c. VDOT Reporting-Only Procedures: VDOT may report by spreadsheet on a monthly basis to the VDEQ those VDOT projects meeting the following eligibility criteria:
i. Permanent impacts do not exceed 1/10 acre of waters of the United States, including wetlands; the definition of independent utility must be applied when determining permanent impact totals;
ii. Section 7 — Endangered Species Act Review has been completed, includes FWS concurrence with findings, if needed;
iii. Section 106 finding of "No Effect" has been reviewed and approved by the VDEQ- Cultural Resource Specialist; and
iv. For projects with cumulative impacts exceeding 300 linear feet of stream channel, a pre-coordination email will be sent to the Corps with a project description, impacts, topographic quadrangle and photos. The VDEQ and VDOT Central Office will be copied on the email. If the Corps concurs that project can be included on the spreadsheet, VDOT will include the Corps concurrence email with the spreadsheet submittal. No additional Norfolk District review will be required. If the Corps does not concur that project can be included on the spreadsheet, VDOT will submit a JPA through its interagency coordination meeting and will include the Corps' response email in the application.
C. Exclusions from Coverage: The following activities and resources areas are excluded from coverage by 12-SPGP-01 and require different types of Corps permits:
a. Conversion of waters and/or wetlands for agricultural production and agriculture-related activities (crop fields or pasture); farm buildings; grain storage facilities; grassed waterways; low water crossings; impoundments for irrigation, livestock watering, and fire prevention purposes; animal feeding operations; waste storage facilities; and farm access roads;
b. Wetland areas composed of 10% or more of the following species (singly or in combination) in any stratum: Atlantic white cedar (Chamaecyparis thyoides), bald cypress (Taxodium…