About this file
This file contains architectural and engineering drawings for HVAC replacement work at the Mt. Tabor Work Center Seasonal Housing facility for the U.S. Department of Agriculture Forest Service. The plans include detailed landscaping, floor plans, plumbing details, mechanical systems, and electrical diagrams for the crew quarters building.
The drawings specify the removal and replacement of existing AC units and furnaces, installation of new heat pumps, and associated electrical/plumbing modifications. Key details include domestic water heater piping details, mechanical floor plans showing locations of HVAC equipment, electrical power/signal plans, and equipment schedules for items like grilles, registers, diffusers, fans, furnaces, and air-cooled condensing units. The plans also contain detailed specifications for the mechanical and electrical systems, including control diagrams, panelboard schedules, and lighting fixture schedules. Optional bid items are highlighted in red text throughout the drawings, including replacement of the existing hot water heater, exhaust fans, and associated utility work to support those installations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12445525Q0005.pdf | ||
| A5-Mt. Tabor Crew Quarters HVAC Replacement_Site Map.pdf | ||
| A2-Mt. Tabor Crew Quarters HVAC Replacement_Schedule of Items.pdf | ||
| A3-Mt. Tabor Crew Quarters HVAC Replacement_Tech Specs.pdf | ||
| A1-Davis-Bacon Act WD-VT20240020.pdf | ||
| A6-Mt. Tabor Crew Quarters HVAC Replacement_Photos.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
davidpdonahue Polygon davidpdonahue Callout
· REMOVE & DISPOSE EXISTING A/C UNITS (4 TOTAL)
· INSTALL NEW A/C UNITS (4 TOTAL) - SEE SPECIFICATIONS
· MODIFY EXISTING ELECTRICAL AND/OR PLUMBING AS NEEDED TO FACILITATE INSTALLATION davidpdonahue Text Box WORK SPECIFIED IN RED TEXT. EXISTING PLANS ARE USED FOR INFORMATION ONLY. CONTRACTOR SHALL IS RESPONSIBLE TO VERIFY EXISTING CONDITIONS AND CONFIGURATION PRIOR TO STARTING WORK.
davidpdonahue Callout
· REMOVE AND DISPOSE EXISTING HOT WATER HEATER
· INSTALL NEW WATER HEATER - SEE SPECIFICATIONS
· MODIFY EXISTING ELECTRICAL AND/OR PLUMBING AS NEEDED TO FACILITATE INSTALLATION
Callout MODIFY PLUMBING & ELECTRICAL IN MECHANICAL ROOM AS NEEDED TO SUPPORT WORK SPECIFIED davidpdonahue Polygon davidpdonahue Callout
· REMOVE AND DISPOSE EXISTING HOT WATER HEATER
· INSTALL NEW WATER HEATER - SEE SPECIFICATIONS
REPLACE HOT WATER HEATER. SEE SPECIFICATIONS FOR PROPOSED WATER HEATER
davidpdonahue Callout
· REMOVE AND DISPOSE EXISTING PROPANE FURNACES
· INSTALL NEW PROPANE FURNACES
· MODIFY HVAC DUCTS AS NEEDED TO SUPPORT WORK SPECIFIED
davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Callout
REPLACE THERMOSTAT
davidpdonahue Callout
REPLACE THERMOSTAT
davidpdonahue Callout
REPLACE THERMOSTAT
davidpdonahue
REPLACE THERMOSTAT
davidpdonahue
OPTIONAL BID ITEM. REPLACE FOUR (4) EXHAUST FANS. MODIFY DUCTS AS NEEDED TO SUPPORT REPLACEMENTS.
davidpdonahue Callout OPTIONAL BID ITEM. REPLACE FOUR (4) EXHAUST FANS. REPLACE CONTROLS TO ENSURE FANS OPERATE AS SPECIFIEID.. EF-2 & EF-3 SHALL TO BE 150 CFM AND EF-4 & EF-5 SHALL TO BE 200 CFM.
davidpdonahue Polygon davidpdonahue
REPLACE FURNACES, COILS, AND A/C UNITS. SEE SPECIFICATIONS FOR PROPOSED REPLACEMENTS. EQUIPMENT COOLING AND HEATING LOADING SHALL BE SIZED TO MATCH EXISTING EQUIPMENT.
davidpdonahue Callout
· REMOVE & DISPOSE EXISTING A/C UNITS (4 TOTAL)
· INSTALL NEW A/C UNITS (4 TOTAL) - SEE SPECIFICATIONS
MODIFY ELECTRICAL IN MECHANICAL ROOM AS NEEDED TO SUPPORT WORK SPECIFIED.
davidpdonahue
OPTIONAL BID ITEM. REPLACE FOUR (4) EXHAUST FANS. MODIFY ELECTRICAL AS NEEDED TO SUPPORT REPLACEMENTS. MODIFY DUCT WORK AS REQUIRED TO SUPPORT FAN INSTALLATION AND PROPOER VENTILATION.
| Landscaping Drawings |
| L401_Enlarged Landscape Plan_Final Submission |
| L501_Site Details_Final Submission |
| First Floor Plan |
| Plumbing Plans |
| P001_Plumbing Legends Notes & Details_Final Submission |
| P101_Plumbing Floor Plan_Final Submission |
| P102_Plumbing Attic Plan_Final Submission |
| P601_Plumbing DWV Riser Diagram_Final Submission |
| P602_Plumbing Schedules_Final Submission |
| Mechanical Drawings |
| M001_Mechanical Legend-General Notes_Final Submission |
| M101_Mechanical Floor Plan_Final Submission |
| M102_Mechanical Attic Floor Plan_Final Submission |
| M501_Mechanical Details_Final Submission |
| M601_Mechanical Schedule_Final Submission |
| Electrical Plans |
| E101_Electrical Site Plan_Final Submission |
| E102_Power-Signal Floor Plan_Final Submission |
| E103_Lighting Floor Plan_Final Submission |
| E104_Electrical Attic Plan_Final Submission |
| E105_Electrical Details_Final Submission |
| E601_Electrical Schedules & Legends_Final Submission |
File details come from the government source that posted it. Updated .