A2-Mt. Tabor Crew Quarters HVAC Replacement_Schedule of Items.pdf

PDF 122 KB Posted

Attached to
GMF MT. TABOR HVAC
Solicitation number
12445525Q0005
Issued by

About this file

This file is a Schedule of Items for HVAC replacement work at the Mt. Tabor Crew Quarters in the Green Mountain National Forest's Manchester Ranger District, Rutland County. The base bid (Item 01) requires removal and replacement of four propane furnaces, four A/C condensing units, and one propane hot water heater, along with associated demolition, installation of new thermostats, and HVAC/plumbing/electrical work. The work is to be priced as a lump sum item.

The optional bid item (Item 02) involves the removal and replacement of four exhaust fans with new units, including all associated plumbing, electrical, and control work, also priced as a lump sum item. The contractor is responsible for properly sizing all equipment and piping according to specifications and applicable building codes. The schedule contains blank spaces for contractors to input their unit prices and total prices for both the base bid and optional items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

Mt. Tabor Crew Quarters HVAC Replacement

Green Mountain National Forest Manchester Ranger District

Rutland County

ITEM DESCRIPTION – BASE BID

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

At the Mt. Tabor Crew Quarters on the Manchester District on the Green Mountain National Forest remove four (4) propane furnaces, four (4) A/C condensing units, and (1) propane hot water heater. Replace them with four (4) new propane furnaces, 4 new A/C condensing units, new hot water heater. This work includes, but is not limited to, selective demolition, removal of existing furnaces, A/C units, and water heater, installation of new furnaces, new A/C units, new water heater, new thermostats, and associated HVAC/plumbing/electrical work. Contractor shall be responsible to size all equipment and piping as required by this specification and in accordance with applicable building codes.

Lump Sum

1 ________ ________

Base Bid Total

ITEM DESCRIPTION – OPTIONAL BID ITEM

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

Remove four (4) existing exhaust fans, install four (4) new exhaust fans, and all associated plumbing/electrical/control work.

Lump Sum

1 ________ ________

Optional Bid

Item Total