A3 Thorne Bay Quad 1 Photos.pdf

PDF 4 MB Posted

Attached to
Thorne Bay Quad 1 Renovation Federal contract opportunity
Solicitation number
12010920R0010
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

This document outlines a federal contract opportunity for renovations to housing units in Thorne Bay, Alaska. The Tongass National Forest is soliciting proposals to conduct construction work on four units in Quad 1 to provide ABA upgrades and replace garage doors across the entire housing complex. Specific work includes replacing windows, doors, flooring, and fixtures; modifying walls, sinks, and other elements to comply with ADA standards; and other renovations as detailed in the attached statement of work. Interested contractors must be active in SAM and submit proposals by email no later than September 25, 2020. The pre-proposal teleconference was held on August 26, 2020. The Department of Agriculture Forest Service R10-Alaska Region is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Thorne Bay Quad 1 Renovation, newest first.
File Type Posted
12010920R0010_A04.pdf PDF
12010920R0010_A03.pdf PDF
12010920R0010_ Amendment_0002.pdf PDF
A4 Thorne Bay QUAD 1 Plans Signed.pdf PDF
12010920R0010_Amendment 0001.pdf PDF
12010920R0010_Pre Prop Meeting Agenda_and_Notes.pdf PDF
A1 TBRD_Quad1Reno_SOW_ FINAL.PDF PDF
12010920R0010_Thorne Bay Quad 1 Renovations.pdf PDF
A4 Thorne Bay QUAD 1 Plans DRAFT.pdf PDF
A2 Thorne Bay Quad 1 Existing Drawings.pdf PDF
A5 DBA AK20200005_ 06262020_ Mod 2.pdf PDF
A1 TBRD Quad 1 Renovation SOW DRAFT.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Entry Way into Quad 1

Window Trim 3.5” wide – This contract will match this trim on 16 windows and 4 patio doors

Garage door 8’ Wide by 7’ High – 12 of these need replaced with Option 4

Kitchen space in ADA Unit – Sink will be roll under with ADA compliant appliances and lower shelves/counters

Kitchen space (in non-renovated Quad 1, 1BR unit)

Living room space (in renovated Quad 3, 2BR unit). Notice vinyl rectangle in front of sliding glass door. This will be matched on this contract

Bathroom and bedroom hallway in ADA Unit – This area will need wall demo, removing closet to make space in the bathroom for ADA features and a wider door

Unit entrance doors, 36” wide with utility sink and washer dryer next to that.

Main entrance door will need to be made ADA compliant.

Entrance into ADA unit will need to be made compliant.

Bathroom space in ADA unit-will need to be made ADA compliant and require new shower, and switching toilet and sink so toilet can have hand hold rails. Sink will need to allow wheelchair to roll under.

Existing tile to be removed.

Thick bedroom carpeting (In Quad 1), to be removed.

Living room space (Quad 1, 1BR) and former location of wood burning stoves. Carpeting and tiling to be removed.

Wall to be moved in the mechanical room. Will require some utility moves.

Wall on the right will need to be setback to allow wheelchair access into ADA unit. (Opposite side of mechanical room)

Demo second floor chimney chase and tile flooring

Carpet removal on stairs

6040 to be replaced with horizontal slider (6 total)

7240 to be replaced with horizontal slider (4 total)

3036 kitchen window to be replaced with horizontal sliders

Existing patio door – Will be replaced with sliding glass door (4)

1860 fixed to be replaced

2460 fixed to be replaced

File details come from the government source that posted it. Updated .