12010920R0010_A03.pdf
PDF 93 KB Posted
- Attached to
- Thorne Bay Quad 1 Renovation Federal contract opportunity
- Solicitation number
- 12010920R0010
About this file
This document outlines requirements for the Thorne Bay Quad 1 Renovation federal contract opportunity. The U.S. Forest Service is seeking construction services to renovate four units in Quad 1 in Thorne Bay, Alaska, which includes ADA upgrades and garage door replacements for the entire complex. A pre-proposal teleconference will be held on August 26th and proposals must be emailed to the points of contact by September 25th. The scope of work involves kitchen, bathroom, and other renovations for accessibility compliance as well as replacement of one dishwasher. Clarification was provided that three toilets total require replacement. Contractors must be registered in the System for Award Management to be eligible.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12010920R0010_A04.pdf | ||
| 12010920R0010_ Amendment_0002.pdf | ||
| A4 Thorne Bay QUAD 1 Plans Signed.pdf | ||
| 12010920R0010_Amendment 0001.pdf | ||
| 12010920R0010_Pre Prop Meeting Agenda_and_Notes.pdf | ||
| A1 TBRD_Quad1Reno_SOW_ FINAL.PDF | ||
| A3 Thorne Bay Quad 1 Photos.pdf | ||
| 12010920R0010_Thorne Bay Quad 1 Renovations.pdf | ||
| A4 Thorne Bay QUAD 1 Plans DRAFT.pdf | ||
| A2 Thorne Bay Quad 1 Existing Drawings.pdf | ||
| A5 DBA AK20200005_ 06262020_ Mod 2.pdf | ||
| A1 TBRD Quad 1 Renovation SOW DRAFT.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12010920R0010 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
JUNEAU AK 99802
709 WEST 9TH STREET
ALASKA REGIONAL OFFICE
09/16/20200003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/24/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Thorne Bay Quad 1 Renovation
This amendment issued for the following reasons:
1. Replace the wording in Section L, 52.215-1 Addendum, (6) (a) Past Performance in its entirety with the following:
Past Performance: Submit a list of relevant projects completed within the last five (5) years, of the date proposals are due, that are similar in scope and complexity to the project identified in this solicitation. For each project, submit the project name, location, description of the work, dollar value and name/phone/email of project owner representative.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DENISE MURPHY
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12010920R0010/0003
2. Replace the wording in Section M.3 ¿
Evaluation Procedures, 1. Past Performance in its entirety with the following:
Evaluation (Section M): Past performance is a measure of the degree to which the offeror
(including major subcontractors identified in the offeror's proposal) has satisfied previous customers and complied with Federal, State and
Local laws and regulations. The Government will contact references to assess the quality of the contractor's work, including history of quality workmanship, timely completion, reasonable and cooperative behavior, concern for customer satisfaction and compliance with contract requirements. The Government will consider the currency and relevance of the information, sources of the information, context of the data and general trends in the contractor performance.
The past performance evaluation will characterize the level of the Government's confidence that the offeror will successfully complete the work, in compliance with all contract requirements, based on its record of successful performance on recent and relevant similar projects.
In the past performance evaluation, the
Government may use information from sources other than the offeror's proposal. Other sources of information, may include, but are not limited to:
Federal, State and Local government agencies, better business bureaus, published media and electronic databases such as the Contractor
Performance Assessment Reporting System (CPARS).
Where there is little or no information available regarding the offeror's past performance history because the offeror is new to the marketplace, the past performance evaluation may take into account information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the work. When no information is available, the offeror will not be evaluated favorably or unfavorably on past performance.
3. Respond to questions, regarding the Statement of Work (SOW), received via email.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12010920R0010/0003
Emailed Question: Clarification request on
Kitchen sink model SOW pg. 16 12.3 indicates a
Elkay DLR332210 and Delta 400-WFELHHDF faucet
A-02 Equipment Schedule indicates Kohler
K-RH5267-4-NA for both the "accessible" and
"remaining" units. What does the Forest Service want?
Forest Service Response: The kitchen sinks will be the Kohler K-RH5267-4-NA in the non-ABA units.
The SOW is for for the non-ABA units. The ABA equipment identified on A-02 (Washer, Dryer, Oven, Dishwasher) are all ABA compliant. The kitchen sink (Kohler K-RH5267-4-NA) is not ABA compliant. The Forest Service did not directly specify the equipment required for the ABA unit in terms of toilet, shower/tub, bathroom sink, kitchen sink. The Forest Service provided the
ABA requirements and it is up to the contractor to provide equipment that meets ABA requirements.
Additionally, the Forest Service is not replacing appliances in the non-ABA units except for the one (1) dishwasher in Unit 14.
Emailed Question: Clarify number of toilets
Forest Service response: Only three (3) toilets are required. The toilet in Unit 14 (2 Bedroom, upstairs, non-ABA) was replaced last year.
All other terms and conditions remain unchanged.
Proposals need to be emailed to denise.murphy@usda.gov and michael.t.mccarthy@usda.gov by 10:00 a.m.(AS)
September 25, 2020
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .