A3_-_Price_Schedule.pdf

PDF 232 KB Posted

Attached to
GRSM Recreation Building at LeConte Lodge Demoliti
Solicitation number
140P5326R0008
Issued by

About this file

This is a Base Price Schedule for a federal contract opportunity issued by the National Park Service (Great Smoky Mountains National Park) for the LeConte Lodge Recreation Building demolition project located in Sevier County, Tennessee, with a deadline of March 5, 2026.

The contract is organized into three primary phases: Mobilization, Demolition, and Demobilization. The Mobilization section (Section 1.0) includes three line items: Initial Airlift, Traffic Control, and Transport of Contractor's Tools & Equipment, each priced on a lump-sum (LS) basis. The Demolition section (Section 2.0) comprises seven line items covering Travel/Field Overhead for Crew, Erosion Control, Salvage Tongue and Groove Boards, Timber Structure Demolition, Building Foundation Demolition, Site Clean-up Immediate to Building Footprint, and Grading & Seeding—all on an LS basis. The Demobilization section (Section 3.0) includes four line items: Clean-up, Final Airlift, Traffic Control, and Transport of Demolished Materials, Contractor's Tools & Equipment, also priced on an LS basis. All quantities are listed as 1 unit per line item. The pricing template provides blank spaces for contractors to enter unit costs, with subtotals for each section and a final total cost line, though specific dollar amounts are not populated in this template document.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LeConte Lodge Recreation Building 3/5/2026 Sevier County, TN

ITEM DESCRIPTION QTY. UNIT COST

1.0 Mobilization

1.1 Initial Airlift 1 LS

1.2 Traffic Control 1 LS

1.3 Transport of Contractor's Tools & Equipment 1 LS

SUBTOTAL:

2.0 Demolition

2.1 Travel/ Field Overhead for Crew 1 LS

2.2 Erosion Control 1 LS

2.3 Salvage Tongue and Groove Boards 1 LS

2.4 Timber Structure Demolition 1 LS

2.5 Building Foundation Demolition 1 LS

2.6 Site Clean-up Immediate to Building Footprint 1 LS

2.7 Grading & Seeding 1 LS

SUBTOTAL:

3.0 Demobilization

3.1 Clean-up 1 LS

3.2 Final Airlift 1 LS

3.3 Traffic Control 1 LS

3.4 Transport of Demolished Materials, Contractor's Tools & 1 LS

Equipment

SUBTOTAL:

TOTAL:

BASE PRICE SCHEDULE