A3 AF 66 LTUY232039 (for RFP).xlsx

XLSX spreadsheet 29 KB Posted

Attached to
LTUY232039 Replace Boiler with Heat Pump, Bldg 290 (DESIGN-BUILD) - CANCELLED
Solicitation number
W50S8K25RA003
Issued by

About this file

This file is a Schedule of Material Submittals for a Design-Build contract (Solicitation W50S8K25RA003) to replace the heating and cooling systems at Building 290, Jefferson Barracks Air National Guard Station. The project involves replacing an existing hot water boiler with an air source heat pump system, installing seven lighting occupancy sensors, replacing the domestic water heater, and implementing a Direct Digital Controls (DDC) system. The material submittal schedule outlines 15 specific submission requirements with detailed timelines ranging from 45 to 160 days after Notice to Proceed (NTP).

Key submission categories include system components (air source heat pump, digital control, domestic hot water), shop drawing packages, operations and maintenance manuals, system tests and reports, and quality control plans. The contract is set aside 100% for small businesses under NAICS Code 238220, with a small business size standard of $19 million and a government budget of $150,000. The total contract duration is 180 calendar days, covering system installation, inspections, and punch list completion, with submissions required for various technical documentation, certifications, manufacturer's data, and test reports.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER LTUY232039 PROJECT TITLE Install Ground Source Heat Pump Building 290 SOLICITATION / CONTRACT NO.

W50S8K25RA003

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

1Air Source Heat Pump System Components, SD-03(G)11111160 Days After NTP
2System Materials and Components,, SD-03(G), Piping, Valves, Valves, Pipe Insutation11111145 Days After NTP
3Digital Control System Components, SD-03(G)11111160 Days After NTP
Domestic Hot Water System Components, SD-0311111145 Days After NTP
5Lighting Control Occupany Sensors, SD-03(G)111145 Days After NTP
6Shop Drawing Package (100%), SD-02(G)111160 Days After NTP
7Operations and Maintenance Manuals, SD-10(G)111160 Days After NTP
8Final System Tests and Reports, SD-06(G), i.e TAB, refrigerant piping leakage tests111160 Days After NTP
9Contractor Quality Control Plan, SD-01(G)160 Days After NTP
10Construction Waste Plan Preconstruction, SD-01(G)160 Days After NTP
11Construction Waste Plan Closeout, SD-11(S)1160 Days After NTP
12Design Phase - Type A (G)111145 Days After NTP
13Design Phase - Type B, Shop Drawing Package (95), SD-02(G)1111130 Days After NTP Phase A
14Operation and Maintenance Training and O&M documenation111At Project Closeout
15
16
17
18
19
20
21
22
23
24
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

Sheet1

File details come from the government source that posted it. Updated .