A3 AF 66 LTUY202054 Roofs 50 53 59.pdf

PDF 185 KB Posted

Attached to
LTUY202054 Repair Roofs, Buildings 50, 53, and 59
Solicitation number
W50S8K25BA003
Issued by

About this file

This document is a Required Submittal Date Reference Key for a roofing project covering Buildings 50, 53, and 59 at Jefferson Barracks Air National Guard Station. The submittal matrix details 14 specific roofing-related items requiring documentation and approval, including roof shingles, attic ventilation, gutters, downspouts, flashing, fascia, lightning protection systems, and warranty documentation. Each line item requires multiple types of submissions such as product data, shop drawings, samples, and manufacturer's recommendations, with most items needing submission no more than 15 business days after Notice to Proceed (NTP). The document specifies that all roofing components must be State Historic Preservation Office (SHPO) approved, and includes requirements for various warranties, including a limited lifetime shingle warranty and a 5-year water-tight contractor warranty.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Required Submittal Date Reference Key

Last # REMARKS

Notes for Description & Copies columns.

A. If exact match per SOW, sample not required.

B. If exact match per SOW, color selection not req'd

SU

BM

IT

TA

L N

U M

BE

R

1 Roof Shingles and all components of roofing system, including but not limited to underlayment, drip edge, ice shield, starter strips, ridge caps, etc.

Must be SHPO approved

1 1 1 1 1 1 Note 3

2 Attic ventilation components covering all three buildings Must be SHPO approved

1 1 1 1 Note 3

3 Gutters and Downspouts Must be SHPO approved

1 1 1 1 Note 3

3.1 Splash Blocks 1 Note 3

3.2 Bldg 59 Pop up drain emitter, drain pipe

and installation details 1 1 1 1 1 Note 3

3.3 Bldg 59 Leaf Guards 1 1 1 1 Note 3

4 Step Flashing & Other Flashing 1 1 1 Note 3 5 Metal Fascia and Soffit Materials 1 1 1 Note 3 6 Bldg 59 Wood fascia, trim & molding 1 1 1 Note 3

6.1 Wood covering for beams on south porch

of bldg 59

1 1 1 Note 3

7 Bldg 50 Mezzanine floor material 1 1 Note 3 8 Roof deck Underlayment & dimensional framing lumber 1 Note 3

9 Lightning Protection System 1 1 1 1 1 1 Note 3 10 LPS Certification documents 1 1 Note 8 11 Fall Protection Anchor Points, Include Plan

View of Building 1 1 1 Note 3

12 Warranty, Shingle, Limited Lifetime Warranty Certificate

1 Note 10

13 Warranty, General Contractor's 5 year water - tight warranty

1 Note 9

W

AR

R

AN

TY

D

O C

U M

EN

TA

TI

O

N

A pp ro ve d

N o

Ex ce pt io ns T ak en

Ap pr ov ed a s

N ot ed

R ev is e an d

R es ub m it

D is ap pr ov ed

R

EQ

U

IR

ED

S U

BM

IT

TA

L

D

AT

E

STATUS CODENO. OF COPIES REQUIRED

D

AT

E R

EC

EI

VE

D

B Y

C O

N

TR

AC

TI

N G

D

AT

E R

EC

EI

VE

D

B Y

C

IV

IL

E

N G

IN

EE

R

IN

G

D

AT

E R

ET

U

R N

ED

T

O C

O N

TR

AC

TI

N

G

D

AT

E C

O N

TR

AC

TO

R

N O

TI

FI

ED

7. NLT 15 work days before Pre-Final Inspection.

8. NLT 2 work days before Pre-Final Inspection.

9. No more than 5 work days after final inspection.

10. No more than 5 work days after completion of work item.

4. NLT than 10 work days before site delivery

5. NLT than 10 work days before specific work element begins.

6. NLT 10 work days before commencement of project.

Notes for Submittal Dates

1. Pre-Construction Meeting

2. As Required

3. No more than 15 business days after NTP

C an ce lle d

LI

N

E N

U M

BE

R

S

AF

ET

Y

D

AT

A

SH

EE

TS

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

P R

O D

U C

T D

AT

A

S H

O P

D R

AW

IN

G S

S

AM

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N S

P R

O D

U C

T

TE

ST

R

EP

O

R

TS

F

IE

LD

Q

U

AL

IT

Y-

C O

N

TR

O L

T

ES

T R

EP

O

R

TS

O

TH

ER

S

PE

C

IF

IE

D M

AT

ER

IA

LS

D

AT

A, O R

S C

H

ED

U

LE

S

IN

ST

AL

LA

TI

O

N

O

PE

R

AT

IN

G

M

AI

N

TE

N

AN

C E

IN

ST

R U

C

TI

O N

S

14 Ventilation Shop Drawings 1 Note 3