This document comprises Special and Supplemental Conditions modifying the AIA A201-2017 General Conditions of the Contract for Construction, applicable to ITB 25-164 for construction of a new Animal Shelter Facility in Lecanto, Florida, issued by Citrus County. The project involves construction of a one-story building encompassing approximately 25,500 to 33,400 square feet with kennels, administrative offices, a veterinary clinic, and comprehensive site work including utilities, drainage, grading, paving, sidewalks, landscaping, irrigation, fencing, and directional signage. A non-mandatory pre-bid conference and site visit are scheduled for October 22, 2025, at 10:00 am, with bids due December 10, 2025, at 2:00 pm. Board approval and contract award are anticipated for January 6, 2026. The contract duration extends 480 days for substantial completion and 510 days for final completion from the Notice to Proceed. The County has appropriated approximately $9,000,000 for this project, with potential variations based on funding availability.
The supplemental conditions establish modified requirements for contract administration, indemnification, change orders, payment processing, insurance and bonding, dispute resolution, and testing and inspections. Key modifications include: contractor obligation to conduct pre-bid site visits; indemnification protection for Owner, Engineer, and Architect from contractor negligence; requirement for written amendments for additional work; payment processing within seven days per the Florida Local Government Prompt Payment Act (Chapter 218, Part VII); surety bonds meeting Florida Statutes Section 255.05 with A.M. Best's Rating of A- VI or better; comprehensive final payment documentation requirements including as-built documents and operations and maintenance manuals; and elimination of mediation and arbitration provisions in favor of litigation in Citrus County State Court under Florida law. Insurance requirements mandate $5,000,000 in Commercial General Liability, $5,000,000 in Automobile Liability, Workers Compensation insurance, and additional coverages. All testing, inspections, and approvals costs are borne by the contractor, who must also arrange for independent testing laboratory services acceptable to the Owner.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL AND SUPPLEMENTAL CONDITIONS
AIA A201-2017 GENERAL CONDITION OF THE CONTRACT FOR CONSTRUCTION
THE FOLLOWING ARE MODIFICATIONS, ADDITIONS, AND DELETIONS
ARTICLE -1 The Contract Documents
SC 1.1.1 Delete paragraph 1.1.1 in its entirety and insert the following in its place:
The Contract Documents are enumerated in the Agreement between the Owner and Contractor
(hereinafter the Agreement) and consist of the Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contract, Project Manual and the Bid or Proposal Documents prepared and submitted by the Owner and the Contractor's Bid or Proposal submitted by the Contractor, to the extent they do not conflict with the terms of the Agreement, and any other documents listed in the
Agreement, and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction
Change Directive, or (4) a written order for a minor change in the Work issued by the Architect.
Unless specifically enumerated in the Agreement, the Contract Documents include the advertisement or Invitation to bid, Instructions to Bidders, Required Bid Forms, sample forms, Sample of County and Contractor Agreement and other information furnished by the Owner in anticipation of receiving bids or proposals, the Contractor’s bid or proposal, or portions of Addenda relating to bidding or proposal requirements. The contract documents identified in this Section shall prevail in case of an inconsistency with subsequent versions made through manipulable electronic operations. In the absence of individual signatures by Owner and Contractor the Contract
Documents identified in the signed contract prevail.
SC 1.1.2 Delete the words “The Contract may” in the third sentence and replace with “After execution of the Original Contract Documents the contract may thereafter”
Add the word “written” before the word “Modification” in the third sentence.
SC 1.1.3 Add the following to end of the paragraph: “The Work shall include the obligation of the Contractor to visit the site of the project prior to submitting a Bid/proposal. Such site visit shall be for the purpose of familiarizing the Contractor with the conditions as they exist and the character of the operations to be carried under the Contract Documents, including, all existing site conditions, access to the site, physical characteristics of the site and surrounding areas”.
SC 1.3 Capitalization: Add the following to end of paragraph “and documents published by Owner.”
SC 1.8 Building Information Models Use and Reliance: First sentence, delete the following “without agreement to written protocols governing the use of, and reliance on, the information contained in the model”
ARTICLE – 2 OWNER
2.3 Information and Services Required of the Owner
SC 2.3.6 Delete the word “Copy” on first line and replace with the following “Electronic Copy in PDF
Format”
ARTICLE – 3 CONTRACTOR
3.1 General
SC 3.1.1 Delete the words on the 2nd and third line “if required in the jurisdiction”
3.18 Indemnification
SC 3.18.1 Delete 3.18.1 in its entirety and insert the following in its place:
Contractor shall indemnify save and hold harmless Owner and Engineer and Architect, their officers and employees, from liabilities, damages, losses and costs, including, but not limited to, reasonable attorney’s fees, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of contractor and persons employed or utilized by Contractor, including any subcontractors, in the performance of the construction contract. Neither Contractor nor any of its agents will be liable under this section for damages arising out of injury or damage to persons or property directly caused or resulting from the sole negligence of Owner or any of its officers, agents, or employees. The parties agree that this clause shall not waive the benefits or provisions of Section 768.28, Florida Statutes, or any similar provision of law. The provisions and obligations of this section shall survive the expiration or earlier termination of this Agreement. To the extent considered necessary by Owner, any sums due Contractor under this Agreement may be retained by Owner until all of Owner’s claims for indemnification pursuant to this Agreement have been settled or otherwise resolved; and any amount withheld shall not be subject to payment of interest by Owner.
ARTICLE – 7 CHANGES IN THE WORK
7.2 Change Orders
SC 7.2.1 Add the following new paragraph immediately after paragraph GC 7.2.1
7.2.2 If Owner identifies any additional Work to be provided by Contractor that is not covered under the original Agreement, such additional Work, contract sum and contract time shall be made a part of this Agreement by a written Amendment.
ARTICLE – 8 TIME
8.3 Delays and Extension of Time:
SC 8.3.1 Delete item No. “(4)” in its entirety.
ARTICLE – 9 PAYMENTS AND COMPLETION
9.3 Application for Payment
SC 9.3.1 Delete “if required” located on the third line
SC 9.3.2 Delete 9.3.2 in its entirety.
SC 9.7 Failure of Payment
Replace with the following: “If the Architect does not issue a Certificate for Payment, through no fault of the Contractor, within seven days after receipt of the Contractor’s Application for Payment, or if the Owner does not pay the Contractor within seven days after the date established by Chapter
218, Part VII of the Florida Statutes “Local Government Prompt Payment Act” defined in the
Contract Document, the amount certified by the Architect, then the Contractor may, upon seven additional days’ notice to the Owner and Architect, stop the Work until payment of the amount owing has been received. The Contract Time shall be extended appropriately, and the Contract Sum shall be increased by the amount of the Contractor’s reasonable costs of shutdown, delay and start-up, plus interest as provided for in the Contract Documents.”
9.10 Final Completion and Final Payment
SC 9.10.2 Replace 9.10.2 with the following:
Neither final payment nor any remaining retained percentage shall become due until the Contractor submits to the Architect (1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Work for which the Owner or the Owner’s property might be responsible or encumbered (less amounts withheld by Owner) have been paid or otherwise satisfied, (2) a certificate evidencing that insurance required by the Contract Documents to remain in force after final payment is currently in effect, (3) a written statement that the Contractor knows of no reason that the insurance will not be renewable to cover the period required by the Contract
Documents, (4) consent of surety, if any, to final payment, (5) documentation of any special warranties, such as manufacturers’ warranties or specific Subcontractor warranties, (6) Original
Contractor’s set of As-Built documents and O&M Manuals for the Project, (7) All certifications and site surveys required to close out site permits, and (8) if required by the Owner, other data establishing payment or satisfaction of obligations, such as receipts and releases and waivers of liens, claims, security interests, or encumbrances arising out of the Contract, to the extent and in such form as may be designated by the Owner. If a Subcontractor refuses to furnish a release or waiver required by the Owner, the Contractor may furnish a bond satisfactory to the Owner to indemnify the Owner against such lien, claim, security interest, or encumbrance. If a lien, claim, security interest, or encumbrance remains unsatisfied after payments are made, the Contractor shall refund to the Owner all money that the Owner may be compelled to pay in discharging the lien, claim, security interest, or encumbrance, including all costs and reasonable attorneys’ fees.
ARTICLE 11 INSURANCE AND BONDS
11.1 Contractor’s Insurance and Bonds
SC 11.1.4 Delete 11.1.4 in its entirety, see insurance requirements in the Contract documents and the
Agreement between Owner and Contractor.
Add the following new paragraph immediately after Paragraph 11.1.4.
SC 11.1.5 The Bonds shall be in the form prescribed in Section 255.05 Florida Statutes. The rating of the surety company shall be rated A.M. Best’s Rating of A-, VI or better. The surety company executing the Bonds must be authorized to transact business in the State of Florida. Attorney-in-
Fact who signs the Bonds must file with each Bond a certified and effective date copy of their
Power of Attorney. The Bonds must show the name, address and phone number of the
Vendor/Contractor, Surety Company, and County. Furthermore, the Bonds must indicate the Bid
Number, a general description of the project, and the address of the Project Site.
11.2 Owner’s Insurance
SC 11.2.1 Delete 11.2.1 in its entirety
SC 11.2.2 Delete 11.2.2 in its entirety.
SC 11.2.3 Delete 11.2.3 in its entirety.
11.3 Waiver of Subrogation
SC 11.3.1 Delete 11.3.1 in its entirety, see insurance requirements in the Contract documents and the
Agreement between Owner and Contractor.
SC 11.3.2 Delete 11.3.2 in its entirety, see insurance requirements in the Contract documents and the
Agreement between Owner and Contractor.
11.4 Loss of Use, Business Interruption, and Delay in Completion Insurance
Delete 11.4 in its entirety
11.5 Adjustment and Settlement of Insured Loss
SC 11.5.1 Delete last Sentence in 11.5.1 “The Owner shall pay the Architect and Contractor their just shares of insurance proceeds received by the Owner, and by appropriate agreements the Architect and
Contractor shall make payments to their consultants and Subcontractors in similar manner.”
SC 11.5.2 Delete 11.5.2 in its entirety
ARTICLE 13 MISCELLANEOUS PROVISIONS
13.1 Governing Law
SC 13.1 Delete 13.1 in its entirety and replace with the following
“The Agreement shall be governed in accordance with the laws of the State of Florida. In the event of litigation with respect to the obligation of the parties to the Agreement, the jurisdiction and venue of such action shall be an appropriate State Court in Citrus County, Florida.”
13.4 Tests and Inspections
SC 13.4.1 Delete 13.4.1 in its entirety and replace with the following:
“Tests, inspections, and approvals of portions of the Work shall be made as required by the Contract
Documents and by applicable laws, statutes, ordinances, codes, rules, and regulations or lawful orders of public authorities. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections, and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and Contractor shall bear all related costs of tests, inspections, and approvals. The Contractor shall give the Architect timely notice of when and where tests and inspections are to be made so that the Architect may be present for such procedures. The Contractor shall bear costs of tests, inspections, or approvals that do not become requirements until after bids are received or negotiations concluded. The Contractor shall directly arrange and pay for tests, inspections, or approvals where building codes or applicable laws or regulations so require.”
SC 13.4.2 Delete 13.4.2 I its entirety and replace with the following:
“If the Architect, Owner, or public authorities having jurisdiction determine that portions of the
Work require additional testing, inspection, or approval not included under Section 13.4.1, the
Architect will, upon written authorization from the Owner, instruct the Contractor to make arrangements for such additional testing, inspection, or approval, by an entity acceptable to the
Owner, and the Contractor shall give timely notice to the Architect of when and where tests and inspections are to be made so that the Architect may be present for such procedures. Such costs, except as provided in Section 13.4.3, shall be at the Contractor’s expense.”
ARTICLE 15 CLAIMS AND DISPUTES
15.1 Claims
SC 15.1.3 Notice of Claim
Delete 15.1.3 in its entirety
SC 15.1.7 Waiver of Claims for Consequential Damages
Delete 15.1.7 in its entirety.
15.2 Initial Decision
SC 15.2.1 Delete 15.2.1 in its entirety.
SC 15.2.2 Delete 15.2.2 in its entirety
SC 15.2.3 Delete 15.2.3 in its entirety
SC 15.2.4 Delete 15.2.4 in its entirety
SC 15.2.5 Delete part of last sentence that reads “on the parties but subject to mediation and, if the parties fail to resolve their dispute through mediation, to binding dispute resolution”. Add a period (.) after
“final and binding”.
SC 15.2.6 Delete 15.2.6 in its entirety.
SC 15.2.6.1 Delete 15.2.6.1 in its entirety.
15.3 Mediation
SC 15.3.1 Delete 15.3.1 in its entirety
SC 15.3.2 Delete 15.3.2 in its entirety
SC 15.3.3 Delete 15.3.3 in its entirety
SC 15.3.4 Delete 15.3.4 in its entirety
15.4 Arbitration
SC 15.4.1 Delete 15.4.1 in its entirety
SC 15.4.1.1 Delete 15.4.1.1 in its entirety
SC 15.4.2 Delete 15.4.2 in its entirety
SC 15.4.3 Delete 15.4.3 in its entirety
15.4.4 Consolidation or Joinder
SC 15.4.4.1 Delete 15.4.4.1 in its entirety
SC 15.4.4.2 Delete 15.4.4.2 in its entirety
SC 15.4.4.3 Delete 15.4.4.3 in its entirety