This document is a comprehensive technical specification manual for the Citrus County Animal Shelter Facility project in Lecanto, Florida, prepared by MLM-Martin Architects Inc. The project involves constructing a new 25,500 to 33,400 square foot animal shelter facility located at 3150 West Woodland Ridge Drive, encompassing a one-story building with kennels, administrative offices, a veterinary clinic, and supporting spaces. The facility will include metal framing, gypsum board assemblies, various wall and floor finishes, modular kennels and cages, electrical and mechanical systems, and associated site improvements such as utilities, drainage, grading, paving, sidewalks, landscaping, irrigation, and fencing.
The project will be procured through a competitive bid process (ITB 25-164) with pending permits from Southwest Florida Water Management District (SWFWMD) and Citrus County (Site and Building permit applications). The technical specifications detail precise requirements for materials, installation methods, performance standards, and quality control across multiple building systems and components. Potential bidders must carefully review the extensive documentation, which includes detailed drawings, material specifications, installation guidelines, and compliance requirements with Florida Building Code, ADA standards, and other relevant regulations. The project appears to be funded through local government sources, with a focus on creating a modern, functional animal shelter facility that meets contemporary operational and animal welfare standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
INCLUDING SPECIFICATIONS
CITRUS COUNTY ANIMAL SHELTER FACILITY
Citrus County, Florida
Citrus County Board of County Commissioners Citrus County Animal Services
3150 West Woodland Ridge Drive Lecanto, FL 34461
BID DOCUMENTS
Issue Date:
September 30, 2025
Documents prepared and submitted by:
MLM-Martin Architects Inc.
668 N. Orlando Avenue, Suite 107, Maitland, FL 32751
Phone: 407-897-6764 | Fax: 407-894-1338 License No. AAC002208
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 00 01 10
LECANTO, FLORIDA TABLE OF CONTENTS
00 01 10 - 1
MLM-Martin Architects, Inc. September 30, 2025
SECTION 00 01 10 – TABLE OF CONTENTS
PART 1 – GENERAL
DIVISION 0 – GENERAL PROVISIONS
00 01 00 TABLE OF CONTENTS
00 01 01 SEALS PAGE – ARCHITECTURAL
00 01 02 SEALS PAGE – STRUCTURAL
00 01 03 SEALS PAGE – MECHANICAL / PLUMBING / FIRE PROTECTION
00 01 04 SEALS PAGE – ELECTRICAL
00 01 05 SEALS PAGE – SYSTEMS / TELECOMMUNICATIONS
00 01 06 SEALS PAGE – LANDSCAPE ARCHITECTURE
DIVISION 1 – GENERAL REQUIREMENTS
01 10 00 SUMMARY OF WORK
01 12 00 PROJECT DIRECTORY
01 23 00 ALTERNATES
01 25 00 PROJECT SUBSTITUTIONS
01 26 00 CONTRACT MODIFICATION PROCEDURE
01 29 00 PAYMENT PROCEDURES
01 30 00 PROJECT FORMS
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 31 13 COORDINATION
01 32 00 CONSTRUCTION PROCESS DOCUMENTATION
01 32 13 SCHEDULING
01 32 33 PRE-CONSTRUCTION VIDEORECORDINGS
01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 42 13 ABBREVIATIONS
01 42 19 REFERENCE STANDARDS AND DEFINITIONS
01 45 00 QUALITY CONTROL SERVICES
01 45 16.14 HAZARDOUS MATERIALS
01 50 00 TEMPORARY FACILITIES
01 60 00 PROJECT REQUIREMENTS
01 60 02 MATERIALS AND EQUIPMENT
01 71 23 FIELD ENGINEERING
01 73 00 EXECUTION
01 73 29 CUTTING AND PATCHING
01 74 23 FINAL CLEANING AND PROTECTIONS
01 78 00 PROJECT CLOSEOUT
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 36 WARRANTIES
01 78 39 PROJECT RECORD DOCUMENTS
01 79 00 DEMONSTRATION AND TRAINING
01 80 00 CONSTRUCTION ADMINISTRATION FORMS
DIVISION 2 – EXISTING CONDITIONS
00 01 10 - 2
02 30 00 SOIL REPORT AND RECOMMENDATIONS
02 30 00.01 GEOTECHNICAL ENGINEERING REPORT
DIVISION 3 – CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 4 – MASONRY
04 20 00 UNIT MASONRY
04 22 00 CONCRETE UNIT MASONRY
04 22 16 GLAZED MASONRY
04 26 16 ADHERED MASONRY VENEER
DIVISION 5 – METALS
05 12 00 STRUCTURAL STEEL FRAMING
05 40 00 COLD-FORMED METAL FRAMING
05 50 00 METAL FABRICATIONS
DIVISION 6 – WOOD AND PLASTICS
06 10 00 ROUGH CARPENTRY
06 16 43 EXTERIOR GYPSUM SHEATHING
06 40 00 ARCHITECTURAL WOODWORK
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
07 13 27 SELF-ADHERING AIR AND WATER VAPOR MEMBRANE
07 16 16 CRYSTALLINE WATERPROOFING
07 19 23 SILOXANE WATER REPELLENT
07 21 00 THERMAL INSULATION
07 26 00 VAPOR BARRIERS
07 42 13 METAL WALL PANELS
07 42 13.13 FORMED METAL PANELS
07 62 00 SHEET METAL FLASHING AND TRIM
07 84 13 PENETRATION FIRESTOPPING
07 84 43 JOINT FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 8 – OPENINGS
08 13 13 STEEL DOORS AND FRAMES
08 31 13 ACCESS DOORS
08 33 23 OVERHEAD COILING DOORS
08 36 00 OVERHEAD SECTIONAL DOORS
08 41 13 ALUMINUM STOREFRONTS
08 71 00 DOOR HARDWARE
08 80 00 GLASS AND GLAZING
08 88 13 FIRE RATED GLASS
08 91 00 LOUVERS AND VENTS
DIVISION 9 – FINISHES
00 01 10 - 3
09 21 00 SPRAY APPLIED ACOUSTICAL CEMENT PLASTERS
09 21 16 GYPSUM BOARD ASSEMBLIES
09 21 18 GYPSUM BOARD SHAFT WALL ASSEMBLIES
09 22 16 INTERIOR METAL FRAMING
09 22 26 METAL SUSPENSION SYSTEMS
09 24 23 PORTLAND CEMENT PLASTER
09 30 00 TILING
09 51 23 ACOUSTICAL CEILINGS
09 65 19 RESILIENT TILE FLOORING
09 67 23 RESINOUS FLOORING SYSTEM
09 72 00 FIBERGLASS REINFORCED PANELS
09 81 00 ACOUSTICAL/FIRE INSULATION
09 90 00 PAINTING
09 96 53 ELASTOMERIC COATING
DIVISION 10 – SPECIALTIES
10 14 00 SIGNAGE INTERIOR
10 14 16 PLAQUE
10 22 26 OPERABLE PARTITIONS
10 28 13 TOILET AND BATH ACCESSORIES
10 44 00 FIRE-PROTECTION SPECIALTIES
10 51 13 METAL LOCKERS
10 73 26 PRE-ENGINEERED ALUMINUM CANOPIES
10 75 00 FLAG POLES
DIVISION 11 – EQUIPMENT
11 31 00 RESIDENTIAL & COMMERCIAL EQUIPMENT
11 60 00 LABORATORY EQUIPMENT
DIVISION 12 – FURNISHINGS
Not used.
DIVISION 13 – SPECIAL CONSTRUCTION
13 19 00 MODULAR KENNELS AND CAGES
13 34 19 METAL BUILDING SYSTEMS
13 49 00 RADIATION PROTECTION
DIVISION 21 – FIRE SUPPRESSION
21 10 00 FIRE PROTECTION
DIVISION 22 – PLUMBING
22 05 00 COMMON WORK RESULTS FOR PLUMBING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 00 PLUMBING INSULATION
22 11 16 DOMESTIC WATER PIPING
22 11 19 DOMESTIC WATER PIPING SPECIALTIES
22 11 23 DOMESTIC WATER PUMPS
22 13 16 SANITARY WASTE AND VENT PIPING
00 01 10 - 4
22 13 19 SANITARY WASTE PIPING SPECIALTIES
22 13 23 SANITARY WASTE INTERCEPTORS
22 34 00 FUEL FIRED DOMESTIC WATER HEATERS
22 40 00 PLUMBING FIXTURES
22 47 00 DRINKING FOUNTAINS AND WATER COOLERS
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
23 05 00 COMMON WORK RESULTS FOR HVAC
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 48 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING ADJUSTING AND BALANCING
23 07 00 HVAC INSULATION
23 09 23 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC
23 23 00 REFRIGERANT PIPING
23 31 13 METAL DUCTS
23 31 14 DUCT HEATERS
23 33 00 AIR DUCT ACCESSORIES
23 34 23 HVAC POWER VENTILATORS
23 37 13 DIFFUSERS, REGISTERS AND GRILLES
23 41 00 PARTICULATE AIR FILTRATION
23 43 00 ELECTRONIC AIR CLEANERS
23 63 13 AIR COOLED CONDENSING UNITS-RESIDENTIAL
23 63 14 AIR COOLED CONDENSING UNITS – 100% OUTSIDE AIR
23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS (MINI-SPLIT)
23 82 18 AIR HANDLING UNITS-RESIDENTIAL
23 82 19 AIR HANDLING UNITS– 100% OUTSIDE AIR
DIVISION 26 – ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 09 23 LIGHTING CONTROL DEVICES
26 24 16 PANELBOARDS
26 27 13 ELECTRICITY METERING
26 27 26 WIRING DEVICES
26 28 13 FUSES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 32 13 ENGINE GENERATORS
26 36 23 AUTOMATIC TRANSFER SWITCHES
26 41 13 LIGHTNING PROTECTION FOR STRUCTURES
26 43 13 TRANSIENT VOLTAGE SUPPRESSION FOR LOW VOLTAGE ELECTRICAL POWER
CIRCUITS
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS SYSTEMS
27 05 07 SUBMITTALS FOR COMMUNICATIONS SYSTEMS
00 01 10 - 5
27 05 10 SYMBOLS AND ABBREVIATIONS FOR COMMUNICATIONS SYSTEMS
27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 05 29 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS
27 05 33 CONDUIT AND BACKBOXES FOR COMMUNICATIONS SYSTEMS
27 05 53 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS
27 10 00 PREMISE DISTRIBUTION SYSTEM
27 51 50 OWNER INTERCOM SYSTEM WITH TIME PROGRAM CLOCK
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
28 05 07 SUBMITTALS FOR ELECTRONIC SAFETY AND SECURITY
28 05 10 SYMBOLS AND ABBREVIATIONS FOR ELECTRONIC SAFETY AND SECURITY
28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 05 29 HANGERS AND SUPPORTS FOR ELECTRONIC SAFETY AND SECURITY
28 05 33 CONDUIT AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY
28 05 53 IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY
28 13 00 ACCESS CONTROL SYSTEM
28 23 00 CLOSED CIRCUIT TELEVISION SYSTEM
28 31 00 ADDRESSABLE FIRE ALARM DETECTION SYSTEM (EST-3)
DIVISION 31 – EARTHWORK
31 31 16 TERMITE PROTECTION
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 31 00 SITE CHAINLINK FENCES AND GATES
32 84 00 PLANTING IRRIGATION
32 92 00 TURF AND GRASSES
32 93 00 PLANTS
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 00 01 10
00 01 10 - 6
THIS PAGE INTENTIONALLY LEFT BLANK
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 00 01 01
LECANTO, FLORIDA SEALS PAGE – ARCHITECTURAL
00 01 01 - 1
SECTION 00 01 01 – SEALS PAGE – ARCHITECTURAL
PART 1 - GENERAL
SEAL:
Miguel Lazaro Martin Print Name:
MLM-Martin Architects, Inc.
Company
AR0008255 / Exp. 2/28/27 Registration Number / Expiration
State of Florida
Certified specification sections include the following:
SECTION TITLE
00 01 10 TABLE OF CONTENTS
00 01 01 SEALS PAGE – ARCHITECTURAL
01 10 00 SUMMARY OF WORK
01 12 00 PROJECT DIRECTORY
01 23 00 ALTERNATES
01 25 00 PROJECT SUBSTITUTIONS
01 26 00 CONTRACT MODIFICATION PROCEDURE
01 29 00 PAYMENT PROCEDURE
01 30 00 PROJECT FORMS
01 31 00 PROJECT MANAGEMENT COORDINATION
01 31 13 COORDINATION
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 32 13 SCHEDULING
01 32 33 PRE-CONSTRUCTION VIDEO RECORDINGS
01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01 42 13 ABBREVIATIONS
01 42 19 REFERENCE STANDARDS AND DEFINITIONS
01 45 00 QUALITY CONTROL SERVICES
01 45 16.14 HAZARDOUS MATERIALS
01 50 00 TEMPORARY FACILITIES
01 60 00 PROJECT REQUIREMENTS
01 60 02 MATERIALS AND EQUIPMENT
01 71 23 FIELD ENGINEERING
01 73 00 EXECUTION
01 73 29 CUTTING AND PATCHING
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY THE
INDIVIDUAL NAMED ABOVE, USING A DATED DIGITAL SIGNATURE.
PER F. A. C. RULE 61G15-23.004. PRINTED COPIES OF THIS
DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED AND THE
SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
00 01 01 - 2
01 74 23 FINAL CLEANING AND PROTECTIONS
01 78 00 PROJECT CLOSEOUT
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 36 WARRANTIES
01 78 39 PROJECT RECORD DOCUMENTS
01 79 00 DEMONSTRATION AND TRAINING
01 80 00 CONSTRUCTION ADMINISTRATION FORMS
04 26 16 ADHERED MASONRY VENEER
06 10 00 ROUGH CARPENTRY
06 16 43 EXTERIOR GYPSUM SHEATHING
06 40 00 ARCHITECTURAL WOODWORK
07 13 27 SELF-ADHERING AIR AND WATER VAPOR MEMBRANE
07 16 16 CRYSTALLINE WATERPROOFING
07 19 23 SILOXANE WATER REPELLENT
07 21 00 THERMAL INSULATION
07 26 00 VAPOR BARRIERS
07 42 13 METAL WALL PANELS
07 42 13.13 FORMED METAL PANELS
07 62 00 SHEET METAL FLASHING AND TRIM
07 84 13 PENETRATION FIRESTOPPING
07 84 43 JOINT FIRESTOPPING
07 92 00 JOINT SEALANTS
08 13 13 STEEL DOORS AND FRAMES
08 31 13 ACCESS DOORS
08 33 23 OVERHEAD COILING DOORS
08 36 00 OVERHEAD SECTIONAL DOORS
08 41 13 ALUMINUM STOREFRONTS
08 71 00 DOOR HARDWARE
08 80 00 GLASS AND GLAZING
08 88 13 FIRE RATED GLASS
08 91 00 LOUVERS AND VENTS
09 21 00 SPRAY APPLIED ACOUSTICAL CEMENT PLASTERS
09 21 16 GYPSUM BOARD ASSEMBLIES
09 21 18 GYPSUM BOARD SHAFT WALL ASSEMBLIES
09 22 16 INTERIOR METAL FRAMING
09 22 26 METAL SUSPENSION AND SYSTEMS
09 24 23 PORTLAND CEMENT PLASTER
09 30 00 TILING
09 51 23 ACOUSTICAL CEILINGS
09 65 19 LVT-RESILIENT TILE FLOORING
09 67 23 RESINOUS FLOORING SYSTEM
09 72 00 FIBERGLASS REINFORCED PANELS
09 81 00 ACOUSTICAL/FIRE INSULATION
09 90 00 PAINTING
09 96 53 ELASTOMERIC COATING
10 14 00 SIGNAGE INTERIOR
10 14 16 PLAQUE
10 22 26 OPERABLE PARTITIONS
10 28 13 TOILET AND BATH ACCESSORIES
00 01 01 - 3
10 44 00 FIRE-PROTECTION SPECIALTIES
10 51 13 METAL LOCKERS
10 73 26 PRE-ENGINEERED ALUMINUM CANOPIES
10 75 00 FLAG POLES
11 31 00 RESIDENTIAL & COMMERCIAL EQUIPMENT
11 60 00 LABORATORY EQUIPMENT
13 19 00 MODULAR KENNELS AND CAGES
13 49 00 RADIATION PROTECTION
31 31 16 TERMITE PROTECTION
32 31 00 SITE CHAIN LINK FENCING AND GATES
END OF SECTION 01 10 00
00 01 01 - 4
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 00 01 02
LECANTO, FLORIDA SEALS PAGE – STRUCTURAL
00 01 02 - 1
SECTION 00 01 02 – SEALS PAGE – STRUCTURAL
PART 1 - GENERAL
SEAL:
Print Name
Company
03 30 00 CAST-IN PLACE CONCRETE
04 20 00 UNIT MASONRY
04 22 00 CONCRETE UNIT MASONRY
04 22 16 GLAZED MASONRY
05 12 00 STRUCTURAL STEEL FRAMING
05 40 00 COLD-FORMED METAL FRAMING
05 50 00 METAL FABRICATIONS
13 34 19 METAL BUILDING SYSTEMS
END OF SECTION 00 01 02
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY THE
INDIVIDUAL NAMED ABOVE, USING A DATED DIGITAL SIGNATURE.
PER F. A. C. RULE 61G15-23.004. PRINTED COPIES OF THIS
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 00 01 02
LECANTO, FLORIDA SEALS PAGE – STRUCTURAL
00 01 02 - 2
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 00 01 03
LECANTO, FLORIDA SEALS PAGE – MECHANICAL / PLUMBING /
FIRE PROTECTION
00 01 03 - 1
MLM-Martin Architects, Inc. June 6, 2025
SECTION 00 01 03 – SEALS PAGE – MECHANICAL / PLUMBING / FIRE PROTECTION
00 01 03 SEALS PAGE – MECHANICAL / PLUMBING / FIRE PROTECTION
21 10 00 FIRE PROTECTION
22 05 00 COMMON WORK RESULTS FOR PLUMBING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 07 00 PLUMBING INSULATION
22 11 16 DOMESTIC WATER PIPING
22 11 19 DOMESTIC WATER PIPING SPECIALTIES
22 11 23 DOMESTIC WATER PUMPS
22 13 16 SANITARY WASTE AND VENT PIPING
22 13 19 SANITARY WASTE PIPING SPECIALTIES
22 13 23 SANITARY WASTE INTERCEPTORS
22 34 00 FUEL FIRED DOMESTIC WATER HEATERS
22 40 00 PLUMBING FIXTURES
22 47 00 DRINKING FOUNTAINS AND WATER COOLERS
23 05 00 COMMON WORK RESULTS FOR HVAC
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 48 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING ADJUSTING AND BALANCING
23 07 00 HVAC INSULATION
23 09 23 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC
23 23 00 REFRIGERANT PIPING
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND SEALED BY THE
INDIVIDUAL NAMED ABOVE, USING A DATED DIGITAL SIGNATURE.
PER F. A. C. RULE 61G15-23.004. PRINTED COPIES OF THIS
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 00 01 03
LECANTO, FLORIDA SEALS PAGE – MECHANICAL / PLUMBING /
FIRE PROTECTION
00 01 03 - 2
23 31 13 METAL DUCTS
23 31 14 DUCT HEATERS
23 33 00 AIR DUCT ACCESSORIES
23 34 23 HVAC POWER VENTILATORS
23 37 13 DIFFUSERS, REGISTERS AND GRILLES
23 41 00 PARTICULATE AIR FILTRATION
23 43 00 ELECTRONIC AIR CLEANERS
23 63 13 AIR COOLED CONDENSING UNITS-RESIDENTIAL
23 63 14 AIR COOLED CONDENSING UNITS – 100% OUTSIDE AIR
23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS (MINI-SPLIT)
23 82 18 AIR HANDLING UNITS-RESIDENTIAL
23 82 19 AIR HANDLING UNITS– 100% OUTSIDE AIR
END OF SECTION 00 01 03
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 00 01 04
LECANTO, FLORIDA SEALS PAGE – ELECTRICAL
00 01 04 - 1
SECTION 00 01 04 – SEALS PAGE – ELECTRICAL
00 01 04 SEALS PAGE – ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 09 23 LIGHTING CONTROL DEVICES
26 24 16 PANELBOARDS
26 27 13 ELECTRICITY METERING
26 27 26 WIRING DEVICES
26 28 13 FUSES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 32 13 ENGINE GENERATORS
26 36 23 AUTOMATIC TRANSFER SWITCHES
26 41 13 LIGHTNING PROTECTION FOR STRUCTURES
26 43 13 TRANSIENT VOLTAGE SUPPRESSION FOR LOW VOLTAGE ELECTRICAL
POWER CIRCUITS
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
END OF SECTION 00 01 04
PER F. A. C. RULE 61G15-23.004. PRINTED COPIES OF THIS
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 00 01 04
LECANTO, FLORIDA SEALS PAGE – ELECTRICAL
00 01 04 - 2
CITRUS CONTY ANIMAL SHELTER FACILITY SECTION 00 01 05
LECANTO, FLORIDA SEALS PAGE – SYSTEMS / TELECOMMUNICATIONS
00 01 05 - 1
SECTION 00 01 05 – SEALS PAGE – SYSTEMS / TELECOMMUNICATIONS
00 01 05 SEALS PAGE – SYSTEMS / TELECOMMUNICATIONS
27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS SYSTEMS
27 05 07 SUBMITTALS FOR COMMUNICATIONS SYSTEMS
27 05 10 SYMBOLS AND ABBREVIATIONS FOR COMMUNICATIONS SYSTEMS
27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 05 29 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS
27 05 33 CONDUIT AND BACKBOXES FOR COMMUNICATIONS SYSTEMS
27 05 53 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS
27 10 00 PREMISE DISTRIBUTION SYSTEM
27 51 50 OWNER INTERCOM SYSTEM WITH TIME PROGRAM CLOCK
28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY
28 05 07 SUBMITTALS FOR ELECTRONIC SAFETY AND SECURITY
28 05 10 SYMBOLS AND ABBREVIATIONS FOR ELECTRONIC SAFETY AND SECURITY
28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 05 29 HANGERS AND SUPPORTS FOR ELECTRONIC SAFETY AND SECURITY
28 05 33 CONDUIT AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY
28 05 53 IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY
28 13 00 ACCESS CONTROL SYSTEM
28 23 00 CLOSED CIRCUIT TELEVISION SYSTEM
28 31 00 ADDRESSABLE FIRE ALARM DETECTION SYSTEM (EST-3)
END OF SECTION 00 01 05
PER F. A. C. RULE 61G15-23.004. PRINTED COPIES OF THIS
CITRUS CONTY ANIMAL SHELTER FACILITY SECTION 00 01 05
LECANTO, FLORIDA SEALS PAGE – SYSTEMS / TELECOMMUNICATIONS
00 01 05 - 2
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 00 01 06
LECANTO, FLORIDA SEALS PAGE – LANDSCAPE ARCHITECTURE
00 01 06 - 1
SECTION 00 01 06 – SEALS PAGE – LANDSCAPE ARCHITECTURE
32 84 00 PLANTING IRRIGATION
32 92 00 TURF AND GRASSES
32 93 00 PLANTS
END OF SECTION 00 01 06
PER F. A. C. RULE 61G15-23.004. PRINTED COPIES OF THIS
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 00 01 06
LECANTO, FLORIDA SEALS PAGE – LANDSCAPE ARCHITECTURE
00 01 06 - 2
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 01 10 00
LECANTO, FLORIDA SUMMARY OF WORK
01 10 00 - 1
SECTION 01 10 00 – SUMMARY OF WORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including Contractual Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 PROJECT DESCRIPTION
A. Project/Work Identification:
1. The general overall description of the work of the contract for the
CITRUS COUNTY ANIMAL SHELTER FACILITY
3150 WEST WOODLAND RIDGE DRIVE
LECANTO, FL 34461
can be summarized for purposes of administration and payment in the manner of project segments as follows:
1.3 CONTRACTOR USE OF PREMISES
A. Limit use of the premises to construction activities within areas indicated.
1. Site work, fill, utilities drainage, grading, paving sidewalks, landscaping, irrigation and fence.
2. One-story building.
3. Provide all temporary directional signage, safety, and barricading required for services and use of facility.
a. Submit a plan indicating signage, safety, and barricading, at the pre-construction meeting.
b. Directional signing at the access gate and or along the delivery route to the stor-age area or work site shall be as directed by the Architect.
4. Confine operations to areas within Contract limits indicated. Portions of the site beyond areas in which construction operations are indicated are not to be disturbed.
5. Access to site shall be shown on the plans or as directed by the Architect. Do not permit any unauthorized construction personnel or traffic on the site. Provide for traffic control to and from the various construction areas. Immediately clean-up any debris deposited along the access road as a result of construction traffic.
a. Keep driveways and entrances serving the premises clear and available to the Owner and/or law enforcement officers at all times and fire department. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 01 10 00
LECANTO, FLORIDA SUMMARY OF WORK
01 10 00 - 2
6. All material orders for delivery to the site will use as a delivery address the access point at the Contractor’s storage site.
7. The limits of construction material storage areas, equipment storage areas, and parking areas shall be as indicated in the documents or as directed by the Owner and/or Architect. Erect and maintain suitable secured fencing, marking and warning devices suitable for both day/night use to delineate the perimeter of all such areas. If perimeter fencing location is not shown on drawings, coordinate with Owner and/or Architect for location of perimeter fencing of work.
1.4 LAWS, PERMITS, AND REGULATIONS
A. Comply with all applicable laws, ordinances, regulations, codes, ADA requirements.
B. Obtain and pay for all applicable licenses, permits, and fees/charges for connection to outside services.
PART 2 - PRODUCTS (Not Applicable)
END OF SECTION 01 10 00
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 01 12 00
LECANTO, FLORIDA PROJECT DIRECTORY
01 12 00 - 1
SECTION 01 12 00 – PROJECT DIRECTORY
PART 1 – GENERAL
OWNER Citrus County Board of County Commissioners 110 N. Apopka Ave.
Inverness, FL 34450
PROJECT SITE ADDRESS Citrus County Animal Shelter Facility 3150 West Woodland Ridge Drive Lecanto, FL 34461
CONSULTANT TEAM
Architect: MLM-Martin Architects, Inc.
668 N. Orlando Avenue, Suite 107 Maitland, FL 32751 Phone: 407-897-6764 Fax: 407-894-1338 Email: mmartin@mlm-martin.com
Structural Engineer: Bowen Engineering Corp.
1528 Vassar Street Orlando, FL 32804 Phone: 407-423-7585 Fax: 407-423-4872 Email: fbowen@bowen-corp.com
Mechanical, Electrical, Bobes Associates Consulting Engineers, Inc.
Plumbing, Fire Protection Engineer: 150 Circle Drive Maitland, FL 32751 Phone: 407-628-0882 Fax: 407-628-7024 Email: gusjr@bobeseng.com
Systems / Telecommunications Matern Professional Engineering, Inc.
Engineer: 130 Candace Drive
Maitland, Florida 32751 Phone: 407-740-5020 Fax: 407-740-0365 Email: damatern@matern.net
Civil Engineer: Tocoi Engineering, LLC 714 North Orange Avenue Green Cove Springs, FL 32043 Phone: 904-215-1388 Email: csohm@tocoi.com
Landscape Architect: Magley Design 1817 East Washington Street Orlando, FL, 32803 Phone: 407-898-0223 Email: rmagley@magleydesign.com
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 01 12 00
LECANTO, FLORIDA PROJECT DIRECTORY
01 12 00 - 2
Geotechnical Engineering: Terracon Consultants 5463 W Waters Ave.
Tampa, FL 33634-1253 Phone: 813-221-0050 Fax: 813-221-0051 Email: douglas.dunkelberger@terracon.com
Acoustical Consultant: Siebein Associates, Inc.
625 NW 60th St., Ste. C Gainesville, FL 32607 Phone: 352-331-5111 Fax: 352-331-0009 Email: gsiebein@siebeinacoustic.com
Cost Estimator: Blue Cord Professional Services 835 Bennett Road, Ste. 100 Orlando, FL 32803 Phone: 407-425-1390 Email: jhoibraten@blue-cord.com
PART 2 - PRODUCTS (Not Applicable)
END OF SECTION 01 12 00
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 01 23 00
LECANTO, FLORIDA ALTERNTATES
01 23 00 - 1
SECTION 01 23 00 - ALTERNATES
1.1 RELATED DOCUMENTS
A. Drawings and General Conditions/Provisions of the Contract, including Contractual
Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements governing Alternates.
1.3 DEFINITIONS
A. Definition: An alternate is an amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if the Owner decides to accept a corresponding change in either the amount of construction to be completed, or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. The cost or credit for each alternate is the net addition to or deduction from the
Contract Price to incorporate the Alternate into the Work. No other adjustments are made to the Contract Price.
1.4 PROCEDURES
A. Coordination: Modify or adjust affected adjacent work as necessary to completely and fully integrate that work into the Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not mentioned as part of the Alternate.
B. Notification: The Owner will notify each party involved, in writing, if alternates have been accepted, rejected, or deferred for later consideration.
C. Schedule: A schedule of alternates is included in the Bid Form. Specification Sections referenced in the Schedule contain requirements for materials necessary to achieve the Work described under each alternate.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES:
Alternate #1: Construction of:
To the extent shown on drawings and specificaitons for Add Alternate No. 1, add area #4. Includes Sallyport 400, Paper Storage 401, Mechanical Room 402, and Dry Storage 403.
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 01 23 00
LECANTO, FLORIDA ALTERNTATES
01 23 00 - 2
Alternate#2: Construction of :
To the extent shown on drawings and specifications for Add Alternate No. 2, add area #1. Includes Multipurpose Room 100, Education Room 102, Janitors Room 106, And Mechanical Room 105.
Alternate #3: Construction of :
To the extent shown on drawings and specificaitons for Add Alternate No. 3, add pre-engineered aluminum covered walkway canopies and pre-engineered foundation for canopies by canopy manufacturer. Canopies adjacent to Yard 1, Yard 2, Yard 3, Yard 4, Yard 7, Yard 8 and as indicated on drawings.
Alternate #4: Construction of :
To the extent shown on drawings and specificaitons for Add Alternate No. 4: Add resinous floor finish to the all room floors except for the following rooms listed below. Delete concrete sealer.
- Add resineous flooring at Area #1 in its entirety except for: Electrical room 102, and Mechanical Room 105.
- Add resineous flooring at Area #2 in its entirety except for: Janitor 202, Office room 228, Volunteer Office 213, Director’s Office 214, Electrical room 220, Mechanical room 222, and Storage room 217.
- Add resineous flooring at Area #3 in its entirety.
- Add resineous flooring at Area #6 in its entirety except for: IDF room 610, Entry 616, Entry 617.
- Add resineous flooring at Area #7 in its entirety except for: Fire Protection Room 700, Electrical Room 703, Entry 717, Entry 716, and IDF Room 719.
- Add resineous flooring at Area #8 in its entirety except for: Mechanical Room 806, Electrical Room 811.
END OF SECTION 01 23 00
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 01 25 00
LECANTO, FLORIDA PROJECT SUBSTITUTIONS
01 25 00 - 1
SECTION 01 25 00 - PRODUCT SUBSTITUTIONS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including Contractual Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements for handling requests for substitutions.
B. Procedural requirements governing the Contractor's selection of products and product options are included under Section "Materials and Equipment."
1.3 DEFINITIONS
A. Definitions used in this Section are not intended to change or modify the meaning of other terms used in the Contract Documents.
B. Substitutions: Requests for changes in products, materials, equipment, and methods of construction required by Contract Documents proposed by the Contractor before and after award of the Contract are considered requests for "substitutions.”
1. The following are not considered substitutions:
a. Revisions to Contract Documents requested by the Architect.
b. Specified options of products and construction methods included in Contract Documents.
c. The Contractor's determination of and compliance with governing regulations and orders issued by governing authorities.
2. Substitutions requested by Bidders during the bidding period and accepted prior to award of Contract are subject to requirements specified in this Section for substitutions, and will be incorporated into the Contract Documents by addendum.
1.4 SUBMITTALS
A. Submit the following in accordance with Section 01 33 23, "Shop Drawings, Product Data and Samples".
B. SD-01; Substitution Request Submittal: Requests for substitution will be considered if received within fourteen (14) calendar days before Bid date. Requests received after this time may be considered or rejected at the discretion of the Architect. Requests for substitutes after award of Contract will be considered if received within twenty (20) days after issuance of the Notice to Proceed. Requests received more than twenty (20) days after the Notice to Proceed may be considered or rejected at the sole discretion of the Architect.
1. Submit four (4) copies of each request for substitution for consideration. Submit requests
01 25 00 - 2 in the form and in accordance with procedures required for Change Order proposals.
2. Identify the product, or the fabrication or installation method to be replaced in each request.
Include related Specification Section and Drawing numbers. Provide complete documentation showing compliance with the requirements for substitutions, and the following information, as appropriate:
a. Product Data, including Drawings and descriptions of products, fabrication and installation procedures.
b. Samples, where applicable or requested.
c. A detailed comparison of significant qualities of the proposed substitution with those of the Work specified. Significant qualities may include elements such as size, weight, durability, code compliance, maintenance requirements, energy usage, and environmental considerations, performance, key components, and visual effect.
d. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by the Owner and separate Contractors that will become necessary to accommodate the proposed substitution.
e. A statement indicating the substitution's effect on the Contractor's Construction Schedule compared to the schedule without approval of the substitution. Indicate the effect of the proposed substitution on overall Contract Time.
f. Cost information, including a proposal of the net change, if any in the Contract Sum.
g. Certification by the Contractor that the substitution proposed is equal-to or better in every significant respect to that required by the Contract Documents, and that it will perform adequately in the application indicated. Include the Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of the failure of the substitution to perform adequately.
h. A paragraph-by-paragraph comparison and analysis of the related specification section indicating compliance or variation from specification standard. Each variation shall be substantiated with necessary submission to validate products compliance with specifications.
i. Failure to include the above requirements in the submittal will be cause for rejection of the submittal in its entirety.
3. State the amount of credit, for cost and time, if any, the Owner will receive as the result of the substitution, if applicable.
4. Designer(s)’/ Designer(s) Action: Additional information or documentation necessary for evaluation of the request may be requested. Notification of approved substitutions will be made by Addendum prior to bid and by a Change Notice after bid.
PART 2 - PRODUCTS
2.1 SUBSTITUTIONS
01 25 00 - 3
A. Conditions: The substitution request will be received and considered by the Architect when one or more of the following conditions are satisfied, as determined by the Architect; otherwise requests will be returned without action except to record noncompliance with these requirements.
1. Extensive revisions to Contract Documents are not required.
2. Proposed changes are in keeping with the general intent of Contract Documents.
3. The request is timely, fully documented, and properly submitted.
4. The request is directly related to an "or approved equal" clause or similar language in the Contract Documents.
5. The specified product or method of construction cannot be provided within the Contract Time. The request will not be considered if the product or method cannot be provided as a result of failure to pursue the Work promptly or coordinate activities properly.
6. The specified product or method of construction cannot receive necessary approval by a governing authority, and the requested substitution can be approved.
7. A substantial advantage is offered the Owner, in terms of cost, time, energy conservation or other considerations of merit, after deducting offsetting responsibilities the Owner may be required to bear. Additional responsibilities for the Owner may include additional compensation to the Architect for redesign and evaluation services, increased cost of other construction by the Owner or separate Contractors, and similar considerations.
8. The specified product or method of construction cannot be provided in a manner that is compatible with other materials, and where certification is provided that the substitution will overcome the incompatibility.
9. The specified product or method of construction cannot be coordinated with other materials, and where certification is provided that the proposed substitution can be coordinated.
10. The specified product or method of construction cannot provide a warranty required by the Contract Documents and where certification is provided that the proposed substitution provide the required warranty.
11. Where a proposed substitution involves more than one prime Contractor, each Contractor shall cooperate with the other Contractors involved to coordinate the Work, provide uniformity and consistency, and to assure compatibility of products.
B. The submittal and Architect's acceptance of Shop Drawings, Product Data, or Samples that relate to construction activities not complying with the Contract Documents does not constitute an acceptable or valid request for substitution, nor does it constitute approval.
C. If the use of a substitute product requires additional work or modifications to new or existing facilities, all such additional work, including utility modifications shall be borne by the Contractor.
2.2 PROCEDURES
A. Product Selection Procedures: Options in product selection is governed by the Contract Documents and governing regulations, not by previous industry tradition or project experience. Procedures governing product selection include, but are not limited to the following:
01 25 00 - 4
1. Proprietary Specification Requirements:
a. Where a single product or manufacturer is named, provide the product indicated.
Other products may be considered by the Designer(s) in compliance with the provisions concerning substitutions.
b. Advise the Architect before proceeding when it is discovered that the named product is not a feasible solution.
2. Semi-proprietary Specification Requirements: Where two or more products and manufacturers are names, provide one of the products indicated. No substitutions will be permitted unless the specification indicates consideration of other products.
a. When products are specified by one or more manufacturer's model numbers or performance criteria with reference to other acceptable manufacturers, products manufactured by acceptable manufacturers listed must meet minimum performance criteria specified or meet quality of models specified.
b. Advise the Architect before proceeding when it is discovered that the named product is not a feasible solution.
3. Performance Specification Requirements: Where Specifications require compliance with performance requirements, provide products that comply with the requirements and are recommended by the manufacturer for the application indicated. General overall performance of a product is implied where the product is specified for a specific application.
4. Compliance with Standards, Codes, and Regulations: Where the Specifications only require compliance with an imposed code, standard, or regulation, select a product that complies with the standards, codes, or regulations specified.
PART 3 - EXECUTION
3.1 INSTALLATION OF PRODUCTS
A. Except as otherwise indicated in individual sections of these Specifications, comply with manufacturer's instructions and recommendations for installation of products in the applications indicated.
B. Clean exposed surfaces and protect as necessary to ensure work is protected from damage and deterioration at time of Substantial Completion of the whole Work.
END OF SECTION 01 25 00
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 01 26 00
LECANTO, FLORIDA CONTRACT MODIFICATION PROCEDURES
01 26 00 - 1
SECTION 01 26 00 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section specifies administrative and procedural requirements for handling and processing Contract modifications.
1.2 ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS (ASIS’S)
A. When changes are necessary not involving potential changes to Contract Sum or Contract Time, Architect will issue supplemental instructions on AIA Document G710, "Architect's Supplemental Instructions" or on an alternative form as may be determined appropriate by the Architect.
1.3 CONSTRUCTION CHANGE DIRECTIVES (CCD’S)
A. When changes are necessary involving potential changes to Contract Sum or Contract Time and the Owner wishes the GC to proceed immediately with the work, Architect will issue a detailed description of proposed changes in the Work. If necessary, the description will include supple-mental or revised Drawings and Specifications. Architect will use AIA Document G714 for CCD’s or an alternative form as may be determined appropriate by the Architect.
1. Within one week of submitting the CCD, GC is to submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.
a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
c. Include costs of labor and supervision directly attributable to the change.
d. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
2. For work requested to be done on a Time and Material basis, submit costs within one week of completing the work.
a. Maintain detailed records on a time and material basis of work required by the Change. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.
1.4 PROPOSAL REQUESTS (PR’S)
A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.
Architect will use AIA Document G709 for Proposal Requests or an alternative form as may be determined appropriate by the Architect.
01 26 00 - 2
1. Proposal Requests issued by Architect are for information only. Are not to be considered instructions either to stop work in progress or to execute the proposed change.
2. Within time specified in Proposal Request after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.
a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
c. Include costs of labor and supervision directly attributable to the change.
d. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
1.5 CHANGE ORDER REQUESTS (COR’S)
A. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to the Contract, Contractor may propose changes by submitting a request for a change to Architect.
B. This documentation method is also acceptable to formally submit costs associated with CCD’s and PR’s.
1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.
2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
4. Include costs of labor and supervision directly attributable to the change.
5. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
6. Comply with requirements in Division 1 Section "Product Requirements" if the proposed change requires substitution of one product or system for product or system specified.
1.6 ALLOWANCES
A. Allowance Adjustment: To adjust allowance amounts, base each Change Order proposal on the difference between purchase amount and the allowance, multiplied by final measurement of work-in-place. If applicable, include reasonable allowances for cutting losses, tolerances, mixing
01 26 00 - 3 wastes, normal product imperfections, and similar margins.
1. Include installation costs in purchase amount only where indicated as part of the allowance.
2. If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other margins claimed.
3. Submit substantiation of a change in scope of work, if any, claimed in Change Orders related to unit-cost allowances.
4. Owner reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.
B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents, whether for the Purchase Order amount or Contractor's handling, labor, installation, overhead, and profit. Submit claims within 7 days of receipt of the Change Order or Construction Change Directive authorizing work to proceed. Owner will reject claims submitted later than 7 days after such authorization.
1. Do not include Contractor's or subcontractor's indirect expense in the Change Order cost amount unless it is clearly shown that the nature or extent of work has changed from what could have been foreseen from information in the Contract Documents.
2. No change to Contractor's indirect expense is permitted for selection of higher- or lowerpriced materials or systems of the same scope and nature as originally indicated.
1.7 CHANGE ORDER PROCEDURES
A. On Owner's approval of a Proposal Request, COR, or other cost proposal, GC will issue a Change Order for signatures of Owner and Contractor on AIA Document G701 “Change Order”.
B. Issuance of a single Change Order to include multiple individual changes (CCD’s, PR’s, COR’s, etc.) is acceptable and preferable.
1.8 CHANGE ORDER MARKUP
A. Acceptable markup on change orders for the General Contractor is 10%.”
PART 2 – PRODUCTS (Not Used)
PART 3 – EXECUTION (Not Used)
END OF SECTION 01 26 00
01 26 00 - 4
CITRUS COUNTY ANIMAL SHELTER FACILITY SECTION 01 29 00
LECANTO, FLORIDA PAYMENT PROCEDURES
01 29 00 - 1
SECTION 01 29 00 – PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Unless other documents issued by the Owner contradict this document, this Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment. In the event of a contradiction, the Owner’s directions would supersede this docu-ment.
B. Related Sections include the following:
1. Division 01 Section "Contract Modification Procedures" for administrative procedures for handling changes to the Contract.
2. Division 01 Section "Construction Progress Documentation" for administrative requirements governing preparation and submittal of Contractor's Construction Schedule and Submittals Schedule.
1.2 DEFINITIONS
A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applica-tions for Payment.
1.3 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule.
1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including the following:
a. Application for Payment forms with Continuation Sheets.
b. Submittal Schedule.
c. Contractor's Construction Schedule.
2. Submit the Schedule of Values to Architect at earliest possible date but no later than 30 days before the date scheduled for submittal of initial Applications for Payment.
3. Subschedules: Where the Work is separated into phases requiring separately phased payments, provide subschedules showing values correlated with each phase of payment.
B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section.
1. Identification: Include the following Project identification on the Schedule of Values.
a. Project name and location.
01 29 00 - 2
b. Name of Architect.
c. Architect's project number.
d. Contractor's name and address.
e. Date of submittal.
2. Submit draft of AIA Document G702, “Application and Certificate for Payment” and AIA Document G703, “Continuation Sheets”.
3. Arrange the Schedule of Values in tabular form with separate columns to indicate the following for each item listed:
a. Related Specification Section or Division.
b. Description of the Work.
c. Name of subcontractor.
d. Name of manufacturer or fabricator.
e. Name of supplier.
f. Change Orders (numbers) that affect value.
g. Dollar value.
1) Percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent.
4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate.
a. Provide separate labor and material costs for each line item.
5. Round amounts to nearest cent; total shall equal the Contract Sum.
6. Provide a separate line item in the Schedule of Values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.
a. Differentiate between items stored on-site and items stored off-site. If items stored off-site, include evidence of insurance or bonded warehousing, and photographs of stored items.
7. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.
8. Each item in the Schedule of Values and Applications for Payment shall be complete.
Include total cost and proportionate share of general overhead and profit for each item.
01 29 00 - 3
a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option.
9. Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.
10. Provide photographs of construction progress in digital format weekly.
1.4 APPLICATIONS FOR PAYMENT
A. Each Application for Payment shall be consistent with previous applications and payments as certified by Architect and paid for by Owner.
1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements.
B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Owner and Contractor. The period of construction Work covered by each Application for Payment is the period indicated in the Agreement.
C. Payment Application Forms: Use AIA Document G702, “Application and Certificate for Payment” and AIA Document G703 “Continuation Sheets” as form for Applications for Payment.
D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Architect will return incomplete applications without action.
1. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use updated schedules if revisions were made.
2. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.
E. Transmittal: Submit a minimum of 3 signed and notarized original copies of each Application for Payment to Architect. One copy shall include waivers of lien and similar attachments.
1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.
F. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's lien from every entity who is lawfully entitled to file a mechanic's lien arising out of the Contract and related to the Work covered by the payment.
1. Submit partial waivers on each item for amount requested in previous application, after deduction for retainage, on each item.
2. When an application shows completion of an item, submit final or full waivers.
3. Owner reserves the right to designate which entities involved in the Work must submit waivers.
4. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to Owner.
01 29 00 - 4
G. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:
1. List of subcontractors.
2. Schedule of Values.
3. Contractor's Construction Schedule (preliminary if not final).
4. Products list.
5. Schedule of unit prices.
6. Submittals Schedule (preliminary if not final).
7. List of Contractor's staff assignments.
8. List of Contractor's principal consultants.
9. Copies of building permits.
10. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.
11. Initial progress report.
12. Report of preconstruction…