A10_AttachD.5_SOI-Fillable.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Region 5 CERCLA Environmental Response IDIQ
- Solicitation number
- 12970223R0014
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains templates for submitting pricing schedules for a federal indefinite delivery, indefinite quantity contract for environmental response services in Region 5 under Solicitation Number 12970223R0014 issued by the Department of Agriculture Forest Service. Offerors must fill in unit pricing for various personnel, equipment, laboratory, and field testing items across three sample project scenarios. Pricing schedules require unit prices as well as extended total prices and must include the vendor's UEI, SAM registration, point of contact information, and authorized signature to be considered for award.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annual Rates
| Region 5 CERCLA Environmental Response IDIQ |
| CONTINUATION OF SECTION A - Contract Annual Rates |
| PERSONNEL | EQUIPMENT | OTHER COSTS | ||||||||||||||||||
| PROFESSIONAL POSITIONS | UNIT | BASE RATE | OY 1 | OY 2 | OY 3 | OY 4 | VEHICLES | UNIT | Owned (O)/ | |||||||||||
| Rented (R) | BASE RATE | OY 1 | OY 2 | OY 3 | OY 4 | ITEM | UNIT | BASE RATE | OY 1 | OY 2 | OY 3 | OY 4 | ||||||||
| Program Manager | Hour | Sedan | Mile | |||||||||||||||||
| Project Manager | Hour | Day | ||||||||||||||||||
| Senior Engineer/PE | Hour | Light Truck & Suburban | Mile | |||||||||||||||||
| Geotechnical Engineer/PE | Hour | Day | ||||||||||||||||||
| Geologist | Hour | Mid-Size Truck less than 26,000lbs GVW | Mile | |||||||||||||||||
| Engineer | Hour | Day | ||||||||||||||||||
| Senior Scientist | Hour | Large Truck Greater Than 26,000lbs GVW | Mile | |||||||||||||||||
| Scientist I/Staff Scientist | Hour | Day | ||||||||||||||||||
| Hydrologist | Hour | Heavy Equipment (backhoe, dozer, excavator, loader) | Day | |||||||||||||||||
| Chemist | Hour | Drilling Rig (wells) | Day | |||||||||||||||||
| Biologist | Hour | Drilling Rig (soil) | Day | LABORATORY & ANALYTICAL | ||||||||||||||||
| Soil Scientist | Hour | Decontamination Station Field (includes trash bins, washtubs, washbasins, chairs, water jugs, long-handles brushes) | Day | Provide a separate list of Laboratory Rates | ||||||||||||||||
| Toxicologist | Hour | Other | DESCRIPTION | UNIT | BASE RATE | OY 1 | OY 2 | OY 3 | OY 4 | |||||||||||
| Risk Assessor | Hour | FIELD TESTING EQUIPMENT | UNIT | Owned (O)/ | ||||||||||||||||
| Rented (R) | BASE RATE | OY 1 | OY 2 | OY 3 | OY 4 | |||||||||||||||
| Health & Safety Specialist | Hour | Photo-Ionization Detector | Day | |||||||||||||||||
| Industrial Hygienist | Hour | Flame Ionization Detector | Day | |||||||||||||||||
| Other | Hour | Field XRF | Day | |||||||||||||||||
| FIELD OPERATIONS/TECHNICAL POSITIONS | UNIT | BASE RATE | OY 1 | OY 2 | OY 3 | OY 4 | Radiation Detector | Day | ||||||||||||
| Field Chemist | Hour | Combustible Gas Indicator | Day | |||||||||||||||||
| Field Technician | Hour | PCB Test Kit | Day | |||||||||||||||||
| Environmental Technician | Hour | pH Meter | Day | |||||||||||||||||
| Equipment Operator | Hour | Other | ||||||||||||||||||
| Onsite Inspector | Hour | PERSONAL PROTECTION EQUIPMENT | UNIT | Owned (O)/ | ||||||||||||||||
| Rented (R) | BASE RATE | OY 1 | OY 2 | OY 3 | OY 4 | Need to state if equipment is owned or rented | ||||||||||||||
| Surveyor | Hour | Level A | Person/Hour | |||||||||||||||||
| Truck Driver | Hour | Level B | Person/Hour | |||||||||||||||||
| Other | Hour | Level C | Person/Hour | |||||||||||||||||
| ADMINISTRATIVE/OFFICE SUPPORT POSITIONS | UNIT | BASE RATE | OY 1 | OY 2 | OY 3 | OY 4 | Level D | Person/Hour | ||||||||||||
| Draftsperson/AutoCAD | Hour | |||||||||||||||||||
| Paralegal | Hour | |||||||||||||||||||
| Administrative Assistant (clerical) | Hour | |||||||||||||||||||
| Other | Hour |
SOI - Scenario 1
| Region 5 CERCLA Environmental Response IDIQ |
| CONTINUATION OF SECTION A |
| SCENARIO 1 - SCHEDULE OF ITEMS |
| PROJECT TITLE | ||||||
| UNIT | ||||||
| SOL # | ||||||
| ITEM NO. | DESCRIPTION | Method of Measure | Unit of Measure | QTY | UNIT PRICE | TOTAL PRICE |
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| TOTAL | $0.00 | |||||
| NOTES | 1. Offeror must fill in the UNIT price ONLY. Spreadsheet is formated to auto populate the total price. | |||||
| 2. Responses for quantities less than those listed in the numbered items may be rejected | ||||||
| 3. Responses without prices for each item and sub-item may be rejected. | ||||||
| PRICE SUBMITTED BY | ||||||
| Vendor Name | ||||||
| UEI SAM | ||||||
| POC | ||||||
| POC Email |
SOI - Scenario 2
| Region 5 CERCLA Environmental Response IDIQ |
| CONTINUATION OF SECTION A |
| SCENARIO 2 - SCHEDULE OF ITEMS |
| PROJECT TITLE | ||||||
| UNIT | ||||||
| SOL # | ||||||
| ITEM NO. | DESCRIPTION | Method of Measure | Unit of Measure | QTY | UNIT PRICE | TOTAL PRICE |
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| TOTAL | $0.00 | |||||
| NOTES | 1. Offeror must fill in the UNIT price ONLY. Spreadsheet is formated to auto populate the total price. | |||||
| 2. Responses for quantities less than those listed in the numbered items may be rejected | ||||||
| 3. Responses without prices for each item and sub-item may be rejected. | ||||||
| PRICE SUBMITTED BY | ||||||
| Vendor Name | ||||||
| UEI SAM | ||||||
| POC | ||||||
| POC Email |
SOI - Scenario 3
| Region 5 CERCLA Environmental Response IDIQ |
| CONTINUATION OF SECTION A |
| SCENARIO 3- SCHEDULE OF ITEMS |
| PROJECT TITLE | ||||||
| UNIT | ||||||
| SOL # | ||||||
| ITEM NO. | DESCRIPTION | Method of Measure | Unit of Measure | QTY | UNIT PRICE | TOTAL PRICE |
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| 1 | $0.00 | |||||
| TOTAL | $0.00 | |||||
| NOTES | 1. Offeror must fill in the UNIT price ONLY. Spreadsheet is formated to auto populate the total price. | |||||
| 2. Responses for quantities less than those listed in the numbered items may be rejected | ||||||
| 3. Responses without prices for each item and sub-item may be rejected. | ||||||
| PRICE SUBMITTED BY | ||||||
| Vendor Name | ||||||
| UEI SAM | ||||||
| POC | ||||||
| POC Email |
File details come from the government source that posted it. Updated .