A1_-_SOW_Red_Rock_Rooftop_AC_-_AI.docx
DOCX document 21 KB Posted
- Attached to
- RED ROCK SCHOOL AC UNIT RELOC & RE-INSTALL
- Solicitation number
- 140A2326Q0228
About this file
This is a Statement of Work (SOW) for the relocation and reinstallation of an AC unit at Red Rock Day School in Red Valley, Arizona. The Department of the Interior Bureau of Indian Affairs Bureau of Indian Education is seeking qualified contractors to remove an existing air conditioning unit from its current location and reinstall it at a new location at the school facility located at HWY 491 Indian Route 13, Red Valley, AZ 86544. The contractor must provide all labor, materials, equipment, supervision, transportation, and incidentals necessary to complete both the removal and installation services.
This procurement is set aside for Indian Economic Enterprises (IEE) under NAICS Code 238220 with an estimated project value of less than $25,000. The solicitation number is 140A2326Q0228, and quotes should include all-inclusive costs comprising removal services, installation services, applicable Navajo Nation taxes, state taxes, and FOB shipping costs. Bids exceeding $35,000 will require a surety bond. Award will be made to the lowest-priced conforming offeror. The procurement is being conducted under FAR Part 12 for commercial items, with solicitation terms effective through FAC 2026-01 and DOI-AAAP 0210 v01.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A5_IA_Form_3000_Material_Approval_Submittal.pdf | ||
| A6_-__RFP_Questions_and_Answers_Log.xlsx | XLSX spreadsheet | |
| Sol_140A2326Q0228.pdf | ||
| A2_-__WAGE_RATES.pdf | ||
| A3_-__-_DIAR_1452_280-2_Supplement.docx | DOCX document | |
| A4_-_IA_-_IEE_Representation_Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Red Rock Day School Statement of Work Project Title: Relocation and Installation of Rooftop Air Conditioning Unit for IT Room Cooling Project Overview: The project entails moving an existing ground-mounted air conditioning unit to the building rooftop and installing it to provide dedicated cooling for the IT room. The goal is to achieve reliable, efficient, and continuous climate control tailored to IT equipment requirements.
I. Scope of Work:
The contractor shall supply all necessary labor, materials, tools, equipment, and supervision to complete the following tasks:
1.0 Pre-Installation Assessment
1.1 Assess the current air conditioning unit to determine suitability for relocation
1.2 Review rooftop structural integrity to confirm its capacity for supporting the unit
1.3 Evaluate electrical and mechanical systems for compatibility
1.4 Identify relevant code and permitting obligations
2.0 Decommissioning of Existing Unit Make: Fujitsu, Split Type Air Conditioner Model #: AOUG12LZAH1
2.1 Disconnect electrical, refrigerant, and control connections in accordance with safety standards
2.2 Recover refrigerant per environmental regulations
2.3 Prepare equipment for safe lifting and transport
3.0 Rigging and Relocation
3.1 Arrange crane and rigging services for transfer from ground level to rooftop
3.2 Coordinate lift plan, safety protocols, and access restrictions
3.3 Safeguard building structure and adjacent property during lifting operations
4.0 Rooftop Installation
4.1 Install appropriate mounting system (curb, rails, or vibration isolation pads)
4.2 Secure unit per manufacturer specifications and local code compliance
4.3 Ensure proper clearance for airflow and maintenance accessibility
5.0 Mechanical Connections
5.1 Reconnect or install refrigerant piping with insulation
5.2 Conduct pressure testing and evacuating the system
5.3 Charge system with required refrigerant
6.0 Electrical and Controls Work
6.1 Extend or reroute electrical power to rooftop location
6.2 Install disconnects, conduit, and wiring as necessary
6.3 Integrate controls with IT room thermostat or building management system
7.0 Ductwork / Air Distribution
7.1 Modify or install ductwork to deliver cooling to IT room
7.2 Seal and insulate ducts to optimize energy efficiency
8.0 Testing and Commissioning
8.1 Perform system startup and operational tests
8.2 Verify cooling performance meets IT room specifications
8.3 Check for leaks, ensure proper airflow and electrical safety
8.4 Balance system if required
9.0 Documentation and Training
9.1 Provide comprehensive as-built documentation and updated system diagrams
9.2 Submit equipment manuals and warranty information
9.3 Conduct basic operational training for owner’s personnel
II. Deliverables:
1. Fully installed and functional rooftop air conditioning system
2. Inspection and testing reports
3. As-built drawings and documentation
4. Warranty certificates III. Project Schedule:
1. Project Start Date
2. Substantial Completion
3. Final Completion IV. Roles and Responsibilities:
Contractor:
1. Complete all work in compliance with applicable codes and industry standards
2. Obtain necessary permits and inspections
3. Maintain site safety and adhere to OSHA requirements V. Client:
1. Provide access to the site and IT room
2. Approve submittals and schedules promptly
3. Supply any available documentation related to existing systems VI. Assumptions:
1. Existing units are suitable for reuse
2. Rooftop structure is sufficient or will be reinforced by others
3. Work will occur during standard business hours unless otherwise agreed
4. No hazardous materials (e.g., asbestos) are present VII. Exclusions:
1. Structural roof reinforcement (unless expressly included)
2. Major electrical service upgrades
3. Replacement of air conditioning unit (unless deemed defective)
4. Ongoing maintenance post-installation VIII. Acceptance Criteria:
1. System maintains required temperature for IT room operation
2. Installation adheres to all relevant buildings, electrical, and mechanical codes
3. System passes all inspections and commissioning procedures
File details come from the government source that posted it. Updated .