About this file
This scope of work document outlines vegetation removal services required at bridges, tunnels, culverts, and other structures along roadways in Virginia and North Carolina within the Blue Ridge Parkway. The contractor will cut down and remove all trees 6 inches or less in diameter, woody vegetation, and shrubs from under and adjacent to over 150 bridges, tunnels, box culverts, and other sites listed. Larger trees over 6 inches may also be cut down in some locations. All cut material must be disposed of properly. The contractor will provide all equipment and materials and follow all relevant laws and regulations. Work will be performed over multiple options and locations, with priority given to bridge and overpass work first based on available funding. The National Park Service is soliciting these cyclic vegetation removal services to maintain structures along the Blue Ridge Parkway.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2023 Bridge Vegetation Removal – NPS Districts, VA & NC June 06, 2023
Scope of Work 2023 Cyclic Removal of Vegetation Under and Adjacent to Road Bridges Blue Ridge Parkway
• This scope of work will provide for the cutting down, removal of all trees 6-inches or less
(DBH), woody vegetation, and shrubs under and adjacent to bridges, culverts, and tunnels on the Blue Ridge Parkway in Virginia, and North Carolina. The structures are located between Mile Post (MP) 105.80 to MP 216.40 in Virginia and MP 305 to MP 468 in North Carolina.
• All cut vegetation, tree branches, limbs, and larger debris will be disposed of as required in the attached documents. Any debris that is removed from the job sites and disposed of will be deposited at a legal state or local disposal site.
• The removal areas will be at each end and sides of county, state, and federal bridges, culverts, and tunnel. The buttress walls are constructed rock, steel, and concrete. The dimensions of each area to be cleared is identified in the attached document. A description of each area will be provided as part of this contract.
• Park personnel will identify trees that can damage the bridge structures. Park staff have walked the site locating each borderline tree for the contractor to ensure exact vegetation to remove, as required.
• A list of each work site will be provided with this scope.
• The basic location of the bridges, over and under passes, box culverts, culvert, and tunnel areas has been provided identifying the locations of the trees to be re-moved.
• Contractor will also be responsible for any additional trees that are brought down in the process of the ones identified if they create an unsafe condition.
• Each site is to be left cleared of woody vegetation and shrubs as per attached spreadsheet.
• All tree stumps will be cut parallel to ground surface, and to within 2-inches of the ground.
• All work will be done under a single contract.
• All materials and equipment will be supplied by the Contractor. Materials and methods used should meet all Federal and State laws.
• No heavy equipment is allowed off road unless it is approved by the park point-of-contact prior to use.
• Protection of the Public: The Contractor shall always conduct his/her work as to assure the safety and convenience of the visiting public and to assure the protection of persons and property. Care shall always be taken to regulate the operations to protect visitors on the Parkway. The Contractor shall provide, erect, and maintain all necessary barricades. Take the necessary precautions for protection and safety of the public and park property.
• When possible one lane of the parkway will remain open to traffic and the contractor will provide flagmen, and signage to control traffic as per Federal Highway Standards.
• Any permits required to complete the proposed work will be acquired by the contractor.
• Contractor shall provide a safety plan for this project as per contracting requirements.
There are five groups of work to be completed that are listed in priority order.
Bridges/Overpasses South, Bridges/Overpasses North, Box Culverts North to South, Culverts North to South, and Tunnels. The estimated number of trees 6” and below are listed for each work area. One or, all of the work groups will be completed, as long as, the project funds last. A complete list of work to be completed can be found in the attachments.
1. Virginia Base - Bridges/Overpasses/Box Culverts/Water Culverts: Between MP
105.80 to 174.28 there are 32 total sites to be cleared of saplings, shrubs, and weed whack the grass. Of those 32 sites, nine (9) are bridges where work will be completed adjacent to abutment walls and underneath the bridges (total of approximately 165,000 sq.ft.). Nineteen (19) of the 32 sites are overpasses, underpasses, or box culverts where vegetation will be removed from the ends of the aforementioned structures only. Four (4) of the 32 sites are water culverts where vegetation will be removed a certain distance from the culvert face (see varied distances on spread sheet). The areas and distances for this removal are listed on the attached spread sheets. No large trees (greater than 6” will be removed under this option).
2. Virginia Option 1 - Bridges/Overpasses/Box Culverts/Water Culverts: Between MP 177.46 to 216.4 there are 32 total sites to be cleared of saplings, shrubs, and weed whack the grass. Of those 32 sites, six (6) are bridges where work will be completed adjacent to abutment walls and underneath the bridges (total of approximately 25,025 sq.ft.). Twelve (12) of the 32 sites are overpasses, underpasses, or box culverts where vegetation will be removed from the ends of the aforementioned structures only. Fourteen (14) of the 32 sites are water culverts and retaining wall where vegetation will be removed a certain distance from the culvert face (see varied distances on spread sheet). The areas and distances for this removal are listed on the attached spread sheets. No large trees (greater than 6” will be removed under this option).
3. North Carolina Base - Bridges/Overpasses/Box Culverts/Water Culverts: Between MP 312.06 to 374.24 there are 17 total sites to be cleared of saplings, shrubs, and weed whack the grass. Of those 17 sites, two (2) are bridges where work will be completed adjacent to abutment walls and underneath the bridges (total of approximately 28,125 sq.ft.). Fourteen (14) of the 32 sites are overpasses, underpasses, or box culverts where vegetation will be removed from the ends of the aforementioned structures only. One (1) of the 32 sites are water culverts where vegetation will be removed a certain distance from the culvert face (see varied distances on spread sheet). The areas and distances for this removal are listed on the attached spread sheets. No large trees (greater than 6” will be removed under this option).
4. North Carolina Option 1 - Bridges/Overpasses/Box Culverts/Water Culverts:
Between MP 381.97 to 469.01 there are 19 total sites to be cleared of saplings, shrubs, and weed whack the grass. Of those 19 sites, ten (10) are bridges where work will be completed adjacent to abutment walls and underneath the bridges (total of approximately 111,625 sq.ft.). Six (6) of the 19 sites are overpasses, underpasses, or box culverts where vegetation will be removed from the ends of the aforementioned structures only. Three (3) of the 19 sites are water culverts where vegetation will be removed a certain distance from the culvert face (see varied distances on spread sheet). The areas and distances for this removal are listed on the attached spread sheets. No large trees (greater than 6” will be removed under this option).
5. Virginia Option 2 - Trees Over 6” DBH: Between MP 105.80 to 114.67. There are 16 trees with an average dbh of 10.75”. The trees will be cut in such a way that the downed trees do not block trails, roads, streams, water ways, or cleared spaces in options listed above. Trees will be limbed and lay as close to the ground as possible. All trees branches will be pulled off into the adjacent woods and left to decompose. No tree debris is to be left in the trails, roads, streams, water ways, or cleared spaces.
6. Virginia Option 3 - Trees Over 6” DBH: Between MP 206.1 to 216.4. There are 14 trees with an average dbh of 15.0”. The trees will be cut in such a way that the downed trees do not block trails, roads, streams, water ways, or cleared spaces in options listed above. Trees will be limbed and lay as close to the ground as possible. All tree branches will be pulled off into the adjacent woods and left to decompose. No tree debris is to be left in the trails, roads, streams, water ways, or cleared spaces.
7. North Carolina Option 2 – Tunnels: Between MP 333.35 to 349.05 there are five
(5) tunnels. Each tunnel entrance and exit has approximately 7,750 sq.ft. of vegetation that needs to be cut back. Each end of the tunnels has a heavy vegetation coverage. There are approximately 20 - 2” to 6” dbh trees per end. The tree can be dropped in place but cannot block or obstruct the tunnel entrance.
8. North Carolina Option 3 – Tunnels: Between MP 364.39 to 399.10 there are five
(5) tunnels. Each tunnel entrance and exit has approximately 7,750 sq.ft. of vegetation that needs to be cut back. Each end of the tunnels has a heavy vegetation coverage. There are approximately 20 - 2” to 6” dbh trees per end. The tree can be dropped in place but cannot block or obstruct the tunnel entrance.
9. North Carolina Option 4 – Tunnels: Between MP 400.68 to 404.01 there are five
(5) tunnels. Each tunnel entrance and exit has approximately 7,750 sq.ft. of vegetation that needs to be cut back. Each end of the tunnels has a heavy vegetation coverage. There are approximately 20 - 2” to 6” dbh trees per end. The tree can be dropped in place but cannot block or obstruct the tunnel entrance.
10. North Carolina Option 5 – Tunnels: Between MP 406.72 to 439.70 there are five
(5) tunnels. Each tunnel entrance and exit has approximately 7,750 sq.ft. of vegetation that needs to be cut back. Each end of the tunnels has a heavy vegetation coverage. There are approximately 20 - 2” to 6” dbh trees per end. The tree can be dropped in place but cannot block or obstruct the tunnel entrance.
11. North Carolina Option 6 – Tunnels: Between MP 458.69 to 466.24 there are five
(5) tunnels. Each tunnel entrance and exit has approximately 7,750 sq.ft. of vegetation that needs to be cut back. Each end of the tunnels has a heavy vegetation coverage. There are approximately 20 - 2” to 6” dbh trees per end. The tree can be dropped in place but cannot block or obstruct the tunnel entrance.
Attachments
VIRGINIA BASE BID - 2023
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
022P - MP 105.80 - Culvert Stone 10-foot rule Remove 25'-W, 35'-E Stone Wall
1-8" W, 1-
12" E, 1-8" E
- Light 350 250 0.02 67 600
Keep depth of debris to a minimum of 3" deep.
022P - MP 105.80 - US 460/US-221 N Hwy -
Underpass Stone Wedge (100) Remove 3-8" NE - Medium 4500 4500 0.03 133 1,200
Cleared trees, and shrubs will be removed
023P - MP 107.40 - Webster Road & Davis
Road (Glade Bridge) - Bridge, VA 738 & 636 Steel-10 20-foot rule Remove - - Light 1,800 23,250 1,800 0.62 2,983 26,850 Cleared trees, and shrubs will be removed
024P - MP 108.30 - VA 604 - Glade Creek
Road - Box Culvert Concrete 5-foot rule Remove 1-30" - Medium 450 450 0.02 100 900
Keep depth of debris to a minimum of 3" deep.
025P - MP 111.4 - VA 651- Mountain View
Road - Box Culvert Concrete 5-foot rule Remove - - Medium 450 450 0.02 100 900
Keep depth of debris to a minimum of 3" deep.
026P - MP 112.21 - VA 24 - Washington Road
Overpass Stone Wedge (50) Remove - - Light 1,125 1,125 0.05 250 2,250
Keep depth of debris to a minimum of 3" deep.
027P - MP 113.55 - VA 634 - Hardy Road
Overpass Stone Wedge (50) Remove 1-10" SE - Light 2,250 2,250 0.04 200 1,800
Keep depth of debris to a minimum of 3" deep.
028P - MP 114.67 - Roanoke River Bridge Steel-6 20-foot rule Remove 4-10" E, 4-
10' W
- Medium 1,800 60,000 1,800 1.46 7,067 63,600
Pull trees and shrubs off into the woods.
No cleared debris to be left in the stream
199P - MP 115.22 - Br 1 on Roanoke River
Pkwy Road - Bridge Steel 20 foot rule Remove - - Light 1,600 5,920 1,600 0.21 1,013 9,120
Pull trees and shrubs off into the woods.
No cleared debris to be left in the stream
200P - MP 115.22 - Br 2 on Roanoke River
Pkwy Road - Bridge Steel 20 foot rule Remove - - Medium 2,400 44,400 2,400 1.13 5,467 49,200
Pull trees and shrubs off into the woods.
No cleared debris to be left in the stream bed.
029P - MP 115.32 - VA 618 Highland Road -
Box Culvert Concrete 5-foot rule Remove - - Light 450 450 0.02 100 900
Keep depth of debris to a minimum of 3" deep.
030P - MP 116.33 - Rutrough Road - Box
Culvert Concrete 5-foot rule Remove - - Medium 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.
031P - MP 116.93 - VA 617 - Pitzer Road -
Underpass Stone Wedge (50) Remove - - Light 850 850 0.04 211 1,900
Pull trees and shrubs off into the woods.
032P - MP 117.66 - VA 116 - Jae Valley Road
Overpass Stone Wedge (30) Remove - - Light 1,350 1,350 0.06 300 2,700 Keep depth of debris to a minimum of 3" deep.
033P - MP 118.42 - VA 666 - Bandy Road -
Underpass Stone Wedge (50) Remove - - Light 2,250 2,250 0.10 500 4,500 Pull trees and shrubs off into the woods.
034P - MP 119.24 - VA 668 - Yellow Mountain
Road - Overpass
Stone Wedge (50) Remove - - Medium 2,250 2,250 0.10 500 4,500
Keep depth of debris to a minimum of 3" deep.
035P - MP 120.45 - (0.4 miles on Spur Rd) -
Welcome Valley Road on Mill Mountain Pkwy -
Overpass Steel-3 10-foot rule Remove - - Light 900 2,750 900 0.10 506 4,550
Keep depth of debris to a minimum of 3" deep.
036P - MP 120.45 - (1.7 miles on Spur Rd) - VA
672 - Mill Mountain Pkwy - Overpass Steel-3 10-foot rule Remove - - Light 900 4,400 900 0.14 689 6,200
Pull trees and shrubs off into the woods.
037P - MP 121.2 - VA 220 - Franklin Road -
Bridge Steel-3 20-foot rule Remove - - Medium 1,800 6,750 1,800 0.05 222 10,350
Pull trees and shrubs off into the woods.
038P - MP 122.43 - VA 679 - Buck Mountain
Road Overpass Stone Wedge (30) Remove - - Medium 1,350 1,350 0.06 300 2,700
Pull trees and shrubs off into the woods.
039P - MP 124.0 - VA 615 - N&W RR - Bridge Steel-3 20-foot rule Remove - - Medium 1,400 3,000 1,400 0.13 644 5,800
Pull trees and shrubs off into the woods.
Remove all cleared vegetation between
039P - MP 124.0 - VA 615 - Starlight Lane -
Bridge Steel-3 20-foot rule Remove - - Medium 1,400 3,000 1,400 0.13 644 5,800 Pull trees and shrubs off into the woods.
Estimated Tree Count and Brush density
Estimated Tree Count and Brush density
040P - MP 124.36 - Back Creek & Merriman
Road Overpass Steel-3 20-foot rule Remove - - Light 1,800 10,500 1,800 0.32 1,567 14,100 Pull trees and shrubs off into the woods.
041P - MP 126.02 - VA 688 - Cotton Hill Road
Overpass Concrete 10-foot rule Remove - - Light 450 450 0.02 100 900
Pull trees and shrubs off into the woods.
042P - MP 127.62 - VA 691 - Dawnwood Road
Overpass Concrete 10-foot rule Remove - - Medium 450 450 0.02 100 900
Pull trees and shrubs off into the woods.
044P - MP 128.83 - VA602 - Poage Valley
Road - Bridge Steel-4 10-foot rule Remove - - Medium 900 19,085 900 0.48 2,321 20,885
Pull trees and shrubs off into the woods.
047P - MP 129.6 - Ravine - Bridge Concrete 10-foot rule Remove - - Light 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.
045P - MP 131.0 - VA 690 - Sugar Camp Creek
Road Overpass Concrete 5-foot rule Remove - - Light 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.
048P - MP 150.56 - Paynes Creek Culvert Stone Culvert Rule Remove - - Light 540 540 0.02 120 1,080
Keep depth of debris to a minimum of 3" deep.
049P - MP 155.90 - Meadow Creek Culvert Stone Culvert Rule Remove 80' Stone Wall - - Light 800 800 0.40 178 1,600
Keep depth of debris to a minimum of 3" deep.
052P - MP 165.27 - VA 8 - Parkway Lane South
Overpass Stone Wedge (50) Remove Rhodo - - Light 2,250 2,250 0.10 500 4,500
Cleared trees, and shrubs will be removed
054P - MP 174.28 - Laural Fork Culvert
Stone 10-foot Rule Remove Rhodo - - Light 600 600 0.03 133 1,200
Keep depth of debris to a minimum of 3" deep.
VIRGINIA BASE OPTION 1 -
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
055P - MP 177.46 - Meadows of Dan By-Pass -
Bridge #1 Stone Wedge (50) Remove 1 - Tree in Median 1-20" NW - Medium 2,250 2,250 0.10 500 4,500 Pull trees and shrubs off into the woods.
055P - MP 177.46 - Meadows of Dan By-Pass -
Bridge #2 Stone Wedge (50) Remove 1-20" SW - Medium 2,250 2,250 0.10 500 4,500 Pull trees and shrubs off into the woods.
055P - MP 177.7 - US 58 Bridge Stone 10-foot rule Remove 130' Stone Wall, Rhodo - - Light 1,300 1,300 0.06 289 2,600
Cleared trees, and shrubs will be removed
056P - MP 179.27 - Round Meadow Creek -
Bridge Steel-4 20-foot rule Remove - - Medium 1,800 20,625 1,800 0.56 2,692 24,225 Cleared trees, and shrubs will be removed
057P - MP 180.7 - Mabry Creek Culvert Stone 10-foot rule Remove - - Medium 450 450 0.02 100 900
Keep depth of debris to a minimum of 3" deep.
059P - MP 185.02 - VA 638 - Bell Spur Road -
Box Culvert Concrete 5-foot rule Remove - - Light 450 450 0.02 100 900
Keep depth of debris to a minimum of 3" deep.
060P - MP 188.25 - Pilot View Drive #1 - Box
Culvert Concrete 10-foot rule Remove - - Light 450 450 0.02 100 900
Keep depth of debris to a minimum of 3" deep.
060P - MP 188.95 - Renfro Ridge - Box Culvert Concrete 10-foot rule Remove - - Light 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.
062P - MP 195.3 - VA 608 - Lightning Ridge
Road - Box Culvert Concrete 10-foot rule Remove - - Light 450 450 0.02 100 900 Keep depth of debris to a minimum of 3" deep.
063P - MP 196.6 - VA 682 - South Winchester
Road - Bridge Steel Wedge (50) Remove - - Light 2,250 4,400 2,250 0.20 989 8,900 Pull trees and shrubs off into the woods.
064P - MP 199.5 - US 52 - Fancy Gap Highway
Overpass Stone Wedge (50) Remove - - Light 2,250 2,250 0.10 500 4,500
Cleared trees, and shrubs will be removed
Estimated Tree Count and Brush density
070P - MP 215.85 - VA 89 - Skyline Highway -
Overpass Stone Wedge (80) Remove
Rhodo
- - Medium 3200 3,200 0.09 440 3,960
Cleared trees, and shrubs will be removed
Off MP 115.22 - Box Culvert Over Trail Stone 10-foot rule Remove 70' Stone wall - - Light 100 100 0.0005 22 200
Keep depth of debris to a minimum of 3" deep.
MP 136.0 Clover Hill Road - Box Culvert
Stone Culvert Rule Remove 50' Stone Wall - - Medium 500 500 0.0200 111 1,000 Keep depth of debris to a minimum of 3" deep.
MP 138.4 - Sweet Annie Gap Bridge Stone 5-foot rule Remove Over Path - - Light 450 450 0.02 100 900
Pull trees and shrubs off into the woods.
MP 159.70 - Culvert Stone Culvert Rule Remove 80' Stone Wall - - Light 800 800 0.40 178 1,600
Keep depth of debris to a minimum of 3" deep.
MP 163.70 - Culvert Stone Culvert Rule Remove 10' Stone Wall - - Light 100 100 0.0005 22 200
Keep depth of debris to a minimum of 3" deep.
MP 164.0 - Culvert
Stone Culvert Rule Remove 6' Stone Wall - - Light 60 60 0.0002 13 120 Keep depth of debris to a minimum of 3" deep.
MP 175.8 - Culvert Stone 10-foot Rule Remove 30' Stone Wall, Rhodo - - Medium 300 300 0.01 67 600
Keep depth of debris to a minimum of 3" deep.
MP 179.2 - Culvert Stone 10-foot rule Remove 10' Stone wall - - Medium 100 100 0.0005 22 200
Keep depth of debris to a minimum of 3" deep.
MP 183.98 - Box Culvert Stone 10-foot rule Remove 10' Stone wall - - Light 100 100 0.0005 22 200
Keep depth of debris to a minimum of 3" deep.
MP 187.55 - Culvert Stone 10-foot rule Remove 10' Stone wall - - Light 100 100 0.0005 22 200
Keep depth of debris to a minimum of 3" deep.
MP 206.1 Pipers Gap Rd (Lambsburg Road) -
Box Culvert Concrete 10-foot rule Remove
1-18"-SE, 2-
18"-NE
- Light 900 900 0.0400 200 1,800
Keep depth of debris to a minimum of 3" deep.
MP 209.78 Culvert Stone 10-foot rule Remove 10' Stone wall 2-18" W - Light 100 100 0.0005 22 200
Keep depth of debris to a minimum of 3" deep.
MP 211.50 Culvert Stone 10-foot rule Remove 65' Stone wall 1-20" SE - Light 650 650 0.02 144 1,300 Keep depth of debris to a minimum of 3" deep.
MP 212.1 north of the Blue Ridge Music Center -
Box Culvert Concrete 10-foot rule Remove
90' Stone Wall, Rhodo
- - Medium 900 900 0.04 200 1,800
Keep depth of debris to a minimum of 3" deep.
MP 213.12 - Culvert - Stream Before Peaks
Mountain Road - south of the Blue Ridge Music
Center
Concrete 10-foot rule Remove
90' Stone Wall
- - Medium 900 900 0.04 200 1,800
Pull trees and shrubs off into the woods.
No cleared debris to be left in the stream bed.
MP 215.32 Culvert Stone 10-foot rule Remove 40' Stone Wall
- - Light 400 400 0.02 89 800 Keep depth of debris to a minimum of 3" deep.
MP 216 RT 89 south end on Parkway Right north and south end Parkway left - Overpass Concrete 10-foot rule Remove
100' Stone Wall
- - Light 1000 1,000 0.05 222 2,000
Cleared trees, and shrubs will be removed
MP 216.11 Culvert Concrete 10-foot rule Remove 80' Stone Wall 1-24"-SE, !-
24"-SW
- Medium 800 800 0.40 178 1,600
Keep depth of debris to a minimum of 3" deep.
MP 216.22 Culvert Concrete 10-foot rule Remove 80' Stone Wall
1-30"-SE - Light 800 800 0.40 178 1,600 Keep depth of debris to a minimum of 3" deep.
MP 216.4 Retaining Wall Stone 10-foot rule Remove
320' Stone Wall, One side only 3-24", 2-18" - Light 3200 0 0.07 356 3,200
Keep depth of debris to a minimum of 3" deep.
NORTH CAROLINA BASE BID -
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
100P - MP 312.06 - NC 181, Pineola Overpass Stone Wedge (50) Haul
Away
- 30 Light 2,250 2,250 0.10 500 4,500
101P - MP 315.30 - Camp Creek Culvert Stone Culvert Rule Culvert
Rule
- 10 Heavy 450 450 0.02 100 900
102P - MP 316.40 - 0.32 Mi on Linville Spur
Overpass Linville River
Steel 20-foot rule Lay In
Place Trees mostly near 2" dbh - 12 Heavy 2,400 2,400 0.04 178 1,600
103P - MP 316.40 - 0.39 Mi on Linville Spur
Overpass Linville River
Steel 20-foot rule Lay In
Place Take Poplar,Cherry near creek (SE) and
Willow hanging ove creek (NE) Photo 5
- 2 Heavy 2,400 2,400 0.08 387 3,480
Estimated Tree Count and Brush density
104P - MP 316.40 - 0.74 Mi on Linville Spur
Bridge NC 183
Steel-4 20-foot rule Lay In
Place Trees (2-6") mostly near 2" dbh - 20 Heavy 1,800 26,625 1,800 0.69 3,358 30,225
106P - MP 316.57 - Linville River Bridge Stone Special Rule
Lay Aside
- 45 Heavy 6,000 1,500 19,500 0.62 3,000 27,000
191P - MP 317.47 - Culvert on Linville Spur
Overpass
Culvert Per note Lay In
Place
Upstream end (Parkway Left) only. Cut all woody plants within 5 feet of the headwall in all directions.
- 4 Heavy 600 0.01 67 600
107P - MP 317.48 - US 221 at Linville Falls
Overpass
Stone Wedge (50) SE and SW corners only - 2 Light 2,250 0.10 500 4,500
109P - MP 327.46 - NC 1121 McKinny Gap Box
Culvert
Stone 5-foot rule
Chip In
Place
- Heavy 250 0.01 42 375
110P - MP 330.91 - US 226 Gillespie Gap
Overpass
Stone Wedge (50)
- 2 Heavy 2,250 0.10 500 4,500
192P - MP 332.59 - Lynn Gap Road Box Culvert Stone Wedge (30) Chip In
Place
- 3 Heavy 2,000 0.09 444 4,000
111P MP 333.93 - Little Switzerland Overpass Stone Wedge (50) - Medium 2,250 0.10 500 4,500
MP 335.42 - Bearwallow Gap Box Culvert Stone Wedge (30) - Heavy 2,000 0.09 444 4,000
113P - MP 336.29 - Gooch Gap Box Culvert Stone Wedge (30) - Heavy 1,350 0.06 300 2,700
114P - MP 344.02 - NC 80 Overpass Stone Special Rule
Haul
Away
- Heavy 4,350 0.26 1,239 11,150
112P - MP 345.40- Osborne Knob Road Box
Culvert
Stone Wedge (30) Chip In
Place
- Heavy 1,350 0.06 300 2,700
115P - MP 347.52 - Curtis Creek Road Box
Culvert
Steel 5-foot rule Lay in
Place
- 4 Heavy 450 0.03 161 1,450
NORTH CAROLINA OPTION 1 -
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
116P - MP 381.97 - Riceville Road Overpass
Stone
Wedge (30) Haul
Away
Cut all woody vegetation between headwalls and road pavement. Cut and treat plants growing in or through mortar joints as in photo 6.
- 5 Heavy 1,350 0.06 300 2,700
117P - MP 382.63 - US 70 Bidge Stone Wedge (50) Haul
Away NW and NE X=80. SW and SE X=50 - 11 Light 3,600 0.17 800 7,200
118P - MP 383.36 - I-40 Swannanoa River
Bridge
Steel-10 Special
Rule 3
- Heavy 1,800 1,800 0.77 3,733 33,600
173P - MP 384.72 - US 74A West Culvert Culvert
Culvert Rule Chip
Aside
- 4 Light 450 450 0.02 100 900
119P - MP 384.75 - US 74A Bridge Steel-4 20-foot rule Chip in
Place
- 10 Heavy 1,800 19,750 1,800 0.51 2,483 22,350
186P - MP 384.83 - US 74A East Culvert Culvert Culvert Rule Chip
Aside
- 4 Heavy 600 600 0.03 133 1,200
120P - MP 388.07 - US 25A Sweeten Creek
Road Bridge
Steel-3 20-foot rule Chip In
Place
- 23 Heavy 1,800 7,500 1,800 0.25 1,233 11,100
121P - MP 388.48 - Southern RR Bridge Steel-3 20-foot rule Lay In
Place One 20" Pine - 10 Medium 1,800 7,500 1,800 0.05 250 2,250
122P - MP 388.74 - US 25 Bridge Steel-3 20-foot rule Chip In
Place
- 7 Heavy 1,800 5,625 1,800 0.05 250 2,250
193P - MP 389.85 - Biltmore Estate Road
Overpass
Concrete 5-foot rule 5-foot rule
- Light 250 250 0.01 56 500
123P - MP 390.94 - Dingle Creek Culvert Culvert Culvert Rule Lay Aside Woody plants in wall. - Medium 450 450 0.02 100 900
125P - MP 393.44 - French Broad River Bridge Steel-10 Special Rule
Special
Rule 4
- 25 Heavy 1,800 45,000 1,800 1.12 5,400 48,600
197P - MP 400.25 - Bent Creek Gap Overpass Concrete 5-foot rule Lay In
Place Heavy brush on headwall. - 6 Heavy 450 450 0.02 100 900
126P - MP 411.90 - US 276 Wagon Road Gap
Overpass
Stone Wedge (50) Chip In
Place
- 8 Heavy 2,250 2,250 0.10 500 4,500
128P - MP 423.29 - NC 215 Beech Gap
Overpass
Stone 5-foot rule Chip In
Place Woody plants in wall. - Medium 2,250 2,250 0.10 500 4,500
Estimated Tree Count and Brush density
127P - MP 443.01 - US 23 and US 74 Bridge Steel-4 20-foot rule Chip In
Place
- 13 Heavy 1,800 15,000 1,800 0.43 2,067 18,600
129P - MP 445.68 - US 19 Soco Gap Bridge Steel-4 20-foot rule Chip In
Place SE and SW corners only. - 2 Heavy 1,800 3,750 1,800 0.17 817 7,350
185P - MP 461.60 - Big Witch BIA 405 Box
Culvert
Concrete 5-foot rule Lay in
Place
- 5 Heavy 250 250 0.01 56 500
131P - MP 469.01 - Oconaluftee River - Bridge Steel-5 20-foot rule Per note At north end, Chip In Place. At South
End, Lay In Place.
- 6 Light 1,800 7,500 1,800 0.25 1,233 11,100
VIRGINIA OPTION 2 - 2023
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
022P - MP 105.80 - Culvert Stone 10-foot rule Remove 25'-W, 35'-E Stone Wall
1-8" W, 1-
12" E, 1-8" E
- Light 350 250 0.02 67 600
Keep depth of debris to a minimum of 3" deep.
022P - MP 105.80 - US 460/US-221 N Hwy -
Underpass Stone Wedge (100) Remove 3-8" NE - Medium 4500 4500 0.03 133 1,200
Cleared trees, and shrubs will be removed
023P - MP 107.40 - Webster Road & Davis
Road (Glade Bridge) - Bridge, VA 738 & 636 Steel-10 20-foot rule Remove - - Light 1,800 23,250 1,800 0.62 2,983 26,850 Cleared trees, and shrubs will be removed
024P - MP 108.30 - VA 604 - Glade Creek
Road - Box Culvert Concrete 5-foot rule Remove 1-30" - Medium 450 450 0.02 100 900
Keep depth of debris to a minimum of 3" deep.
025P - MP 111.4 - VA 651- Mountain View
Road - Box Culvert Concrete 5-foot rule Remove - - Medium 450 450 0.02 100 900
Keep depth of debris to a minimum of 3" deep.
026P - MP 112.21 - VA 24 - Washington Road
Overpass Stone Wedge (50) Remove - - Light 1,125 1,125 0.05 250 2,250
Keep depth of debris to a minimum of 3" deep.
027P - MP 113.55 - VA 634 - Hardy Road
Overpass Stone Wedge (50) Remove 1-10" SE - Light 2,250 2,250 0.04 200 1,800
Keep depth of debris to a minimum of 3" deep.
028P - MP 114.67 - Roanoke River Bridge Steel-6 20-foot rule Remove 4-10" E, 4-
10' W
- Medium 1,800 60,000 1,800 1.46 7,067 63,600
Pull trees and shrubs off into the woods.
No cleared debris to be left in the stream
VIRGINIA OPTION 3 - 2023
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
MP 206.1 Pipers Gap Rd (Lambsburg Road) -
Box Culvert Concrete 10-foot rule Remove
1-18"-SE, 2-
18"-NE
- Light 900 900 0.0400 200 1,800
Keep depth of debris to a minimum of 3" deep.
MP 209.78 Culvert Stone 10-foot rule Remove 10' Stone wall 2-18" W - Light 100 100 0.0005 22 200
Keep depth of debris to a minimum of 3" deep.
MP 211.50 Culvert Stone 10-foot rule Remove 65' Stone wall 1-20" SE - Light 650 650 0.02 144 1,300 Keep depth of debris to a minimum of 3" deep.
MP 212.1 north of the Blue Ridge Music Center -
Box Culvert Concrete 10-foot rule Remove
90' Stone Wall, Rhodo
- - Medium 900 900 0.04 200 1,800
Keep depth of debris to a minimum of 3" deep.
MP 213.12 - Culvert - Stream Before Peaks
Mountain Road - south of the Blue Ridge Music
Center
Concrete 10-foot rule Remove
90' Stone Wall
- - Medium 900 900 0.04 200 1,800
Pull trees and shrubs off into the woods.
No cleared debris to be left in the stream bed.
MP 215.32 Culvert Stone 10-foot rule Remove 40' Stone Wall
- - Light 400 400 0.02 89 800 Keep depth of debris to a minimum of 3" deep.
MP 216 RT 89 south end on Parkway Right north and south end Parkway left - Overpass Concrete 10-foot rule Remove
100' Stone Wall
- - Light 1000 1,000 0.05 222 2,000
Cleared trees, and shrubs will be removed
MP 216.11 Culvert Concrete 10-foot rule Remove 80' Stone Wall 1-24"-SE, !-
24"-SW
- Medium 800 800 0.40 178 1,600
Keep depth of debris to a minimum of 3" deep.
MP 216.22 Culvert Concrete 10-foot rule Remove 80' Stone Wall
1-30"-SE - Light 800 800 0.40 178 1,600 Keep depth of debris to a minimum of 3" deep.
Estimated Tree Count and Brush density
Estimated Tree Count and Brush density
Estimated Tree Count and Brush density
MP 216.4 Retaining Wall Stone 10-foot rule Remove
320' Stone Wall, One side only 3-24", 2-18" - Light 3200 0 0.07 356 3,200
Keep depth of debris to a minimum of 3" deep.
NORTH CAROLINA OPTION 2 -
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
134P - MP 333.25 - Tunnel - Little Switzerland Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
135P - MP 336.85 - Tunnel - Wildacres Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
136P - MP 344.5 - Tunnel - Twin No. 1 Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
137P - MP 344.65 - Tunnel - Twin No. 2 Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
138P - MP 349.05 - Tunnel - Rough Ridge Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
NORTH CAROLINA OPTION 3 -
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
139P - MP 364.39 - Tunnel - Craggy Pinnacle Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
140P - MP 365.44 - Tunnel - Craggy Flats Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
141P - MP 374.24 - Tunnel - Tanbark Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
142P - MP 397.05 - Tunnel - Grassy Knob Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
143P - MP 399.10 - Tunnel - Pine Mountain Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
NORTH CAROLINA OPTION 4 -
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
144P - MP 400.68 - Tunnel - Ferrin Knob No. 1 Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
145P - MP 401.18 - Tunnel - Ferrin Knob No. 2 Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
146P - MP 401.18 - Tunnel - Ferrin Knob No. 3 Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
147P - MP 403.05 - Tunnel - Young Pisgah
Ridge
Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
148P - MP 404.01 - Tunnel - Fork Mountain Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
NORTH CAROLINA OPTION 5 -
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
149P - MP 406.72 - Tunnel - Little Pisgah Ridge Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
Estimated Tree Count and Brush density
Estimated Tree Count and Brush density
Estimated Tree Count and Brush density
Estimated Tree Count and Brush density
Estimated Tree Count and Brush density
Estimated Tree Count and Brush density
Estimated Tree Count and Brush density
150P - MP 407.25 - Tunnel - Buck Spring Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
151P - MP 410.02 - Tunnel - Frying Pan Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
152P - MP 422.05 - Tunnel - Devils Courthouse Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
153P - MP 439.70 - Tunnel - Pinnacle Ridge Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
NORTH CAROLINA OPTION 6 -
Bridge Number - Mile Post - Name Disposal
Method
Over 6" dbh 2 - 6" dbh
Brush /
Vines
N End Between
Abutments
S End Acre Total Sq
Yd
Total Sq
Ft
154P - MP 458.69 - Tunnel - Lickstone Ridge Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
155P - MP 459.29 - Tunnel - Bunches Bald Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
156P - MP 461.14 - Tunnel - Big Witch Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
157P - MP 465.69 - Tunnel - Rattlesnake
Mountain
Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
158P - MP 466.24 - Tunnel - Sherill Cove Stone
- 20 Heavy 7,750
50' W each side of the tunnel and 125' W x 50' H centered on tunnel entrance.
Estimated Tree Count and Brush density
| Scope of Work |
| +2023 - Vegetation Project Bridge Matrix.pdf |
| Table 1 |
File details come from the government source that posted it. Updated .